BuildNYC
Two stories - detached, small or mid-size
144 LAKE AVENUE
STATEN ISLAND · BIN 5026771
💬 Discuss this project
2020Year Built
2Stories
A1Building Class
R3AZoning
1,728 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 2,898 sf lot · 0.6 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalMechanicalPlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofPhotovoltaic solar panel installation4p · 1 filing · 15 docs
Floor 22 filings · 7 docs
Floor 1Proposed construction fence2p · 4 filings · 11 docs
Sub-Basement2 filings · 7 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
S.I. Northshore Enterprises1107/08/2026
Nathan Holdings703/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Parker and West Engineering211/08/2024
Ryan Design Architecture312/04/2020
William Montague Engineering112/09/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Expedia Consulting303/21/2026
Sunrun203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
JB Buzco PlumbingPlumbing407/08/2026
Paul Toth ExcavationScaffold203/21/2026
Sunrun Installation ServiceGeneral Contractor107/08/2026
Zaim ContractorGeneral Contractor107/08/2026
Quality PlumbingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Parker and West Engineering5272211/08/2024
Building Lifecycle
08/26/2025
Signed off — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S01120855-I1
11/12/2024
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
11/12/2024
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
11/12/2024
Special inspection requirement — Final
Walid Abdulla
11/12/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
33 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSunrun Installation Service10/17/2024
DOB NOWCurb CutSigned-offSuffolk Construction Co05/04/2021
DOB NOWPlumbingSigned-offQuality Plumbing01/13/2021
DOB NOWPlumbingSigned-offJB Buzco Plumbing10/28/2020
DOB NOWConstruction FenceSigned-offPaul Toth Excavation01/17/2020
BIS—ISSUEDZaim Contractor10/26/2020
BIS—ISSUEDPaul Toth Excavation01/22/2020
2 projects · most recent 11/01/2024
General Wiring
FiledStatusContractorScope
11/01/2024CompleteSunrun Solar ElectlGeneral Wiring
01/30/2021CompleteA. J. Caruso Electrical IGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 13
DateRequirementInspectorRole
11/12/2024Energy Code Compliance InspectionsWalid Abdullaprogress
11/12/2024Air barrier - visual inspectionWalid Abdullaenergy_progress
11/12/2024FinalWalid Abdullaprogress
11/12/2024Fire-Resistant Penetrations and JointsWalid Abdullaspecial
11/12/2024Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
11/08/2024Air barrier - visual inspectionWalid Abdullaenergy_progress
11/08/2024Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
11/08/2024Energy Code Compliance InspectionsWalid Abdullaprogress
11/08/2024FinalWalid Abdullaprogress
11/08/2024Fire-Resistant Penetrations and JointsWalid Abdullaspecial
11/23/2020HVAC and service water heating equipment Daniel Ryanenergy_progress
11/23/2020HVAC and service water heating system controls Daniel Ryanenergy_progress
11/23/2020HVAC insulation and sealing Daniel Ryanenergy_progress
108 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account