← Back
STATEN ISLAND
144 TWOMBLY AVENUE
STATEN ISLAND · BIN 5177537
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
Locations of Work
Architecture
Permit Issued — active, not yet Signed-off
RoofUnder Construction1p · 1 filing · 9 docs
Floor 2Under Construction7p · 1 filing · 9 docs
Floor 1Under Construction7p · 1 filing · 9 docs
BasementUnder Construction7p · 1 filing · 9 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
MONELLO ENTERPRISES209/17/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JOSEPH M. MORACE, A.I.A., ARCHITECT107/23/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MONELLO ENTERPRISES INCGeneral Contractor109/17/2026
Building Lifecycle
All (31)Filed (1)Permit Issued (1)Objection (2)Special Inspection (27)
09/16/2026
Permit issued — General Construction
S01410680-I1-GC-CX
09/15/2026
Objection resolved — Addressed
08/12/2026
Objection raised — Scope
07/23/2026
Filed — New Building
PROPOSED DETACHED TWO FAMILY RESIDENCE WITH ONE ACCESSORY OFF-STREET PARKING SPACE.
S01410680-I1
06/02/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
06/02/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
06/02/2026
Special inspection requirement — Subgrade Inspections
06/02/2026
Special inspection requirement — Concrete - Cast-In-Place
06/02/2026
Special inspection requirement — Mechanical Systems
06/02/2026
Special inspection requirement — Wood – Prefabricated I-Joists
06/02/2026
Special inspection requirement — Final
06/02/2026
Special inspection requirement — Footing and Foundation
06/02/2026
Special inspection requirement — Energy Code Compliance Inspections
06/02/2026
Special inspection requirement — Fire-Resistance Rated Construction
06/02/2026
Special inspection requirement — Structural Wood Frame
06/02/2026
Special inspection requirement — Duct leakage testing, insulation and design
06/02/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
06/02/2026
Special inspection requirement — Insulation placement and R values
06/02/2026
Special inspection requirement — Electric vehicle service equipment requirements
06/02/2026
Special inspection requirement — Permanent certificate
06/02/2026
Special inspection requirement — Ventilation and air distribution system
06/02/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
06/02/2026
Special inspection requirement — Protection of exposed foundation insulation
06/02/2026
Special inspection requirement — Maintenance information
06/02/2026
Special inspection requirement — Fenestration areas
06/02/2026
Special inspection requirement — Lighting in dwelling units
06/02/2026
Special inspection requirement — HVAC-R and service water heating equipment
06/02/2026
Special inspection requirement — Fenestration air leakage
06/02/2026
Special inspection requirement — Air barrier — testing
06/02/2026
Special inspection requirement — HVAC-R and service water heating system controls
06/02/2026
Special inspection requirement — Air barrier - visual inspection
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedMONELLO ENTERPRISES INC09/16/2026
1 project · most recent 07/23/2026
Concrete Wood
FiledStatusContractorScope
07/23/2026Permit IssuedMONELLO ENTERPRISES INCConcrete, Wood
▾Special Inspection Requirements (DOB NOW) — 27
DateRequirementInspectorRole
06/02/2026Fire-Resistant Penetrations and Joints—special
06/02/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation—special
06/02/2026Subgrade Inspections—special
06/02/2026Concrete - Cast-In-Place—special
06/02/2026Mechanical Systems—special
06/02/2026Wood – Prefabricated I-Joists—special
06/02/2026Final—progress
06/02/2026Footing and Foundation—progress
06/02/2026Energy Code Compliance Inspections—progress
06/02/2026Fire-Resistance Rated Construction—progress
06/02/2026Structural Wood Frame—progress
06/02/2026Duct leakage testing, insulation and design—energy_progress
06/02/2026HVAC-R and service water piping design and insulation—energy_progress
06/02/2026Insulation placement and R values—energy_progress
06/02/2026Electric vehicle service equipment requirements—energy_progress
06/02/2026Permanent certificate—energy_progress
06/02/2026Ventilation and air distribution system—energy_progress
06/02/2026Fenestration and door U-factor and product ratings—energy_progress
06/02/2026Protection of exposed foundation insulation—energy_progress
06/02/2026Maintenance information—energy_progress
06/02/2026Fenestration areas—energy_progress
06/02/2026Lighting in dwelling units—energy_progress
06/02/2026HVAC-R and service water heating equipment—energy_progress
06/02/2026Fenestration air leakage—energy_progress
06/02/2026Air barrier — testing —energy_progress
Latest 25 of 27.
▾Documents — 9 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/14/2026S01410680-I1Request digital key ↗
▸Zoning, Tax Lot & Property Records2
▸DOB NOWZD1: DOB Zoning Diagram1
08/14/2026S01410680-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/14/2026S01410680-I1Open ↗
▸Seals & Professional Certifications1
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/16/2026S01410680-I1Open ↗
▸Trade Schedules & Equipment1
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/14/2026S01410680-I1Open ↗
▸Safety & Tenant Protection1
▸DOB NOWStreet Tree Checklist1
08/14/2026S01410680-I1Open ↗
▸Other Documents3
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/14/2026S01410680-I1Open ↗
▸DOB NOWProperty Ownership Certification1
08/14/2026S01410680-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/14/2026S01410680-I1Open ↗