← Back
BuildNYC
Four families
144 BAY 26 STREET
BROOKLYN · Bath Beach · BIN 3167905
💬 Discuss this project
1919Year Built
2Stories
C3Building Class
R5Zoning
1,800 sfGross Floor Area
4Units
Rent Stabilized5 Active Violations ▸FDNY Report ↗
Four families · 4,785 sf lot · 0.38 FAR built · Flood zone X
Locations of Work
Architecture
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 14p · 1 filing · 14 docs
Site & exteriorHot tub and canopy installation1p · 1 filing · 6 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
09/15/2023$1.6M—Private party → Private party$889/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Factory Engineering Works104/14/2025
LWL Associates306/10/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Prime Zone Building Consulting303/21/2026
Kon Ho Lee Consulting Engineer203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Happy House ConstructionGeneral Contractor303/21/2026
Voltron ElectricElectrical103/22/2026
NY Building AssociatesGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Factory Engineering Works8855104/14/2025
Lam and Co Consulting8065206/10/2024
Lam and Co Consulting8864206/10/2024
Building Lifecycle
05/08/2026
Permit expired, never signed off — General Construction
The city's record still shows this permit as issued, with no sign-off on its filing
B01209179-I1-GC
05/01/2026
(a) § hmc:file annual bedbug report in accordance with HPD rule as described on the back of this notice of violation or as described on HPDs…
HPD violation · open
11/19/2025
§27-2107 ADM code owner failed to file a valid registration statement with the department as required by ADM code §27-2097 and is therefore subject…
HPD violation · open
06/06/2025
(a) § hmc:file annual bedbug report in accordance with HPD rule as described on the back of this notice of violation or as described on HPDs…
HPD violation · open
05/08/2025
Permit issued — General Construction
B01209179-I1-GC
32 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedNY Building Associates05/08/2025
DOB NOWGeneral ConstructionSigned-offHappy House Construction11/30/2023
2 projects · most recent 05/13/2024
General Wiring
FiledStatusContractorScope
05/13/2024CompleteKJK ElectricGeneral Wiring
11/22/2023CompleteVoltron Electric—
1 project · most recent 11/27/2023
Fence
FiledStatusContractorScope
11/27/2023——Fence
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
07/01/2024Pass-Final General Construction Non-Directive 14PassView ↗
06/25/2024Fail-Final General Construction Non-Directive 14FailView ↗
▾Special Inspection Requirements (DOB NOW) — 12
DateRequirementInspectorRole
04/28/2025FinalKui Heprogress
04/10/2025Energy Code Compliance InspectionsKui Heprogress
04/10/2025Tenant Protection Plan ComplianceKui Hespecial
04/10/2025Fire-Resistant Penetrations and JointsKui Hespecial
06/11/2024Structural Stability – Alterations of existing buildingsCHI WAI CHUNGspecial
06/11/2024Fire-Resistant Penetrations and JointsJICHEN SUNspecial
06/11/2024Energy Code Compliance InspectionsJICHEN SUNprogress
06/11/2024Interior lighting powerJICHEN SUNenergy_progress
06/06/2024Energy Code Compliance InspectionsJICHEN SUNprogress
06/06/2024Structural Stability – Alterations of existing buildingsCHI WAI CHUNGspecial
06/06/2024Fire-Resistant Penetrations and JointsJICHEN SUNspecial
06/06/2024Interior lighting powerJICHEN SUNenergy_progress
22 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account