← Back
Condo, residential tower (mixed-use, multi-family elevator) [derived]
Sunlight Barclay Tower Condominium
144-69 BARCLAY AVENUE · BIN 4114728
💬 Discuss this project
2014Year Built
7Stories
RMBuilding Class
R7-1Zoning
23,844 sfGross Floor Area
41Units
LL97 CoveredRent Stabilized1 Open Violation ▸FISP: SWARMP
Condo, residential tower (mixed-use, multi-family elevator) [derived] · Owner of record: SUNLIGHT BARCLAY TOWER LLC · 6,912 sf lot · 3.45 FAR built · Flood zone X
Locations of Work
ArchitectureMechanical
Floor 62p · 1 filing · 20 docs
Floor 5
Floor 4
Floor 3
Floor 2
Floor 1
Mezzanine1p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
TCJ CONSTRUCTION903/22/2026
RLCH2303/22/2026
NOEL WONG C/O ADB BLDG CO103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
HPL ENGINEERING P.C.312/19/2024
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MEGA GENERAL CONSTRUCTIONGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HPL ENGINEERING PC5613212/19/2024
Building Lifecycle
All (88)Filed (3)Permit Issued (1)Signed Off (1)Facade (FISP) (3)Violation (37)Inspection (1)Objection (12)Special Inspection (30)
06/18/2025
Violation issued (HPD, closed)
C
06/18/2025
Violation issued (HPD, closed)
C
05/28/2025
Violation issued (HPD, closed)
A
05/28/2025
Violation issued (HPD, closed)
A
05/28/2025
Violation issued (HPD, closed)
A
05/28/2025
Violation issued (HPD, closed)
C
05/28/2025
Violation issued (HPD, closed)
A
05/28/2025
Violation issued (HPD, closed)
A
05/28/2025
Violation issued (HPD, closed)
A
05/28/2025
Violation issued (HPD, closed)
A
01/24/2025
Signed off — Alteration
PROPOSED INTERIOR RENOVATION ON SIXTH FLOOR (UNIT# 6B) IN THE RESIDENTIAL BUILDING. INCLUDING REPAIR AND NEW PARTITION WORK. AS PER PLAN, NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01099153-I1
01/23/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
01/09/2025
Special inspection requirement — Lighting in dwelling units
Fran Huang
01/09/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Fran Huang
01/09/2025
Special inspection requirement — HVAC-R and service water heating system controls
Fran Huang
01/09/2025
Special inspection requirement — Air barrier - visual inspection
Fran Huang
01/09/2025
Special inspection requirement — HVAC-R and service water heating equipment
Fran Huang
01/09/2025
Special inspection requirement — Tenant Protection Plan Compliance
Fran Huang
01/09/2025
Special inspection requirement — Insulation placement and R values
Fran Huang
01/09/2025
Special inspection requirement — Fire-Resistance Rated Construction
Fran Huang
01/09/2025
Special inspection requirement — Energy Code Compliance Inspections
Fran Huang
01/09/2025
Special inspection requirement — Final
Fran Huang
01/09/2025
Special inspection requirement — Mechanical Systems
Fran Huang
01/03/2025
Objection resolved — Addressed
12/27/2024
Objection raised — Energy
12/19/2024
Filed — Alteration
PROPOSED INTERIOR RENOVATION ON SIXTH FLOOR (UNIT# 6B) IN THE RESIDENTIAL BUILDING. INCLUDING REPAIR AND NEW PARTITION WORK. AS PER PLAN, NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01099153-P2
12/19/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Fran Huang
12/19/2024
Special inspection requirement — Mechanical Systems
Fran Huang
12/19/2024
Special inspection requirement — Tenant Protection Plan Compliance
Fran Huang
12/19/2024
Special inspection requirement — Energy Code Compliance Inspections
Fran Huang
12/19/2024
Special inspection requirement — Final
Fran Huang
12/19/2024
Special inspection requirement — Fire-Resistance Rated Construction
Fran Huang
12/19/2024
Special inspection requirement — Air barrier - visual inspection
Fran Huang
12/19/2024
Special inspection requirement — Insulation placement and R values
Fran Huang
12/19/2024
Special inspection requirement — Lighting in dwelling units
Fran Huang
12/19/2024
Special inspection requirement — HVAC-R and service water heating equipment
Fran Huang
12/19/2024
Special inspection requirement — HVAC-R and service water heating system controls
Fran Huang
11/07/2024
Permit issued — Mechanical Systems
Q01099153-I1-GC-CX
10/24/2024
Filed — Alteration
PROPOSED INTERIOR RENOVATION ON SIXTH FLOOR (UNIT# 6B) IN THE RESIDENTIAL BUILDING. INCLUDING REPAIR AND NEW PARTITION WORK. AS PER PLAN, NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01099153-P1
10/23/2024
Special inspection requirement — Mechanical Systems
10/23/2024
Special inspection requirement — Lighting in dwelling units
10/23/2024
Special inspection requirement — HVAC-R and service water heating equipment
10/23/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
10/23/2024
Special inspection requirement — HVAC-R and service water heating system controls
10/23/2024
Special inspection requirement — Insulation placement and R values
10/23/2024
Special inspection requirement — Air barrier - visual inspection
10/23/2024
Special inspection requirement — Fire-Resistance Rated Construction
10/11/2024
Objection resolved — Addressed
09/24/2024
Objection resolved — Addressed
09/23/2024
Objection resolved — Addressed
09/23/2024
Objection resolved — Addressed
09/06/2024
Objection resolved — Addressed
09/03/2024
Objection raised — Other
08/30/2024
Objection raised — Other
08/30/2024
Objection raised — Other
08/30/2024
Objection raised — Inspections
08/30/2024
Objection raised — Other
08/26/2024
Filed — Alteration
PROPOSED INTERIOR RENOVATION ON SIXTH FLOOR (UNIT# 6B) IN THE RESIDENTIAL BUILDING. INCLUDING REPAIR AND NEW PARTITION WORK. AS PER PLAN, NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01099153-I1
05/23/2024
Cycle 9 facade report signed — SWARMP
05/22/2024
Cycle 9 facade inspection completed
Latest 60 of 88 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offMEGA GENERAL CONSTRUCTION11/07/2024
BIS—ISSUEDTCJ CONSTRUCTION INC11/30/2016
BISPLISSUEDQMB PLUMBING & HEATING INC11/11/2016
BISEQISSUEDPILKU CONSTRUCTION SERVIC03/30/2016
BIS—ISSUEDTCJ CONSTRUCTION INC12/15/2015
BISEQISSUEDPILKU CONSTRUCTION SERVIC09/25/2015
BISPLISSUEDQMB PLUMBING & HEATING INC09/24/2015
BIS—ISSUEDTCJ CONSTRUCTION INC09/23/2015
BISEQISSUEDTCJ CONSTRUCTION INC09/23/2015
BISEQISSUEDPILKU CONSTRUCTION SERVIC07/22/2015
BIS—ISSUEDTCJ CONSTRUCTION INC03/09/2015
BIS—ISSUEDTCJ CONSTRUCTION INC09/29/2014
BISEQISSUEDTCJ CONSTRUCTION INC09/25/2014
BISEQISSUEDPILKU CONSTRUCTION SERVIC09/24/2014
BISPLISSUEDQMB PLUMBING & HEATING INC07/17/2014
BIS—ISSUEDTCJ CONSTRUCTION INC12/12/2013
BISEQISSUEDTCJ CONSTRUCTION INC12/12/2013
BISPLISSUEDH & F PLUMBING INC08/07/2013
BIS—ISSUEDADB BLDG CONSULTANTS, INC07/11/2013
BIS—ISSUEDADB BLDG CONSULTANTS, INC07/11/2013
BISEQISSUEDADB BLDG CONSULTANTS, INC07/11/2013
BISEQISSUEDPILKU CONSTRUCTION SERVIC06/27/2013
BIS—ISSUEDFREEDOM CITY CONTRACTING12/14/2012
BISEQISSUEDFREEDOM CITY CONTRACTING12/14/2012
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
01/23/2025Pass-Final General Construction Non-Directive 14PassView ↗
▾Special Inspection Requirements (DOB NOW) — 33
DateRequirementInspectorRole
01/09/2025Lighting in dwelling unitsFran Huangenergy_progress
01/09/2025HVAC-R and service water piping design and insulationFran Huangenergy_progress
01/09/2025HVAC-R and service water heating system controlsFran Huangenergy_progress
01/09/2025Air barrier - visual inspectionFran Huangenergy_progress
01/09/2025HVAC-R and service water heating equipmentFran Huangenergy_progress
01/09/2025Tenant Protection Plan ComplianceFran Huangspecial
01/09/2025Insulation placement and R valuesFran Huangenergy_progress
01/09/2025Fire-Resistance Rated ConstructionFran Huangprogress
01/09/2025Energy Code Compliance InspectionsFran Huangprogress
01/09/2025FinalFran Huangprogress
01/09/2025Mechanical SystemsFran Huangspecial
12/19/2024HVAC-R and service water piping design and insulationFran Huangenergy_progress
12/19/2024Mechanical SystemsFran Huangspecial
12/19/2024Tenant Protection Plan ComplianceFran Huangspecial
12/19/2024Energy Code Compliance InspectionsFran Huangprogress
12/19/2024FinalFran Huangprogress
12/19/2024Fire-Resistance Rated ConstructionFran Huangprogress
12/19/2024Air barrier - visual inspectionFran Huangenergy_progress
12/19/2024Insulation placement and R valuesFran Huangenergy_progress
12/19/2024Lighting in dwelling unitsFran Huangenergy_progress
12/19/2024HVAC-R and service water heating equipmentFran Huangenergy_progress
12/19/2024HVAC-R and service water heating system controlsFran Huangenergy_progress
10/23/2024Mechanical Systems—special
10/23/2024Lighting in dwelling units—energy_progress
10/23/2024HVAC-R and service water heating equipment—energy_progress
Latest 25 of 33.
▾Documents — 236 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/21/2026Q01099153-I1Request digital key ↗
08/21/2026Q01099153-P1Request digital key ↗
08/21/2026Q01099153-P2Request digital key ↗
▸Applications & Permits52
▸BISPLAN / WORK APPROVAL APPLICATION24
06/21/2022421809966Open ↗
05/19/2022421804747Open ↗
01/28/2022421804747Open ↗
Showing 3 of 24 on file for this type
▸BISWORK PERMIT APPLICATION24
12/02/2016420557203Open ↗
04/29/2016420557203Open ↗
03/29/2016440299400Open ↗
Showing 3 of 24 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation2
05/25/2017420577557Open ↗
06/08/2012420577557Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
09/24/2016420557203Open ↗
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
01/25/2022421804747Open ↗
▸Zoning, Tax Lot & Property Records6
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT2
06/16/2022421809966Open ↗
02/10/2022421804747Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION2
06/16/2022421809966Open ↗
02/10/2022421804747Open ↗
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
06/16/2022421809966Open ↗
▸BISZONING DIAGRAM1
01/29/2013420557203Open ↗
▸Seals & Professional Certifications64
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION28
09/08/2017420557203Open ↗
09/08/2017420557203Open ↗
08/31/2017420557203Open ↗
Showing 3 of 28 on file for this type
▸DOB NOWProgress Inspector Seal & Signature18
08/26/2026Q01099153-P2Open ↗
08/26/2026Q01099153-P2Open ↗
08/26/2026Q01099153-P2Open ↗
Showing 3 of 18 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST4
07/30/2015421190053Open ↗
07/02/2013420862187Open ↗
04/01/2013420826271Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
08/26/2026Q01099153-P2Open ↗
08/26/2026Q01099153-P2Open ↗
08/23/2026Q01099153-I1Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM3
07/02/2013420862187Open ↗
03/28/2013420826271Open ↗
Showing 2 of 3 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/21/2026Q01099153-I1Open ↗
08/21/2026Q01099153-P1Open ↗
08/21/2026Q01099153-P2Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
03/29/2016440299400Open ↗
07/24/2015421190053Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
03/29/2016440299400Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
03/29/2016440299400Open ↗
▸Trade Schedules & Equipment12
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE4
03/01/2017420557203Open ↗
11/21/2016420557203Open ↗
10/13/2016420557203Open ↗
Showing 3 of 4 on file for this type
▸BISSEWER CONNECTION: DEP SD1 & SD22
01/29/2013420557203Open ↗
01/29/2013420557203Open ↗
▸BISSCHEDULE B - PLUMBING2
08/18/2012420557203Open ↗
Showing 1 of 2 on file for this type
▸BISSELF-CERT PLUMBING NOTICE2
08/18/2015420557203Open ↗
09/03/2014420557203Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA1
07/18/2017421246182Open ↗
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
05/10/2017420557203Open ↗
▸Safety & Tenant Protection7
▸BISDS1-Demolition Submittal Certification Form2
11/19/2012420590033Open ↗
12/19/2012420590033Open ↗
▸BISST-1 Street Tree Checklist1
01/29/2013420557203Open ↗
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE1
07/16/2013420557203Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
06/02/2017420557203Open ↗
▸BISSTREET TREE SUPPORTING DOCUMENT1
05/10/2017420577557Open ↗
▸BISSTREET TREE CHECKLIST1
05/30/2017420557203Open ↗
▸Environmental & Asbestos1
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
06/08/2012420577557Open ↗
▸Energy Compliance8
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS4
05/30/2017420557203Open ↗
05/04/2017420557203Open ↗
05/04/2017420557203Open ↗
Showing 3 of 4 on file for this type
▸BISTR8: Energy Code Progress Inspections2
07/16/2013420557203Open ↗
01/29/2013420557203Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
05/10/2017420557203Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
03/29/2016440299400Open ↗
▸Inspections & Test Reports11
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER4
05/26/2017420557203Open ↗
04/25/2017420577557Open ↗
07/17/2013420557203Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX2
07/17/2013420557203Open ↗
07/16/2013420557203Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION2
05/30/2017420557203Open ↗
Showing 1 of 2 on file for this type
▸BISBORINGS - TEST PITS (TR-4) 27-7201
01/29/2013420557203Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY1
03/29/2016440299400Open ↗
▸BISHYDRO FLOW TEST LETTER1
01/29/2013420557203Open ↗
▸Approvals, Objections & Sign-offs33
▸BISLETTERS - SUPPORTING DOCUMENTATION12
05/19/2022421804747Open ↗
01/25/2022421804747Open ↗
10/17/2017420557203Open ↗
Showing 3 of 12 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST8
10/05/2017420557203Open ↗
07/25/2017421246182Open ↗
07/24/2017421246182Open ↗
Showing 3 of 8 on file for this type
▸BISADMINISTRATIVE OBJECTIONS5
12/12/2015421246182Open ↗
07/24/2015421190053Open ↗
06/29/2013420862187Open ↗
Showing 3 of 5 on file for this type
▸BISSUPERSEDING LETTER4
11/06/2014420557203Open ↗
11/06/2014420557203Open ↗
08/05/2014420557203Open ↗
Showing 3 of 4 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE3
12/12/2016420557203Open ↗
12/02/2016420557203Open ↗
12/10/2012420557203Open ↗
▸BISSHED LETTER1
09/29/2014420862187Open ↗
▸Cost, Insurance & Ownership13
▸BISPROJECT-SPECIFIC GL INSURANCE6
12/02/2016420557203Open ↗
10/13/2015420557203Open ↗
10/03/2014420557203Open ↗
Showing 3 of 6 on file for this type
▸BISCOST AFFIDAVIT3
03/08/2017421246182Open ↗
01/30/2014420826271Open ↗
04/01/2013420826271Open ↗
▸BISDEPT OF FINANCE VERIFICATION2
01/25/2022421804747Open ↗
06/26/2017420557203Open ↗
▸BISAcord 25 (Acord Certificate of Liability Insurance)1
07/17/2013420557203Open ↗
▸BISPROJECT SPECIFIC GENERAL LIABILITY INSURANCE (PGLI)1
07/16/2013420557203Open ↗
▸Filing & Intake Forms20
▸BISEFILING COVER SHEET10
06/21/2022421809966Open ↗
05/19/2022421804747Open ↗
12/12/2015421246182Open ↗
Showing 3 of 10 on file for this type
▸BISADDITIONAL INFORMATION6
08/31/2017420557203Open ↗
06/20/2017420557203Open ↗
06/19/2017420557203Open ↗
Showing 3 of 6 on file for this type
▸BISBOROUGH INTAKE FORM2
10/17/2017420557203Open ↗
10/05/2017420557203Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
03/29/2016440299400Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
06/08/2012420577557Open ↗
▸Other Documents4
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
12/12/2012420590033Open ↗
12/12/2012420590033Open ↗
▸BISLOCAL LAW - SUPPPORTING DOCUMENTATION1
05/26/2017420557203Open ↗
▸BISRECORDS MGMT FEE PAYMENT RECEIPT1
06/16/2022421809966Open ↗