Multi-story retail building (2+)
144 FULTON STREET
MANHATTAN · Financial District-Battery Park City · BIN 1001223
💬 Discuss this project
1909Year Built
3Stories
K2Building Class
C5-5Zoning
8,071 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
Multi-story retail building (2+) · Owner of record: 144 FULTON OWNER LLC · 3,003 sf lot · 2.69 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingGeneral
Roof5p · 2 filings · 13 docs
Floor 136p · 2 filings · 20 docs
Site & exterior27p · 2 filings · 18 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CROWN 144 FULTON1603/21/2026
PARKHILL PLANNING + DEVELOPMENT1004/09/2026
CROWN ACQUISITIONS503/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
10/20/2023$38.0M—CROWN 144 FULTON LLC → 144 FULTON OWNER LLC$4,708/sf building
07/27/2015$25.0M—FULTON STREET PARTNERS LLC → CROWN 144 FULTON LLC$3,098/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NEWTEC ENGINEERING112/18/2025
CHIPMAN DESIGN ARCHITECTURE GROUP P209/15/2025
BOHLER106/17/2025
KURZYNSKE & ASSOCIATES205/07/2025
SCHNACKEL ENGINEERS108/28/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BOHLER ENGINEERING503/21/2026
RIP CC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SCHIMENTI CONSTRUCTION COGeneral Contractor404/09/2026
LORICH CONSTRUCTION MANAGEMENTGeneral Contractor203/21/2026
NALICO LLCGeneral Contractor104/09/2026
SHAW MECHANICAL INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
OBAID MIAN849112/18/2025
GRANT ENGINEERING2627409/15/2025
Building Lifecycle
All (101)Filed (7)Permit Issued (6)Signed Off (5)Violation (49)Inspection (2)Objection (2)Special Inspection (30)
03/04/2026
Signed off — Alteration
Construction Fence installation for storefront renovation
M01212467-I1
02/17/2026
Signed off — Alteration
PAA filed herewith to update plans to include MTA details
M01204133-S1
02/17/2026
Signed off — Alteration
PAA filed herewith to update plans to include MTA details
M01204133-S2
02/06/2026
Signed off — Alteration
PAA filed herewith to update plans to include MTA details
M01204133-I1
12/18/2025
Filed — Alteration
Installation of split air conditioning unit. No change in use egress and occupancy.
M01321664-I1
12/18/2025
Permit issued — Mechanical Systems
M01321664-I1-MS
11/19/2025
Special inspection requirement — HVAC-R and service water heating equipment
Obaid Mian
11/19/2025
Special inspection requirement — HVAC-R and service water heating system controls
Obaid Mian
11/19/2025
Special inspection requirement — Maintenance information
Obaid Mian
11/19/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Obaid Mian
11/19/2025
Special inspection requirement — Final
Obaid Mian
11/19/2025
Special inspection requirement — Mechanical Systems
Obaid Mian
10/31/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
09/25/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/25/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Stephen Morse
09/25/2025
Special inspection requirement — Fenestration air leakage
Stephen Morse
09/25/2025
Special inspection requirement — Interior lighting power
Stephen Morse
09/25/2025
Special inspection requirement — Fenestration areas
Stephen Morse
09/25/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Stephen Morse
09/25/2025
Special inspection requirement — Final
Stephen Morse
09/25/2025
Special inspection requirement — Fire-Resistance Rated Construction
Stephen Morse
09/25/2025
Special inspection requirement — Energy Code Compliance Inspections
Stephen Morse
09/25/2025
Special inspection requirement — Air barrier - visual inspection
Stephen Morse
09/25/2025
Special inspection requirement — Lighting controls
Stephen Morse
09/15/2025
Filed — Alteration
PAA filed herewith to update plans to include MTA details
M01204133-P1
08/28/2025
Permit issued — Plumbing
M01204133-S2-PL
08/18/2025
Permit issued — Construction Fence
M01212467-I1-FN
08/05/2025
Special inspection requirement — Energy Code Compliance Inspections
Stephen Morse
08/05/2025
Special inspection requirement — Fire-Resistance Rated Construction
Stephen Morse
08/05/2025
Special inspection requirement — Fenestration areas
Stephen Morse
08/05/2025
Special inspection requirement — Air barrier - visual inspection
Stephen Morse
08/05/2025
Special inspection requirement — Interior lighting power
Stephen Morse
08/05/2025
Special inspection requirement — Lighting controls
Stephen Morse
08/05/2025
Special inspection requirement — Fenestration air leakage
Stephen Morse
08/05/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Stephen Morse
08/05/2025
Special inspection requirement — Final
Stephen Morse
08/05/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Stephen Morse
07/22/2025
Objection resolved — Addressed
07/03/2025
Objection raised — Other
06/17/2025
Filed — Alteration
Construction Fence installation for storefront renovation
M01212467-I1
06/11/2025
Permit issued — General Construction
M01204133-I1-GC
06/11/2025
Permit issued — Mechanical Systems
M01204133-S1-MS
05/07/2025
Filed — Alteration
PAA filed herewith to update plans to include MTA details
M01204133-S1
05/07/2025
Filed — Alteration
PAA filed herewith to update plans to include MTA details
M01204133-S2
05/02/2025
Filed — Alteration
PAA filed herewith to update plans to include MTA details
M01204133-I1
04/15/2025
Special inspection requirement — Mechanical Systems
Stephen Morse
04/15/2025
Special inspection requirement — Final
Stephen Morse
04/15/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Stephen Morse
04/15/2025
Special inspection requirement — Energy Code Compliance Inspections
Stephen Morse
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/21/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
02/21/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
11/27/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/08/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/17/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/17/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/01/2019
Signed off — Alteration
Replace rooftop mechanical refrigeration units onto existing steel dunnage and duct/vent connections as per plan. No change to use, egress, or occupancy proposed.
M00189825-I1
09/03/2019
Violation issued (ECB, closed)
Elevators
08/28/2019
Filed — Alteration
Replace rooftop mechanical refrigeration units onto existing steel dunnage and duct/vent connections as per plan. No change to use, egress, or occupancy proposed.
M00189825-I1
Latest 60 of 101 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedNALICO LLC12/18/2025
DOB NOWPlumbingSigned-offJAMES CRUZ08/28/2025
DOB NOWConstruction FenceSigned-offSCHIMENTI CONSTRUCTION CO08/18/2025
DOB NOWGeneral ConstructionSigned-offSCHIMENTI CONSTRUCTION CO06/11/2025
DOB NOWMechanical SystemsSigned-offSCHIMENTI CONSTRUCTION CO06/11/2025
DOB NOWMechanical SystemsSigned-offLORICH CONSTRUCTION MANAGEMENT08/28/2019
BISFPISSUEDCHIEF FIRE PREV.& MECH CO02/09/2018
BISSPISSUEDENOBRAC PLUMBING, INC11/14/2017
BISPLISSUEDENOBRAC PLUMBING, INC11/06/2017
BIS—ISSUEDLEGACY BUILDERS/DEVELOPERS CORP07/07/2017
BISEQISSUEDLEGACY BUILDERS/DEVELOPERS CORP07/07/2017
BIS—ISSUEDMAUCERI SIGN CO., INC05/17/2017
BISFPISSUEDCHIEF FIRE PREV.& MECH CO04/10/2017
BISEQISSUEDSPRING SCAFFOLDING LLC10/25/2016
BISEQISSUEDSPRING SCAFFOLDING LLC10/24/2016
BISEQISSUEDSPRING SCAFFOLDING LLC10/24/2016
BISSPISSUEDENOBRAC PLUMBING, INC10/17/2016
BISPLISSUEDENOBRAC PLUMBING, INC10/17/2016
BISEQISSUEDLEGACY BUILDERS/DEVELOPERS CORP09/09/2016
BIS—ISSUEDLEGACY BUILDERS/DEVELOPERS CORP09/09/2016
BISOTISSUEDLEGACY BUILDERS/DEVELOPERS CORP08/26/2016
BISPLISSUEDBEDROCK PLBG. & HTG., INC11/24/2015
BISOTRE-ISSUEDLEGACY BUILDERS/DEVELOPERS CORP11/23/2015
1 project · most recent 12/18/2025
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
12/18/2025Permit IssuedNALICO LLCAir Conditioning Systems
Cooling
Mitsubishi Electric PLFY-EP18NEMU 600 CFM · Vrf Indoor ×4
MXZ-SM72TAM-U1 72,000 BTU · Condensing Unit ×1
3 projects · most recent 09/13/2025
General Wiring
FiledStatusContractorScope
09/13/2025CompleteMER ELECTRIC, INCGeneral Wiring
02/05/2019CompleteCLEAR CHANNEL ELECTL SVCSGeneral Wiring
02/05/2019CompleteCLEAR CHANNEL ELECTL SVCSGeneral Wiring
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
10/31/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/25/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 32
DateRequirementInspectorRole
11/19/2025HVAC-R and service water heating equipmentObaid Mianenergy_progress
11/19/2025HVAC-R and service water heating system controlsObaid Mianenergy_progress
11/19/2025Maintenance informationObaid Mianenergy_progress
11/19/2025HVAC-R and service water piping design and insulationObaid Mianenergy_progress
11/19/2025FinalObaid Mianprogress
11/19/2025Mechanical SystemsObaid Mianspecial
09/25/2025Fenestration and door U-factor and product ratingsStephen Morseenergy_progress
09/25/2025Fenestration air leakageStephen Morseenergy_progress
09/25/2025Interior lighting powerStephen Morseenergy_progress
09/25/2025Fenestration areasStephen Morseenergy_progress
09/25/2025Fire-Resistant Penetrations and JointsStephen Morsespecial
09/25/2025FinalStephen Morseprogress
09/25/2025Fire-Resistance Rated ConstructionStephen Morseprogress
09/25/2025Energy Code Compliance InspectionsStephen Morseprogress
09/25/2025Air barrier - visual inspectionStephen Morseenergy_progress
09/25/2025Lighting controlsStephen Morseenergy_progress
08/05/2025Energy Code Compliance InspectionsStephen Morseprogress
08/05/2025Fire-Resistance Rated ConstructionStephen Morseprogress
08/05/2025Fenestration areasStephen Morseenergy_progress
08/05/2025Air barrier - visual inspectionStephen Morseenergy_progress
08/05/2025Interior lighting powerStephen Morseenergy_progress
08/05/2025Lighting controlsStephen Morseenergy_progress
08/05/2025Fenestration air leakageStephen Morseenergy_progress
08/05/2025Fenestration and door U-factor and product ratingsStephen Morseenergy_progress
08/05/2025FinalStephen Morseprogress
Latest 25 of 32.
▾Documents — 348 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch6
08/23/2026M01204133-P1Request digital key ↗
08/23/2026M01204133-S2Request digital key ↗
08/23/2026M01204133-S1Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/05/2026M00189825-I1Request digital key ↗
▸Applications & Permits69
▸BISPLAN / WORK APPROVAL APPLICATION42
06/29/2023122747661Open ↗
06/21/2023122747661Open ↗
09/30/2021122739885Open ↗
Showing 3 of 42 on file for this type
▸BISWORK PERMIT APPLICATION23
02/12/2018123014102Open ↗
11/14/2017122718158Open ↗
11/08/2017122747661Open ↗
Showing 3 of 23 on file for this type
▸BISPLACE OF ASSEMBLY3
05/29/2019123334454Open ↗
02/23/2018123334454Open ↗
10/23/2017123334454Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
09/06/2017122747661Open ↗
▸Seals & Professional Certifications93
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION43
05/29/2019123334454Open ↗
05/09/2018140565546Open ↗
05/03/2018122747661Open ↗
Showing 3 of 43 on file for this type
▸DOB NOWProgress Inspector Seal & Signature11
09/27/2026M01204133-P1Open ↗
09/27/2026M01204133-P1Open ↗
09/23/2026M01321664-I1Open ↗
Showing 3 of 11 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT10
05/24/2017121287008Open ↗
10/20/2016140565555Open ↗
10/20/2016140565546Open ↗
Showing 3 of 10 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST9
05/24/2017121287008Open ↗
Showing 1 of 9 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/23/2026M01204133-P1Open ↗
08/23/2026M01204133-S2Open ↗
08/23/2026M01204133-S1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/27/2026M01204133-P1Open ↗
09/23/2026M01321664-I1Open ↗
08/30/2026M01204133-S1Open ↗
Showing 3 of 5 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
10/20/2016140565555Open ↗
10/20/2016140565546Open ↗
10/20/2016140565500Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
10/20/2016140565555Open ↗
10/20/2016140565546Open ↗
10/20/2016140565500Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Trade Schedules & Equipment18
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE11
02/08/2018122718158Open ↗
02/07/2018122718158Open ↗
01/30/2018122718158Open ↗
Showing 3 of 11 on file for this type
▸BISEQUIPMENT USE PERMITS3
01/31/2019122747661Open ↗
01/31/2019122747661Open ↗
01/31/2019122747661Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA2
03/08/2023122739885Open ↗
03/29/2018123014102Open ↗
▸BIS28-907 REQUIRE FDNY LETTER OF APPROVALFOR FA APPLICATION PRIOR TO ISSUING TEMPORARY CERTIFICATE OF OCCUPANCY. RE-ISPECTION REQUIRE FOR PLACE OF ASSEMBLY CERTIFICATE OF OPERATION.1
06/30/2023122747661Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT1
01/31/2019122747661Open ↗
▸Safety & Tenant Protection3
▸BISTenant Protection Plan and Notes2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSTREET TREE CHECKLIST1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos12
▸BISASBESTOS: CERTIFICATION (DEP ACP5)8
03/09/2017123014102Open ↗
10/20/2016140565546Open ↗
Showing 2 of 8 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISASBESTOS: EXEMPTION (ASB4)1
10/23/2017123334454Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026M01321664-I1Open ↗
▸Energy Compliance11
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS1
10/15/2019122747661Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
10/20/2016140565500Open ↗
▸Inspections & Test Reports9
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER4
05/03/2018122747661Open ↗
05/02/2018122747661Open ↗
05/02/2018122747661Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY2
10/20/2016140565555Open ↗
10/20/2016140565546Open ↗
▸BISINSPECTION REPORT - SUPPORTING DOCUMENTATION2
05/29/2019123334454Open ↗
04/17/2018140565500Open ↗
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs40
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST31
03/09/2023122739885Open ↗
01/22/2021122747661Open ↗
10/22/2020122747661Open ↗
Showing 3 of 31 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION5
03/07/2019122747661Open ↗
03/29/2018123014102Open ↗
02/28/2018140565555Open ↗
Showing 3 of 5 on file for this type
▸BISADMINISTRATIVE OBJECTIONS2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Cost, Insurance & Ownership17
▸BISCOST AFFIDAVIT16
10/15/2019122747661Open ↗
05/01/2018122718158Open ↗
03/29/2018123014102Open ↗
Showing 3 of 16 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
03/09/2023122739885Open ↗
▸Filing & Intake Forms67
▸BISBOROUGH INTAKE FORM35
05/04/2020122747661Open ↗
02/21/2020122747661Open ↗
02/21/2020122747661Open ↗
Showing 3 of 35 on file for this type
▸BISADDITIONAL INFORMATION17
12/04/2019122739885Open ↗
10/30/2019122739885Open ↗
06/03/2019122747661Open ↗
Showing 3 of 17 on file for this type
▸BISEFILING COVER SHEET11
05/24/2017121287008Open ↗
03/09/2017123014102Open ↗
Showing 2 of 11 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET4
10/20/2016140565555Open ↗
10/20/2016140565546Open ↗
10/20/2016140565500Open ↗
Showing 3 of 4 on file for this type
▸Other Documents2
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
01/28/2019122747661Open ↗
▸BISPLOT DIAGRAM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type