← Back
Primarily 3 family with 1 store or office
144 DUANE STREET
MANHATTAN · Tribeca-Civic Center · BIN 1001601
💬 Discuss this project
1860Year Built
5.5Stories
S3Building Class
C6-2AZoning
26,500 sfGross Floor Area
4Units
LL97 CoveredRent Stabilized13 Open Violations ▸FDNY Report ↗
Primarily 3 family with 1 store or office · Owner of record: DUANE STREET LLC · 4,770 sf lot · 5.56 FAR built · Flood zone X500
Locations of Work
Architecture
Floor 614p · 1 filing · 20 docs
Floor 513p · 1 filing · 20 docs
Floor 4
Floor 3
Floor 2
Floor 1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
PLATINUM SERVICES NY807/08/2026
47 EAST 7 LLC703/22/2026
DUANE STREET LLC103/22/2026
144 DUANE STREET3103/22/2026
J A J EQUITIES203/22/2026
144 DUANE STREET CORPO103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
11/12/2013$43.0M—— → —$1,623/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
FRANK PIZZURRO ARCHITECTS PC511/09/2023
ASHRAF CORP212/02/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CONVERSANO ASSOCIATES, INC.403/21/2026
PLATINUM SERVICES NY403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PLATINUM SERVICES NY LLCGeneral Contractor407/08/2026
STRUCTURE TONE, LLCGeneral Contractor203/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
FP ARCHITECTS PC2734207/11/2022
Building Lifecycle
All (82)Filed (7)Permit Issued (3)Signed Off (1)Violation (45)Objection (12)Special Inspection (14)
04/29/2026
Violation issued (HPD, open)
A
11/17/2025
Violation issued (HPD, open)
I
06/04/2025
Violation issued (HPD, open)
A
11/22/2024
Violation issued (HPD, open)
I
04/01/2024
Violation issued (HPD, open)
A
11/16/2023
Objection raised — Structural
11/16/2023
Objection raised — Admin
11/15/2023
Violation issued (HPD, open)
I
11/09/2023
Filed — No Work
M00958606-I1
10/19/2023
Objection raised — Structural
10/19/2023
Objection resolved — Addressed
10/19/2023
Objection raised — Structural
10/19/2023
Objection resolved — Addressed
10/19/2023
Objection raised — Admin
10/19/2023
Objection resolved — Addressed
10/19/2023
Objection raised — Structural
10/19/2023
Objection resolved — Addressed
10/19/2023
Objection raised — Admin
10/19/2023
Objection resolved — Addressed
10/16/2023
Filed — No Work
M00946617-I1
03/27/2023
Signed off — Alteration
INSTALLATION OF 300PSF SIDEWALK SHED AND PIPE SCAFFOLDING AS PER PLANS, ALL EQUIPMENT SHALL COMPLY WITH CHAPTER # 33 OF THE NYC CODE 2014, NO CHANGES IN USE EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M08024003-I1
03/15/2023
Violation issued (HPD, open)
A
01/03/2023
Violation issued (FDNY_NOV, closed)
01/03/2023
Violation issued (FDNY_NOV, closed)
12/02/2022
Filed — Alteration
INSTALLATION OF 300PSF SIDEWALK SHED AND PIPE SCAFFOLDING AS PER PLANS, ALL EQUIPMENT SHALL COMPLY WITH CHAPTER # 33 OF THE NYC CODE 2014, NO CHANGES IN USE EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M08024003-P1
10/22/2022
Permit issued — Sidewalk Shed
M08024003-I1-SF
10/22/2022
Permit issued — Supported Scaffold
M08024003-I1-SH
10/21/2022
Filed — Alteration
INSTALLATION OF 300PSF SIDEWALK SHED AND PIPE SCAFFOLDING AS PER PLANS, ALL EQUIPMENT SHALL COMPLY WITH CHAPTER # 33 OF THE NYC CODE 2014, NO CHANGES IN USE EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M08024003-I1
08/18/2022
Violation issued (FDNY_NOV, closed)
07/15/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
FRANK PIZZURRO
07/15/2022
Special inspection requirement — Final
FRANK PIZZURRO
07/15/2022
Special inspection requirement — Fire-Resistance Rated Construction
FRANK PIZZURRO
07/15/2022
Special inspection requirement — Interior lighting power
FRANK PIZZURRO
07/15/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
FRANK PIZZURRO
07/15/2022
Special inspection requirement — Lighting controls
FRANK PIZZURRO
07/15/2022
Special inspection requirement — Maintenance information
FRANK PIZZURRO
07/11/2022
Filed — Alteration
FILING HEREWITH RENOVATION OF AN EXISTING TRIPLEX APARTMENT AS PER PLANS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY
M00543774-P1
06/28/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
FRANK PIZZURRO
06/28/2022
Special inspection requirement — Final
FRANK PIZZURRO
06/28/2022
Special inspection requirement — Fire-Resistance Rated Construction
FRANK PIZZURRO
06/28/2022
Special inspection requirement — Maintenance information
FRANK PIZZURRO
06/28/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
FRANK PIZZURRO
06/28/2022
Special inspection requirement — Interior lighting power
FRANK PIZZURRO
06/28/2022
Special inspection requirement — Lighting controls
FRANK PIZZURRO
02/15/2022
Violation issued (HPD, open)
A
02/15/2022
Violation issued (HPD, closed)
I
06/29/2021
Permit issued — General Construction
M00543774-I1-GC
06/21/2021
Filed — Alteration
FILING HEREWITH RENOVATION OF AN EXISTING TRIPLEX APARTMENT AS PER PLANS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY
M00543774-I1
06/02/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/01/2021
Violation issued (HPD, open)
A
03/02/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
02/02/2020
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/26/2019
Filed — No Work
M00268937-I1
11/02/2019
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/02/2019
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/02/2019
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/05/2018
Violation issued (HPD, closed)
I
06/18/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
10/24/2016
Violation issued (HPD, closed)
I
02/17/2016
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
Latest 60 of 82 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedSigned-offPLATINUM SERVICES NY LLC10/22/2022
DOB NOWSupported ScaffoldSigned-offPLATINUM SERVICES NY LLC10/22/2022
DOB NOWGeneral ConstructionPermit IssuedSTRUCTURE TONE, LLC06/29/2021
BISSPISSUEDREEM PLBG & HTG CORP06/09/2004
BISPLISSUEDREEM PLBG & HTG CORP03/18/2004
BISOTISSUEDVANGUARD CONSTRUCTION AND02/24/2004
BISOTISSUEDVANGUARD CONSTRUCTION AND02/24/2004
BISMHISSUEDVANGUARD CONSTRUCTION AND02/24/2004
BISPLISSUEDREEM PLBG & HTG CORP07/11/2003
BISPLISSUEDREEM PLBG & HTG CORP07/11/2003
BISEQISSUEDEAGLE SCAFFOLDING SVCS INC05/15/2003
BIS—ISSUEDSTUDIO RIVELLI03/17/2003
BISEQISSUEDTECH CONTR.11/13/2002
BISSPISSUEDREEM PLBG & HTG CORP11/07/2002
BISPLISSUEDREEM PLBG & HTG CORP10/25/2002
BIS—ISSUEDRIVELLI STUDIO INC03/13/2002
BISEQISSUEDROCKLEDGE SCAFFOLD CORP01/08/2002
BIS—ISSUEDRIVELLI STUDIO INC08/14/2001
BISEQISSUEDROCKLEDGE SCAFFOLD CORP07/05/2001
BISOTISSUEDRIVELLI STUDIO INC.07/03/2001
1 project · most recent 10/21/2022
General Wiring
FiledStatusContractorScope
10/21/2022Permit IssuedILLUMINOUS ELECTRIC CORP.General Wiring
1 project · most recent 07/11/2022
FiledStatusContractorScope
07/11/2022Permit IssuedSTRUCTURE TONE, LLC1 scope_items
▾Special Inspection Requirements (DOB NOW) — 14
DateRequirementInspectorRole
07/15/2022Fire-Resistant Penetrations and JointsFRANK PIZZURROspecial
07/15/2022FinalFRANK PIZZURROprogress
07/15/2022Fire-Resistance Rated ConstructionFRANK PIZZURROprogress
07/15/2022Interior lighting powerFRANK PIZZURROenergy_progress
07/15/2022HVAC-R and service water piping design and insulationFRANK PIZZURROenergy_progress
07/15/2022Lighting controlsFRANK PIZZURROenergy_progress
07/15/2022Maintenance informationFRANK PIZZURROenergy_progress
06/28/2022Fire-Resistant Penetrations and JointsFRANK PIZZURROspecial
06/28/2022FinalFRANK PIZZURROprogress
06/28/2022Fire-Resistance Rated ConstructionFRANK PIZZURROprogress
06/28/2022Maintenance informationFRANK PIZZURROenergy_progress
06/28/2022HVAC-R and service water piping design and insulationFRANK PIZZURROenergy_progress
06/28/2022Interior lighting powerFRANK PIZZURROenergy_progress
06/28/2022Lighting controlsFRANK PIZZURROenergy_progress
▾Documents — 31 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch4
09/02/2026M00543774-I1Request digital key ↗
09/02/2026M00543774-P1Request digital key ↗
09/01/2026M08024003-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Temporary Place of Assembly3
09/05/2026M00268937-I1Request digital key ↗
08/15/2026M00946617-I1Request digital key ↗
08/14/2026M00958606-I1Request digital key ↗
▸Applications & Permits2
▸DOB NOWLPC Approval/Permit2
09/02/2026M00543774-P1Open ↗
09/02/2026M00543774-I1Open ↗
▸Seals & Professional Certifications21
▸DOB NOWProgress Inspector Seal & Signature12
09/01/2026M00543774-P1Open ↗
09/01/2026M00543774-P1Open ↗
09/01/2026M00543774-P1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
09/02/2026M00543774-P1Open ↗
09/02/2026M00543774-I1Open ↗
09/01/2026M08024003-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature2
09/01/2026M00543774-P1Open ↗
09/01/2026M00543774-I1Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
09/02/2026M00543774-I1Open ↗