← Back
BuildNYC
Office only, 2-6 stories
144 EAST 62ND STREET
MANHATTAN · BIN 1041992
💬 Discuss this project
1910Year Built
5Stories
O2Building Class
R8BZoning
30,946 sfGross Floor Area
3Units
LL97 Covered0 Active Violations
Office only, 2-6 stories · Owner of record: Andrew W Mellon Foundation · 12,049 sf lot · 2.57 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofAndrew W. Mellon Foundation3p · 1 filing · 4 docs
Floor 1Heavy Duty Sidewalk Shed for NB Construction4p · 2 filings · 6 docs
CellarAndrew W. Mellon Foundation5p · 2 filings · 16 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
The Andrew W. Mellon Foundation1603/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Altieriseborwieber209/25/2024
New Age106/06/2024
Navi Structural Engineering311/18/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
J Callahan Consulting403/21/2026
Eurocelt Expediting603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Universal SystemsScaffold407/08/2026
The Metro GroupGeneral Contractor303/21/2026
City/Suburban PlumbingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PSI Agency254209/25/2024
New Age Engineering7746106/06/2024
Building Lifecycle
All (23)Filed (6)Permit Issued (4)Signed Off (3)Violation (5)Inspection (1)Special Inspection (4)
06/08/2026
Signed off — Alteration
M00619873-I1
11/01/2024
Signed off — Alteration
This Alteration application is being filed for the replacement of boilers and hot water pumps. There are no change in use, egress or occupancy.
M01014026-I1
10/11/2024
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
10/04/2024
Special inspection requirement — Heating Systems
MAURICIO ANDRADE
10/04/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
MAURICIO ANDRADE
09/25/2024
Filed — Alteration
This Alteration application is being filed for the replacement of boilers and hot water pumps. There are no change in use, egress or occupancy.
M01014026-P1
09/25/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
MAURICIO ANDRADE
09/25/2024
Special inspection requirement — Heating Systems
MAURICIO ANDRADE
07/25/2024
Signed off — Alteration
M00936615-I1
06/06/2024
Filed — Alteration
M00936615-I1
06/06/2024
Permit issued — Mechanical Systems
M00936615-I1-MS
05/09/2024
Permit issued — Boiler Equipment
M01014026-I1-BE
03/18/2024
Filed — Alteration
This Alteration application is being filed for the replacement of boilers and hot water pumps. There are no change in use, egress or occupancy.
M01014026-I1
11/18/2021
Filed — Alteration
M00619873-P1
10/28/2021
Permit issued — Supported Scaffold
M00619858-I1-SF
10/28/2021
Permit issued — Sidewalk Shed
M00619873-I1-SH
10/27/2021
Filed — Alteration
M00619873-I1
10/27/2021
Filed — Alteration
M00619858-I1
11/08/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/03/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/02/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/13/2004
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/26/2002
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offThe Metro Group06/06/2024
DOB NOWBoiler EquipmentSigned-offCity/Suburban Plumbing05/09/2024
DOB NOWSupported ScaffoldPermit IssuedUniversal Systems10/28/2021
DOB NOWSidewalk ShedSigned-offShamas Contracting Co10/28/2021
BISPLISSUEDNYC Water Main Works07/19/1999
BISSPISSUEDN.K. Plumbing & Heating04/28/1999
BISOTISSUEDGeorge & Son Contracting04/22/1999
BISOTISSUEDGeorge & Son Contracting03/09/1999
BISPLISSUEDD.c.plmb01/19/1999
BISOTISSUEDGeorge & Son Contracting01/11/1999
BISPLISSUEDD.C. PLG10/01/1998
BISOTISSUEDGeorge & Son Contracting09/23/1998
3 projects · most recent 08/17/2023
General Wiring
FiledStatusContractorScope
08/17/2023CompletePatriot ElectricGeneral Wiring
10/25/2021CompleteTop Shelf Electric—
07/21/2021CompletePatriot Electric—
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
10/11/2024Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 4
DateRequirementInspectorRole
10/04/2024Heating SystemsMAURICIO ANDRADEspecial
10/04/2024Fire-Resistant Penetrations and JointsMAURICIO ANDRADEspecial
09/25/2024Fire-Resistant Penetrations and JointsMAURICIO ANDRADEspecial
09/25/2024Heating SystemsMAURICIO ANDRADEspecial
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Andrew W. Mellon FoundationOfficeCellar, Roof
Project M00936615 Alteration · LOC Issued · 06/06/2024
Project M01014026 Alteration · LOC Issued · 03/18/2024
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 22 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
09/03/2026M00619873-P1Request digital key ↗
09/03/2026M00619873-I1Request digital key ↗
09/03/2026M00619858-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸Seals & Professional Certifications8
▸DOB NOWDPL-1: Design Professional Seal & Signature6
09/03/2026M00619873-I1Open ↗
09/03/2026M00619873-P1Open ↗
09/03/2026M00619858-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature2
09/23/2026M01014026-I1Open ↗
08/24/2026M01014026-P1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/27/2026M01014026-P1Open ↗
08/27/2026M01014026-I1Open ↗
08/27/2026M00936615-I1Open ↗
▸Approvals, Objections & Sign-offs3
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter3
08/27/2026M00936615-I1Open ↗
08/13/2026M01014026-I1Open ↗
08/13/2026M01014026-P1Open ↗
▸Other Documents2
▸DOB NOWProof of Historic Building2
08/13/2026M01014026-I1Open ↗
08/13/2026M01014026-P1Open ↗