← Back
Elevator cooperative
Sanford Plaza
144-54 SANFORD AVENUE · East Flushing · BIN 4594902
💬 Discuss this project
1952Year Built
6Stories
D4Building Class
R6AZoning
173,358 sfGross Floor Area
180Units
LL97 CoveredRent Stabilized1 Open Violation ▸FISP: SWARMPFDNY Report ↗
Elevator cooperative · Owner of record: SANFORD PLAZA APARTMENT CORP · 84,525 sf lot · 2.05 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalEquipmentLandscape
Site & exterior12p · 2 filings · 10 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
TRIERA CONTRACTING INC903/22/2026
SANFORD PLAZA APARTMENT CORP703/22/2026
SANFORD PLAZA APT CORP C O EBMG403/21/2026
SANFORD PLAZA APT. CORP C/O EBMG203/21/2026
CENTER 1188103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ANURAG UPADHYAY P.E.207/06/2023
ROYAL ENGINEERING, P.C110/25/2017
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
WM ARCH403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TRIERA CONTRACTING INCGeneral Contractor903/21/2026
JIT CONSTR COMPANY CORPGeneral Contractor303/21/2026
ANGLER ELECTRICElectrical103/22/2026
KJK ELECTRIC INCElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CL ENGINEERING P.C.6781207/06/2023
NKM ENGINEERING PLLC6244112/16/2022
Building Lifecycle
All (23)Filed (3)Permit Issued (4)Signed Off (2)Facade (FISP) (6)Violation (3)Inspection (1)Special Inspection (4)
12/15/2025
Cycle 10 facade report submitted
12/15/2025
Cycle 10 facade report signed — SAFE
11/15/2025
Cycle 10 facade inspection completed
08/15/2023
Signed off — Alteration
EXISTING 6 STORY BRICK BUILDING WITH OSP WORK, WITH THE INSTALLATION OF NEW CONCRETE RAMP AND REPLACEMENT OF EXISTING STAIRS ONLY AT THE ENTRANCE OF BUILDING. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY.
Q00800765-I1
08/14/2023
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
07/10/2023
Permit issued — General Construction
Q00800765-I1-GC
07/09/2023
Special inspection requirement — Concrete - Cast-In-Place
CHRISTIAN LOZADA
07/09/2023
Special inspection requirement — Tenant Protection Plan Compliance
NARESH MAHANGU
07/06/2023
Filed — Alteration
EXISTING 6 STORY BRICK BUILDING WITH OSP WORK, WITH THE INSTALLATION OF NEW CONCRETE RAMP AND REPLACEMENT OF EXISTING STAIRS ONLY AT THE ENTRANCE OF BUILDING. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY.
Q00800765-P1
07/06/2023
Special inspection requirement — Tenant Protection Plan Compliance
07/06/2023
Special inspection requirement — Concrete - Cast-In-Place
CHRISTIAN LOZADA
05/17/2023
Signed off — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE.LIVE LOAD 300PSF.
Q00001148-I1
12/16/2022
Filed — Alteration
EXISTING 6 STORY BRICK BUILDING WITH OSP WORK, WITH THE INSTALLATION OF NEW CONCRETE RAMP AND REPLACEMENT OF EXISTING STAIRS ONLY AT THE ENTRANCE OF BUILDING. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY.
Q00800765-I1
08/13/2021
Cycle 9 facade report submitted
08/13/2021
Cycle 9 facade report signed — SWARMP
08/02/2021
Violation issued (ECB, closed)
Local Law
07/20/2021
Cycle 9 facade inspection completed
06/28/2018
Permit issued — Sidewalk Shed
Q00001148-I1-SH
03/09/2018
Permit issued — Sidewalk Shed
Q00001148-I1-SH
11/01/2017
Permit issued — Sidewalk Shed
Q00001148-I1-SH
10/25/2017
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE.LIVE LOAD 300PSF.
Q00001148-I1
11/18/2016
Violation issued (FDNY_NOV, closed)
01/08/2002
Violation issued (ECB, closed)
Local Law
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offJIT CONSTR COMPANY CORP07/10/2023
DOB NOWSidewalk ShedSigned-offTRIERA CONTRACTING INC06/28/2018
DOB NOWSidewalk ShedSigned-offTRIERA CONTRACTING INC03/09/2018
DOB NOWSidewalk ShedSigned-offTRIERA CONTRACTING INC11/01/2017
BISOTISSUEDFUTURA BUILDERS GROUP INC.02/23/2018
BISOTISSUEDFUTURA BUILDERS GROUP INC.02/23/2018
2 projects · most recent 10/25/2021
General Wiring
FiledStatusContractorScope
10/25/2021CompleteANGLER ELECTRICGeneral Wiring
09/01/2021Permit IssuedKJK ELECTRIC INC1 meters, 1 new_meters
1 project · most recent 10/25/2017
Sidewalk Shed
FiledStatusContractorScope
10/25/2017Signed-offTRIERA CONTRACTING INCSidewalk Shed
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
08/14/2023Pass-Final General Construction Non-Directive 14PassView ↗
▾Special Inspection Requirements (DOB NOW) — 4
DateRequirementInspectorRole
07/09/2023Concrete - Cast-In-PlaceCHRISTIAN LOZADAspecial
07/09/2023Tenant Protection Plan ComplianceNARESH MAHANGUspecial
07/06/2023Tenant Protection Plan Compliance—special
07/06/2023Concrete - Cast-In-PlaceCHRISTIAN LOZADAspecial
▾Documents — 68 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/29/2026Q00001148-I1Request digital key ↗
08/25/2026Q00800765-P1Request digital key ↗
08/25/2026Q00800765-I1Request digital key ↗
▸Applications & Permits10
▸BISPLAN / WORK APPROVAL APPLICATION7
12/30/2019421780843Open ↗
05/20/2019421485789Open ↗
05/20/2019421485752Open ↗
Showing 3 of 7 on file for this type
▸BISWORK PERMIT APPLICATION3
12/30/2019421780843Open ↗
02/26/2018421485789Open ↗
02/26/2018421485752Open ↗
▸Seals & Professional Certifications19
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION11
02/06/2020421780843Open ↗
12/30/2019421780843Open ↗
08/22/2019421485752Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/29/2026Q00001148-I1Open ↗
08/25/2026Q00800765-I1Open ↗
08/13/2026Q00800765-P1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature3
08/25/2026Q00800765-P1Open ↗
08/24/2026Q00800765-I1Open ↗
08/24/2026Q00800765-I1Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
12/30/2019421780843Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
12/30/2019421780843Open ↗
▸Safety & Tenant Protection3
▸BISTenant Protection Plan and Notes3
12/30/2019421780843Open ↗
06/02/2017421485789Open ↗
06/01/2017421485752Open ↗
▸Environmental & Asbestos3
▸BISASBESTOS: CERTIFICATION (DEP ACP5)3
12/30/2019421780843Open ↗
06/02/2017421485789Open ↗
06/01/2017421485752Open ↗
▸Energy Compliance9
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS6
02/06/2020421780843Open ↗
12/30/2019421780843Open ↗
08/22/2019421485752Open ↗
Showing 3 of 6 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS3
02/06/2020421780843Open ↗
08/22/2019421485752Open ↗
08/21/2019421485789Open ↗
▸Approvals, Objections & Sign-offs6
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
02/06/2020421780843Open ↗
09/06/2019421485789Open ↗
08/30/2019421485752Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION3
02/06/2020421780843Open ↗
02/26/2018421485752Open ↗
02/26/2018421485789Open ↗
▸Cost, Insurance & Ownership8
▸BISCOST AFFIDAVIT8
02/06/2020421780843Open ↗
12/30/2019421780843Open ↗
08/22/2019421485752Open ↗
Showing 3 of 8 on file for this type
▸Filing & Intake Forms6
▸BISEFILING COVER SHEET3
12/30/2019421780843Open ↗
06/02/2017421485789Open ↗
06/01/2017421485752Open ↗
▸BISADDITIONAL INFORMATION2
06/06/2019421485752Open ↗
06/06/2019421485789Open ↗
▸BISBOROUGH INTAKE FORM1
08/30/2019421485752Open ↗
▸Other Documents1
▸DOB NOWBSA Meeting Minutes/BSA Resolution1
08/29/2026Q00001148-I1Open ↗