1992Year Built
3Stories
C6Building Class
R6Zoning
12,267 sfGross Floor Area
9Units
Rent Stabilized9 Open Violations ▸FDNY Report ↗
Walk-up cooperative · Owner of record: S WILLIAMSBURG HDFC · 7,237 sf lot · 1.7 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentGeneral
Roof16p · 2 filings · 16 docs
Floor 423p · 2 filings · 20 docs
Floor 328p · 2 filings · 20 docs
Floor 215p · 1 filing · 20 docs
Floor 119p · 2 filings · 20 docs
Site & exterior5p · 1 filing · 2 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
RELIABLE ENTERPRISES903/22/2026
SOUTH WILLIAMSBURG HDFC403/21/2026
SOUTH WILLIAMSBURG HOMES HDFC203/21/2026
S WILLIAMSBURG HDFC103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
RMM DESIGN STUDIO108/21/2025
FRANKLYN ESTRELLA ARCHITECT PLLC701/14/2025
MJE PROFESSIONAL SERVICES212/22/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ADVANCED BUILDERS SERVICES503/21/2026
EBC CONSULTING203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
RELIABLE ENTERPRISES INCGeneral Contractor603/21/2026
SNBD ENTERPRISES LLCGeneral Contractor107/08/2026
SUNDAY ENERGY LLCGeneral Contractor104/09/2026
ZONE PLUMBING & HEATING CPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
WORLD DESIGN ARCHITECTURE9323108/21/2025
AA BUILDING & INSPECTION15191001/14/2025
Building Lifecycle
All (111)Filed (10)Permit Issued (5)Signed Off (4)Violation (10)Inspection (6)Objection (46)Special Inspection (30)
05/05/2026
Violation issued (HPD, open)
A
12/15/2025
Signed off — Alteration
B01273774-I1
09/05/2025
Permit issued — Solar
B01273774-I1-SL
08/21/2025
Filed — Alteration
B01273774-I1
02/10/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
01/23/2025
Special inspection requirement — Structural Steel - Details
Younes Abouyaala
01/23/2025
Special inspection requirement — Fenestration air leakage
FRANKLYN ESTRELLA
01/23/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
FRANKLYN ESTRELLA
01/23/2025
Special inspection requirement — Air barrier - visual inspection
FRANKLYN ESTRELLA
01/23/2025
Special inspection requirement — Lighting in dwelling units
FRANKLYN ESTRELLA
01/23/2025
Special inspection requirement — Insulation placement and R values
FRANKLYN ESTRELLA
01/23/2025
Special inspection requirement — Energy Code Compliance Inspections
FRANKLYN ESTRELLA
01/23/2025
Special inspection requirement — Final
NAVEEN KUMAR
01/23/2025
Special inspection requirement — Structural Cold-Formed Steel
Younes Abouyaala
01/23/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
01/23/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Younes Abouyaala
01/16/2025
Signed off — Alteration
RELOCATION OF OF PLUMBING FIXTURES AND ADDITION OF NEW PLUMBING FIXTURES IN CONJUNCTION WITH JOB #B08053604-I1 ALL AS PER PLANS FILED HEREWITH.
B00801352-I1
01/14/2025
Filed — Alteration CO
APPLICATION FILED TO VERTICALLY ENLARGE EXISTING 3 STORY BUILDING TO CREATE A NEW 4TH FLOOR AND TO OBTAIN A NEW CERTIFICATE OF OCCUPANCY.
B08053604-P4
01/10/2025
Special inspection requirement — Insulation placement and R values
FRANKLYN ESTRELLA
01/10/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
FRANKLYN ESTRELLA
01/10/2025
Special inspection requirement — Air barrier - visual inspection
FRANKLYN ESTRELLA
01/10/2025
Special inspection requirement — Fenestration air leakage
FRANKLYN ESTRELLA
01/10/2025
Special inspection requirement — Lighting in dwelling units
FRANKLYN ESTRELLA
01/10/2025
Special inspection requirement — Final
NAVEEN KUMAR
01/10/2025
Special inspection requirement — Energy Code Compliance Inspections
FRANKLYN ESTRELLA
01/10/2025
Special inspection requirement — Structural Steel - Details
Younes Abouyaala
01/10/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Younes Abouyaala
01/10/2025
Special inspection requirement — Structural Cold-Formed Steel
Younes Abouyaala
01/10/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
01/09/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
12/10/2024
Objection resolved — Addressed
12/05/2024
Objection raised — Other
11/18/2024
Filed — Alteration CO
APPLICATION FILED TO VERTICALLY ENLARGE EXISTING 3 STORY BUILDING TO CREATE A NEW 4TH FLOOR AND TO OBTAIN A NEW CERTIFICATE OF OCCUPANCY.
B08053604-P3
11/08/2024
Special inspection requirement — Air barrier - visual inspection
FRANKLYN ESTRELLA
11/08/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
11/08/2024
Special inspection requirement — Structural Cold-Formed Steel
Younes Abouyaala
11/08/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Younes Abouyaala
11/08/2024
Special inspection requirement — Structural Steel - Details
Younes Abouyaala
11/08/2024
Special inspection requirement — Energy Code Compliance Inspections
FRANKLYN ESTRELLA
11/08/2024
Special inspection requirement — Final
NAVEEN KUMAR
11/08/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
FRANKLYN ESTRELLA
07/18/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/22/2024
Filed — Alteration
RELOCATION OF OF PLUMBING FIXTURES AND ADDITION OF NEW PLUMBING FIXTURES IN CONJUNCTION WITH JOB #B08053604-I1 ALL AS PER PLANS FILED HEREWITH.
B00801352-P1
03/27/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/20/2024
Signed off — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
B00981499-I1
03/20/2024
Signed off — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
B00981496-I1
03/12/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/20/2024
Objection resolved — Addressed
02/20/2024
Objection resolved — Addressed
02/20/2024
Objection resolved — Addressed
02/12/2024
Permit issued — Plumbing
B00801352-I1-PL
02/09/2024
Objection raised — Other
02/09/2024
Objection raised — Other
02/09/2024
Objection raised — Other
01/24/2024
Filed — Alteration CO
APPLICATION FILED TO VERTICALLY ENLARGE EXISTING 3 STORY BUILDING TO CREATE A NEW 4TH FLOOR AND TO OBTAIN A NEW CERTIFICATE OF OCCUPANCY.
B08053604-P2
01/12/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/12/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
12/26/2023
Permit issued — Supported Scaffold
B00981499-I1-SF
12/22/2023
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
B00981499-I1
12/22/2023
Filed — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
B00981496-I1
Latest 60 of 111 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSUNDAY ENERGY LLC09/05/2025
DOB NOWPlumbingSigned-offZONE PLUMBING & HEATING C02/12/2024
DOB NOWSupported ScaffoldSigned-offRELIABLE ENTERPRISES INC12/26/2023
DOB NOWSidewalk ShedSigned-offRELIABLE ENTERPRISES INC12/22/2023
DOB NOWStructuralPermit IssuedSNBD ENTERPRISES LLC12/18/2023
BISOTISSUEDYESHIVA KEHILATH YAKOV IN05/28/2014
4 projects · most recent 08/05/2025
General Wiring
FiledStatusContractorScope
08/05/2025CompleteAMBER ELECTL CONTNG INC—
02/06/2025CompleteDUNRITE ELECTRICAL CORPGeneral Wiring
02/12/2024Permit IssuedACCURATE ELEC'L CORP.General Wiring
12/22/2023CompleteRICHARD NEU—
1 project · most recent 01/14/2025
Steel
FiledStatusContractorScope
01/14/2025Permit IssuedSNBD ENTERPRISES LLCSteel
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
02/10/2025Pass-Final CND-Occupancy InspectionPassView ↗
01/09/2025Pass-Final CND-Occupancy InspectionPassView ↗
07/18/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/12/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/12/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/12/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 54
DateRequirementInspectorRole
01/23/2025Structural Steel - DetailsYounes Abouyaalaspecial
01/23/2025Fenestration air leakageFRANKLYN ESTRELLAenergy_progress
01/23/2025Fenestration and door U-factor and product ratingsFRANKLYN ESTRELLAenergy_progress
01/23/2025Air barrier - visual inspectionFRANKLYN ESTRELLAenergy_progress
01/23/2025Lighting in dwelling unitsFRANKLYN ESTRELLAenergy_progress
01/23/2025Insulation placement and R valuesFRANKLYN ESTRELLAenergy_progress
01/23/2025Energy Code Compliance InspectionsFRANKLYN ESTRELLAprogress
01/23/2025FinalNAVEEN KUMARprogress
01/23/2025Structural Cold-Formed SteelYounes Abouyaalaspecial
01/23/2025Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
01/23/2025Structural Stability – Alterations of existing buildingsYounes Abouyaalaspecial
01/10/2025Insulation placement and R valuesFRANKLYN ESTRELLAenergy_progress
01/10/2025Fenestration and door U-factor and product ratingsFRANKLYN ESTRELLAenergy_progress
01/10/2025Air barrier - visual inspectionFRANKLYN ESTRELLAenergy_progress
01/10/2025Fenestration air leakageFRANKLYN ESTRELLAenergy_progress
01/10/2025Lighting in dwelling unitsFRANKLYN ESTRELLAenergy_progress
01/10/2025FinalNAVEEN KUMARprogress
01/10/2025Energy Code Compliance InspectionsFRANKLYN ESTRELLAprogress
01/10/2025Structural Steel - DetailsYounes Abouyaalaspecial
01/10/2025Structural Stability – Alterations of existing buildingsYounes Abouyaalaspecial
01/10/2025Structural Cold-Formed SteelYounes Abouyaalaspecial
01/10/2025Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
11/08/2024Air barrier - visual inspectionFRANKLYN ESTRELLAenergy_progress
11/08/2024Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
11/08/2024Structural Cold-Formed SteelYounes Abouyaalaspecial
Latest 25 of 54.
▾Documents — 105 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch10
08/26/2026B00801352-I1Request digital key ↗
08/26/2026B00801352-P1Request digital key ↗
08/26/2026B00981499-I1Request digital key ↗
Showing 3 of 10 on file for this type
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION2
02/27/2025301122602Open ↗
02/21/2025301122602Open ↗
▸Zoning, Tax Lot & Property Records8
▸DOB NOWZD1: DOB Zoning Diagram5
08/13/2026B08053604-P1Open ↗
08/13/2026B08053604-P3Open ↗
08/13/2026B08053604-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWZoning Exhibit form (1-5)2
08/13/2026B08053604-P4Open ↗
08/13/2026B08053604-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B08053604-I1Open ↗
▸Seals & Professional Certifications55
▸DOB NOWProgress Inspector Seal & Signature31
09/18/2026B08053604-P4Open ↗
09/18/2026B08053604-P4Open ↗
09/18/2026B08053604-P4Open ↗
Showing 3 of 31 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature14
09/18/2026B08053604-P4Open ↗
09/18/2026B08053604-P4Open ↗
09/18/2026B08053604-P4Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature10
08/26/2026B00801352-I1Open ↗
08/26/2026B00801352-P1Open ↗
08/26/2026B00981499-I1Open ↗
Showing 3 of 10 on file for this type
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
08/26/2026B00801352-P1Open ↗
08/26/2026B00801352-I1Open ↗
08/20/2026B01273774-I1Open ↗
Showing 3 of 8 on file for this type
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026B01273774-I1Open ↗
▸Other Documents21
▸DOB NOWSite Survey: Initial5
08/13/2026B08053604-P3Open ↗
08/13/2026B08053604-P2Open ↗
08/13/2026B08053604-P1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlot Diagram5
08/13/2026B08053604-P3Open ↗
08/13/2026B08053604-P1Open ↗
08/13/2026B08053604-P4Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProperty Ownership Certification5
08/13/2026B08053604-P1Open ↗
08/13/2026B08053604-P4Open ↗
08/13/2026B08053604-P3Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone5
08/13/2026B08053604-P3Open ↗
08/13/2026B08053604-P2Open ↗
08/13/2026B08053604-P1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWFinal Survey1
08/13/2026B08053604-I1Open ↗