ArchitectureStructuralElectricalMechanicalPlumbingFire Protection
Roof29p · 5 filings · 20 docs
Bulkhead1p · 1 filing · 5 docs
Floor 222p · 2 filings · 20 docs
Floor 124p · 2 filings · 20 docs
Cellar28p · 4 filings · 20 docs
Basement26p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
WNS DEVELOPMENT3807/08/2026
BENSON-BAY DEVELOPMENT LLC103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
09/16/2024$2.9M—BENSON - BAY DEVELOPMENT LLC → Private party$406/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SIMINO ARCHITECT507/22/2024
LEVIN ENGINEERING PLLC504/12/2024
C&P DESIGN CONSULTANTS104/11/2023
BRICOLAGE DESIGNS102/28/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
D S CREATIVE INOVATIONS803/21/2026
LEVIN ENGINEERING PLLC803/21/2026
SIMINO ARCHITECT203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SAPOL CONSTRUCTION LLCGeneral Contractor707/08/2026
ROM PIPING & HTG INCPlumbing207/08/2026
SHELBY ELECTRICAL CORPElectrical103/22/2026
ROM PIPING & HEATING INCFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
METRIC CONSULTING AND INS18031107/22/2024
Building Lifecycle
All (129)Filed (12)Permit Issued (8)Signed Off (5)Inspection (18)Objection (56)Special Inspection (30)
12/26/2025
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
12/24/2025
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
08/01/2024
Special inspection requirement — Insulation placement and R values
SAMI HAJJAR P.E
08/01/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
SAMI HAJJAR P.E
08/01/2024
Special inspection requirement — Fenestration areas
SAMI HAJJAR P.E
08/01/2024
Special inspection requirement — Air barrier - visual inspection
SAMI HAJJAR P.E
08/01/2024
Special inspection requirement — Energy Code Compliance Inspections
SAMI HAJJAR P.E
08/01/2024
Special inspection requirement — Combustible Exterior Wall Coverings
SAMI HAJJAR P.E
08/01/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
SAMI HAJJAR P.E
08/01/2024
Special inspection requirement — Metering
SAMI HAJJAR P.E
08/01/2024
Special inspection requirement — Fenestration air leakage
SAMI HAJJAR P.E
08/01/2024
Special inspection requirement — Permanent certificate
SAMI HAJJAR P.E
08/01/2024
Special inspection requirement — Maintenance information
SAMI HAJJAR P.E
08/01/2024
Special inspection requirement — Interior lighting power
SAMI HAJJAR P.E
08/01/2024
Special inspection requirement — Fire-Resistance Rated Construction
SAMI HAJJAR P.E
08/01/2024
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
SAMI HAJJAR P.E
08/01/2024
Special inspection requirement — Air barrier — testing
SAMI HAJJAR P.E
08/01/2024
Special inspection requirement — Protection of exposed foundation insulation
SAMI HAJJAR P.E
08/01/2024
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
WILLIAM MONTAGUE
07/22/2024
Filed — New Building
NEW 2-STORY, BASEMENT AND CELLAR SEMI-DETACHED 3-FAMILY RESIDENTIAL BUILDING.
B00813987-P4
07/21/2024
Special inspection requirement — Air barrier - visual inspection
SAMI HAJJAR P.E
07/21/2024
Special inspection requirement — Fenestration air leakage
SAMI HAJJAR P.E
07/21/2024
Special inspection requirement — Insulation placement and R values
SAMI HAJJAR P.E
07/21/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
SAMI HAJJAR P.E
07/21/2024
Special inspection requirement — Permanent certificate
SAMI HAJJAR P.E
07/21/2024
Special inspection requirement — Fire-Resistance Rated Construction
SAMI HAJJAR P.E
07/21/2024
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
SAMI HAJJAR P.E
07/21/2024
Special inspection requirement — Maintenance information
SAMI HAJJAR P.E
07/21/2024
Special inspection requirement — Interior lighting power
SAMI HAJJAR P.E
07/21/2024
Special inspection requirement — Energy Code Compliance Inspections
SAMI HAJJAR P.E
07/21/2024
Special inspection requirement — Metering
SAMI HAJJAR P.E
07/21/2024
Special inspection requirement — Protection of exposed foundation insulation
SAMI HAJJAR P.E
07/21/2024
Special inspection requirement — Fenestration areas
SAMI HAJJAR P.E
07/10/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/26/2024
Filed — New Building
NEW 2-STORY, BASEMENT AND CELLAR SEMI-DETACHED 3-FAMILY RESIDENTIAL BUILDING.
B00813987-P3
05/28/2024
Signed off — Alteration
INSTALLATION OF PLUMBING SYSTEM FOR ENTIRE BUILDING IN CONJUCTION WITH NEW BUILDING APPLICATION # B00813987. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00836111-I1
05/23/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
05/23/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
05/21/2024
Signed off — Alteration
INSTALLATION OF SPRINKLER SYSTEM FOR ENTIRE BUILDING IN CONJUCTION WITH NEW BUILDING APPLICATION# B00813987. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00835582-I1
05/16/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/10/2024
Signed off — Alteration
PROPOSED 9' CURB CUT TOTAL INCLUDING 2 (18") SPLAYS
B00857410-I1
05/09/2024
Signed off — Alteration
INSTALLATION OF MECHANICAL SYSTEM IN CONJUNCTION WITH NEW BUILDING APPLICATION # B00813987. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00836068-I1
05/09/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
05/09/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
05/09/2024
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
05/09/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/30/2024
Signed off — Alteration
STRUCTURAL PLANS FILED INCONJUCTION WITH NRE BUILDING APPLICATION
B00818583-I1
04/23/2024
Inspection — Fail-Final PL - Up to 9 Requested Floors
Fail
View inspection ↗
04/22/2024
Filed — New Building
NEW 2-STORY, BASEMENT AND CELLAR SEMI-DETACHED 3-FAMILY RESIDENTIAL BUILDING.
B00813987-P2
04/12/2024
Filed — Alteration
INSTALLATION OF PLUMBING SYSTEM FOR ENTIRE BUILDING IN CONJUCTION WITH NEW BUILDING APPLICATION # B00813987. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00836111-P2
04/05/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
03/27/2024
Filed — New Building
NEW 2-STORY, BASEMENT AND CELLAR SEMI-DETACHED 3-FAMILY RESIDENTIAL BUILDING.
B00813987-P1
03/21/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
03/19/2024
Permit issued — Curb Cut
B00857410-I1-CC
03/19/2024
Permit issued — Mechanical Systems
B00836068-I1-MS
12/22/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/20/2023
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
10/19/2023
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
09/21/2023
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
08/03/2023
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
Latest 60 of 129 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offLEON D. DEMATTEIS CONSTR03/19/2024
DOB NOWMechanical SystemsSigned-offLEON D. DEMATTEIS CONSTR03/19/2024
DOB NOWPlumbingSigned-offROM PIPING & HTG INC06/09/2023
DOB NOWPlumbingSigned-offROM PIPING & HEATING INC06/08/2023
DOB NOWSprinklersSigned-offROM PIPING & HTG INC06/08/2023
DOB NOWGeneral ConstructionPermit IssuedLEON D. DEMATTEIS CONSTR05/12/2023
DOB NOWGeneral ConstructionSigned-offLEON D. DEMATTEIS CONSTR04/24/2023
DOB NOWGeneral ConstructionPermit IssuedLEON D. DEMATTEIS CONSTR04/24/2023
1 project · most recent 01/08/2024
General Wiring
FiledStatusContractorScope
01/08/2024CompleteSHELBY ELECTRICAL CORPGeneral Wiring
▾Field Inspections (DOB CAP) — 18
DateTypeResultReport
12/26/2025Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
12/24/2025Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
07/10/2024Pass-Final CND-Occupancy InspectionPassView ↗
05/23/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
05/23/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/16/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/09/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/09/2024Pass-Final CND-Occupancy InspectionPassView ↗
05/09/2024Pass-Final Curb Cut Non-Directive 14PassView ↗
05/09/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/23/2024Fail-Final PL - Up to 9 Requested FloorsFailView ↗
04/05/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
03/21/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
12/22/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/20/2023Pass-Final PL - UndergroundPassView ↗
10/19/2023Pass-Final PL - Up to 9 Requested FloorsPassView ↗
09/21/2023Pass-Final PL - Up to 9 Requested FloorsPassView ↗
08/03/2023Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 92
DateRequirementInspectorRole
08/01/2024Combustible Exterior Wall CoveringsSAMI HAJJAR P.Especial
08/01/2024Subsurface Investigations (Borings/Test Pits)WILLIAM MONTAGUEspecial
08/01/2024Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationSAMI HAJJAR P.Especial
08/01/2024Fire-Resistance Rated ConstructionSAMI HAJJAR P.Eprogress
08/01/2024Energy Code Compliance InspectionsSAMI HAJJAR P.Eprogress
08/01/2024MeteringSAMI HAJJAR P.Eenergy_progress
08/01/2024Interior lighting powerSAMI HAJJAR P.Eenergy_progress
08/01/2024Maintenance informationSAMI HAJJAR P.Eenergy_progress
08/01/2024Insulation placement and R valuesSAMI HAJJAR P.Eenergy_progress
08/01/2024Air barrier - visual inspectionSAMI HAJJAR P.Eenergy_progress
08/01/2024Permanent certificateSAMI HAJJAR P.Eenergy_progress
08/01/2024Fenestration air leakageSAMI HAJJAR P.Eenergy_progress
08/01/2024Fenestration areasSAMI HAJJAR P.Eenergy_progress
08/01/2024Air barrier — testing SAMI HAJJAR P.Eenergy_progress
08/01/2024Protection of exposed foundation insulationSAMI HAJJAR P.Eenergy_progress
08/01/2024Fenestration and door U-factor and product ratingsSAMI HAJJAR P.Eenergy_progress
08/01/2024Fire-Resistant Penetrations and JointsSAMI HAJJAR P.Especial
07/21/2024Air barrier - visual inspectionSAMI HAJJAR P.Eenergy_progress
07/21/2024Subsurface Investigations (Borings/Test Pits)WILLIAM MONTAGUEspecial
07/21/2024Energy Code Compliance InspectionsSAMI HAJJAR P.Eprogress
07/21/2024Fire-Resistance Rated ConstructionSAMI HAJJAR P.Eprogress
07/21/2024Insulation placement and R valuesSAMI HAJJAR P.Eenergy_progress
07/21/2024Air barrier — testing SAMI HAJJAR P.Eenergy_progress
07/21/2024MeteringSAMI HAJJAR P.Eenergy_progress
07/21/2024Interior lighting powerSAMI HAJJAR P.Eenergy_progress
Latest 25 of 92.
▾Documents — 99 on file (BIS + DOB NOW)
▸Plans & Drawings12
▸DOB NOWPlans/Sketch12
08/27/2026B00836111-P2Request digital key ↗
08/27/2026B00836111-I1Request digital key ↗
08/27/2026B00836111-P1Request digital key ↗
Showing 3 of 12 on file for this type
▸Zoning, Tax Lot & Property Records11
▸DOB NOWZD1: DOB Zoning Diagram5
08/13/2026B00813987-I1Open ↗
08/13/2026B00813987-P4Open ↗
08/13/2026B00813987-P2Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWZoning Exhibit form (1-5)5
08/13/2026B00813987-P2Open ↗
08/13/2026B00813987-P1Open ↗
08/13/2026B00813987-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B00813987-I1Open ↗
▸Seals & Professional Certifications41
▸DOB NOWProgress Inspector Seal & Signature16
09/02/2026B00818583-I1Open ↗
09/02/2026B00813987-P4Open ↗
09/02/2026B00813987-P4Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature13
09/02/2026B00818583-I1Open ↗
09/02/2026B00818583-I1Open ↗
09/02/2026B00813987-P4Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature12
08/27/2026B00836068-I1Open ↗
08/27/2026B00857410-I1Open ↗
08/24/2026B00813987-I1Open ↗
Showing 3 of 12 on file for this type
▸Trade Schedules & Equipment5
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)5
08/13/2026B00813987-P1Open ↗
08/13/2026B00813987-I1Open ↗
08/13/2026B00813987-P2Open ↗
Showing 3 of 5 on file for this type
▸Safety & Tenant Protection8
▸DOB NOWStreet Tree Checklist5
08/24/2026B00813987-P1Open ↗
08/24/2026B00813987-P2Open ↗
08/24/2026B00813987-P4Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWStreet Trees Site Plan1
08/13/2026B00813987-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026B00813987-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B00813987-I1Open ↗
▸Inspections & Test Reports6
▸DOB NOWSOIL REPORT5
08/13/2026B00813987-I1Open ↗
08/13/2026B00813987-P4Open ↗
08/13/2026B00813987-P3Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026B00813987-I1Open ↗
▸Other Documents16
▸DOB NOWSite Survey: Initial5
08/13/2026B00813987-P4Open ↗
08/13/2026B00813987-P3Open ↗
08/13/2026B00813987-P2Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone5
08/13/2026B00813987-I1Open ↗
08/13/2026B00813987-P3Open ↗
08/13/2026B00813987-P1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProperty Ownership Certification5
08/24/2026B00813987-P3Open ↗
08/24/2026B00813987-P1Open ↗
08/24/2026B00813987-P2Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWFinal Survey1
08/13/2026B00813987-I1Open ↗