← Back
BuildNYC
Condo, residential tower (mixed-use, multi-family elevator) [derived]
The 144 W27th Condominium
144 WEST 27TH STREET · BIN 1015053
💬 Discuss this project
1911Year Built
12Stories
RMBuilding Class
M1-8A/R11Zoning
66,740 sfGross Floor Area
25Units
LL97 CoveredRent Stabilized0 Active ViolationsFISP: SAFE
Condo, residential tower (mixed-use, multi-family elevator) [derived] · 6,682 sf lot · 9.99 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingEquipment
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Whole building & multi-floor projectsGas piping replacementUnder Construction1 filing
RoofThe 144 W27th Condo1p · 1 filing · 4 docs
Floor 9Unit 9F, Unit 9R3 filings · 16 docs
Floor 8Vigna and Cho, Unit 8F, Unit 8R3 filings · 16 docs
Floor 7
Floor 6
Floor 5
Floor 4Unit 4F, Unit 4R1p · 3 filings · 15 docs
Floor 3
Floor 2
Floor 1
Site & exteriorThe 144 W27th Condo3 filings · 10 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
144 West 27 St Condominiums6003/21/2026
Pal Real Estate Holdings II603/21/2026
144 W27TH Condo510/04/2026
144 West 27th St Associate403/21/2026
144 WE303/21/2026
27 Street203/21/2026
144 West 2103/21/2026
Prince Media Co103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Municipal Building Consultants103/21/2026
Kna Consulting603/21/2026
Richard Lewis Architect203/21/2026
B A Inspections403/21/2026
AE Design Solution203/21/2026
Aca Associates103/21/2026
Ida Galea, Architect203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Sohome WorkGeneral Contractor404/09/2026
L & Z ConsultingScaffold303/21/2026
Essential RemodelingGeneral Contractor303/21/2026
Home Design Group NYCGeneral Contractor303/21/2026
P&H Electric D/B/A Mage ElectricElectrical203/22/2026
Asa Building MaintenanceGeneral Contractor203/21/2026
Ergo Development & ManagementGeneral Contractor203/21/2026
DPH Plumbing & HeatingPlumbing107/08/2026
WTC Plumbing & HeatingPlumbing109/30/2026
ZFMPlumbing107/08/2026
R.A. Phillips Electrical ContElectrical103/22/2026
R.A. Phillips Electrical ContElectrical103/21/2026
Blu Besi ConstructionGeneral Contractor107/08/2026
L & Z ConsultingGeneral Contractor107/08/2026
RonairGeneral Contractor107/08/2026
Spring ScaffoldingScaffold107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Howard L Zimmerman Architects1712107/30/2026
TSF Engineering1274111/26/2024
BFS Architect7477207/15/2024
Carmen Lenzi Architect5751109/15/2023
Bzinspection8294104/19/2022
DS Engineering Services1608103/09/2021
Twig Special Inspections885112/06/2019
Ida Galea, Architect838108/20/2019
Building Lifecycle
All (167)Filed (15)Permit Issued (15)Signed Off (11)Facade (FISP) (12)Violation (60)Inspection (2)Objection (22)Special Inspection (30)
09/29/2026
Permit issued — Plumbing
M01436742-I1-PL
07/30/2026
Filed — Alteration
GAS PIPING REPLACEMENT. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01436742-I1
07/27/2026
Special inspection requirement — Post-installed Anchors
Jon Colatrella
07/27/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jon Colatrella
07/27/2026
Special inspection requirement — Tenant Protection Plan Compliance
Jon Colatrella
10/17/2025
Permit issued — General Construction
M00934478-I1-GC
03/06/2025
Signed off — Alteration
Install New packaged AC Unit.
M00954340-I1
02/18/2025
Permit issued — Mechanical Systems
M00954340-I1-MS
11/26/2024
Filed — Alteration
Install New packaged AC Unit.
M00954340-I1
10/18/2024
Permit issued — General Construction
M00934478-I1-GC
08/06/2024
Signed off — Alteration
M00838281-I1
07/23/2024
Signed off — Alteration
FILED HEREWITH FOR INTERIOR RENOVATION TO UNIT 9R. NO CHANGE TO USE EGRESS OR OCCUPANCY
M00911260-I1
07/23/2024
Special inspection requirement — Final
Belal Salim
07/23/2024
Special inspection requirement — Tenant Protection Plan Compliance
Belal Salim
07/23/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Belal Salim
07/23/2024
Special inspection requirement — Lighting in dwelling units
Belal Salim
07/23/2024
Special inspection requirement — Fire-Resistance Rated Construction
Belal Salim
07/15/2024
Filed — Alteration
FILED HEREWITH FOR INTERIOR RENOVATION TO UNIT 9R. NO CHANGE TO USE EGRESS OR OCCUPANCY
M00911260-P1
07/08/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Belal Salim
07/08/2024
Special inspection requirement — Tenant Protection Plan Compliance
07/08/2024
Special inspection requirement — Final
Belal Salim
07/08/2024
Special inspection requirement — Fire-Resistance Rated Construction
Belal Salim
07/08/2024
Special inspection requirement — Lighting in dwelling units
Belal Salim
11/03/2023
Permit issued — General Construction
M00934478-I1-GC
10/26/2023
Special inspection requirement — Mechanical Systems
Nicholas Tucci
10/26/2023
Special inspection requirement — Final
Nicholas Tucci
10/25/2023
Filed — Alteration
FILED HEREWITH FOR INTERIOR RENOVATION TO UNIT 9R. NO CHANGE TO USE EGRESS OR OCCUPANCY
M00911260-S1
10/16/2023
Objection resolved — Addressed
09/29/2023
Objection resolved — Addressed
09/27/2023
Permit issued — General Construction
M00911260-I1-GC
09/21/2023
Objection raised — Other
09/21/2023
Objection raised — Other
09/19/2023
Filed — Alteration
FILED HEREWITH FOR INTERIOR RENOVATION TO UNIT 9R. NO CHANGE TO USE EGRESS OR OCCUPANCY
M00911260-I1
09/15/2023
Filed — Alteration
INTERIOR RENOVATION ON THE 8TH FLOOR IN APARTMENT 8F AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
M00934478-I1
09/15/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
CARMEN LENZI
09/15/2023
Special inspection requirement — Interior lighting power
CARMEN LENZI
09/15/2023
Special inspection requirement — Lighting controls
CARMEN LENZI
09/15/2023
Special inspection requirement — Lighting in dwelling units
CARMEN LENZI
09/15/2023
Special inspection requirement — Final
CARMEN LENZI
09/15/2023
Special inspection requirement — Energy Code Compliance Inspections
CARMEN LENZI
04/04/2023
Permit issued — General Construction
M00838281-I1-GC
03/07/2023
Filed — Alteration
M00838281-I1
03/03/2023
Special inspection requirement — Final
Zachary Lewis
03/03/2023
Special inspection requirement — Lighting controls
Mirella Boselli
03/03/2023
Special inspection requirement — Lighting in dwelling units
Mirella Boselli
10/11/2022
Signed off — Alteration
REFURBISH APARTMENT 8-R AS PER DRAWINGS- NO CHANGE TO EXISTING USE EGRESS OR OCCUPANCY
M00709852-I1
10/11/2022
Signed off — Alteration
PLUMBING WORK AT MASTER BATHROOM AND POWDER ROOM AT 8TH FLOOR APARTMENT (8R) IN CONJUNCTION WITH DOB NOW APPLICATION # M00709852. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
M00746116-I1
09/13/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
06/22/2022
Cycle 9 facade report submitted
06/22/2022
Cycle 9 facade report signed — SAFE
06/22/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/08/2022
Cycle 9 facade inspection completed
06/03/2022
Permit issued — Plumbing
M00746116-I1-PL
05/26/2022
Filed — Alteration
PLUMBING WORK AT MASTER BATHROOM AND POWDER ROOM AT 8TH FLOOR APARTMENT (8R) IN CONJUNCTION WITH DOB NOW APPLICATION # M00709852. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
M00746116-I1
05/16/2022
Permit issued — General Construction
M00709852-I1-GC-CX
04/28/2022
Objection resolved — Addressed
04/23/2022
Objection resolved — Addressed
04/21/2022
Objection raised — Admin
04/21/2022
Objection raised — Scope
04/20/2022
Signed off — Alteration
M00617585-I1
Latest 60 of 167 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedWTC Plumbing & Heating09/29/2026
DOB NOWGeneral ConstructionSigned-offSohome Work10/17/2025
DOB NOWMechanical SystemsSigned-offErgo Development Management02/18/2025
DOB NOWGeneral ConstructionSigned-offSohome Work10/18/2024
DOB NOWGeneral ConstructionSigned-offSohome Work11/03/2023
DOB NOWGeneral ConstructionSigned-offEssential Remodeling09/27/2023
DOB NOWGeneral ConstructionSigned-offHome Design Group NYC04/04/2023
DOB NOWPlumbingSigned-offZefi Mechanical06/03/2022
DOB NOWGeneral ConstructionSigned-offAsa Building Maintenance05/16/2022
DOB NOWGeneral ConstructionSigned-offBlu Besi Construction11/17/2021
DOB NOWSidewalk ShedSigned-offSpring Scaffolding06/01/2021
DOB NOWSupported ScaffoldSigned-offL & Z Consulting04/26/2021
DOB NOWGeneral ConstructionSigned-offL & Z Consulting03/20/2021
DOB NOWMechanical SystemsSigned-offRonair06/18/2020
DOB NOWPlumbingSigned-offDPH Plumbing & Heating09/24/2019
BISOTISSUEDBest European Construction09/16/2019
BISSPISSUEDAmerican Standard Plumbing10/18/2018
BISMHISSUEDOmundsen Construction10/17/2018
BISOTISSUEDMTB AMG09/24/2018
BIS—ISSUEDKanaris Contracting05/15/2018
BISOTISSUEDFirst Lotte Construction05/01/2018
BIS—ISSUEDKanaris Contracting05/16/2017
BISSPISSUEDUniversal Fire Sprinkler05/02/2017
BIS—ISSUEDKanaris Contracting04/26/2017
BISOTISSUEDGotham GC03/09/2017
BISOTISSUEDWalter & Samuels07/06/2015
BISOTISSUEDMarvel Contracting Servi*05/07/2015
BISOTISSUEDK.I. of New York12/11/2014
BISOTISSUEDBeechwood Construction10/31/2014
BISOTISSUEDPL-Euro Construction10/09/2014
BISSPISSUEDDanielle Louise02/13/2013
BISPLISSUEDPro Star Plumbing, Heating & Mechanical12/10/2012
BISOTISSUEDPawley Interior Contracting11/16/2012
BIS—ISSUEDRed Hook Sign and Electric01/18/2012
BISSPISSUEDUltimate P & H07/12/2011
BISPLISSUEDUltimate Plumbing and Heating04/13/2011
BISPLISSUEDBedrock Plumbing & Heating03/29/2011
BISMHISSUEDTamc Construction03/25/2011
BISSPISSUEDSafety Fire Sprinkler01/21/2011
BISSPISSUEDSafety Fire Sprinkler01/19/2011
+ 25 more permits on file
2 projects · most recent 07/30/2026
Gas Water/Sanitary
FiledStatusContractorScope
07/30/2026Permit IssuedWTC Plumbing & HeatingGas
07/15/2024——Gas, Water/Sanitary
23 projects · most recent 05/19/2026
General Wiring
FiledStatusContractorScope
05/19/2026CompleteRal-Bar Electric—
01/11/2024CompleteP&H Electric D/B/A Mage ElectricGeneral Wiring
01/11/2024CompleteP&H Electric D/B/A Mage ElectricGeneral Wiring
12/20/2023CompleteR.A. Phillips Electrical ContGeneral Wiring
11/06/2023Permit IssuedW 8 ElectricGeneral Wiring
05/19/2021CompleteTop Shelf Electric—
12/07/2020CompleteIlluminous ElectricGeneral Wiring
09/14/2020CompleteMartinez Electrical ContGeneral Wiring
02/22/2020CompleteP&H Electric D/B/A Mage ElectricGeneral Wiring
02/13/2020CompleteMartinez Electrical ContGeneral Wiring
02/05/2020CompleteP&H Electric D/B/A Mage ElectricGeneral Wiring
02/05/2020CompleteP&H Electric D/B/A Mage ElectricGeneral Wiring
12/06/2019CompleteGeorge HolnessGeneral Wiring
11/25/2019CompleteP&H Electric D/B/A Mage ElectricGeneral Wiring
08/20/2019CompleteP&H Electric D/B/A Mage ElectricGeneral Wiring
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
09/13/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/22/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 34
DateRequirementInspectorRole
07/27/2026Post-installed AnchorsJon Colatrellaspecial
07/27/2026Fire-Resistant Penetrations and JointsJon Colatrellaspecial
07/27/2026Tenant Protection Plan ComplianceJon Colatrellaspecial
07/23/2024FinalBelal Salimprogress
07/23/2024Tenant Protection Plan ComplianceBelal Salimspecial
07/23/2024Fire-Resistant Penetrations and JointsBelal Salimspecial
07/23/2024Lighting in dwelling unitsBelal Salimenergy_progress
07/23/2024Fire-Resistance Rated ConstructionBelal Salimprogress
07/08/2024Fire-Resistant Penetrations and JointsBelal Salimspecial
07/08/2024Tenant Protection Plan Compliance—special
07/08/2024FinalBelal Salimprogress
07/08/2024Fire-Resistance Rated ConstructionBelal Salimprogress
07/08/2024Lighting in dwelling unitsBelal Salimenergy_progress
10/26/2023Mechanical SystemsNicholas Tuccispecial
10/26/2023FinalNicholas Tucciprogress
09/15/2023Fire-Resistant Penetrations and JointsCARMEN LENZIspecial
09/15/2023Interior lighting powerCARMEN LENZIenergy_progress
09/15/2023Lighting controlsCARMEN LENZIenergy_progress
09/15/2023Lighting in dwelling unitsCARMEN LENZIenergy_progress
09/15/2023FinalCARMEN LENZIprogress
09/15/2023Energy Code Compliance InspectionsCARMEN LENZIprogress
03/03/2023FinalZachary Lewisprogress
03/03/2023Lighting controlsMirella Bosellienergy_progress
03/03/2023Lighting in dwelling unitsMirella Bosellienergy_progress
03/31/2022Fire-Resistant Penetrations and JointsBarry Bergspecial
Latest 25 of 34.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Vigna and ChoResidentialFloor 8
Project M00934478 Alteration · Permit Entire · 09/15/2023
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 615 on file (BIS + DOB NOW)
▸Plans & Drawings12
▸DOB NOWPlans/Sketch10
09/04/2026M00480901-I1Request digital key ↗
09/03/2026M00509723-I1Request digital key ↗
09/03/2026M00525334-I1Request digital key ↗
Showing 3 of 10 on file for this type
▸DOB NOWPlans/Sketch - Plumbing1
08/14/2026M00209129-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/05/2026M00263680-I1Request digital key ↗
▸Applications & Permits108
▸BISPLAN / WORK APPROVAL APPLICATION71
05/09/2024101157775Open ↗
01/04/2023101157775Open ↗
05/17/2022101157775Open ↗
Showing 3 of 71 on file for this type
▸BISWORK PERMIT APPLICATION36
09/17/2019140864731Open ↗
10/18/2018140795799Open ↗
10/18/2018140795815Open ↗
Showing 3 of 36 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
08/29/2018140795815Open ↗
▸Zoning, Tax Lot & Property Records1
▸BISZRD1-Zoning Resolution Determination1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications122
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION59
03/27/2020140864731Open ↗
12/05/2019140790400Open ↗
12/05/2019140790400Open ↗
Showing 3 of 59 on file for this type
▸DOB NOWProgress Inspector Seal & Signature21
09/02/2026M00934478-I1Open ↗
09/02/2026M00934478-I1Open ↗
09/02/2026M00934478-I1Open ↗
Showing 3 of 21 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature12
09/03/2026M00617585-I1Open ↗
08/29/2026M00934478-I1Open ↗
08/25/2026M00954340-I1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature10
09/02/2026M00934478-I1Open ↗
09/01/2026M00911260-I1Open ↗
09/01/2026M00911260-I1Open ↗
Showing 3 of 10 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISAPPLICANT OWNER SIGNATURE6
08/22/2019140864731Open ↗
08/29/2018140795815Open ↗
08/23/2018140795799Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment52
▸BISSCHEDULE B - PLUMBING22
04/29/2020140795799Open ↗
04/06/2020140795799Open ↗
03/12/2020140795799Open ↗
Showing 3 of 22 on file for this type
▸BISSELF-CERT PLUMBING NOTICE19
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 19 on file for this type
▸BISEQUIPMENT USE PERMITS4
05/27/2020140795799Open ↗
05/27/2020140795799Open ↗
05/15/2020140795799Open ↗
Showing 3 of 4 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT3
05/27/2020140795799Open ↗
05/15/2020140795799Open ↗
Showing 2 of 3 on file for this type
▸BISSIGN HANGER CERTIFICATE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSPRINKLER INSP REPORT : FP-851
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
10/06/2023101157775Open ↗
▸Safety & Tenant Protection10
▸BISTENANT PROTECTION PLAN AND NOTES8
01/31/2022121712815Open ↗
06/03/2019140790400Open ↗
08/29/2018140795815Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWTenant Protection Plan2
08/13/2026M00263680-I1Open ↗
08/13/2026M00209129-I1Open ↗
▸Environmental & Asbestos42
▸BISASBESTOS: CERTIFICATION (DEP ACP5)16
08/22/2019140864731Open ↗
08/29/2018140795815Open ↗
08/23/2018140795799Open ↗
Showing 3 of 16 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'13
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 13 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report10
09/03/2026M00617585-I1Open ↗
08/29/2026M00934478-I1Open ↗
08/25/2026M00954340-I1Open ↗
Showing 3 of 10 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISASBESTOS-EXEMPTION (ASB4)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance42
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS20
12/05/2019140790400Open ↗
12/05/2019140790400Open ↗
06/28/2018140720655Open ↗
Showing 3 of 20 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS10
05/15/2020140795799Open ↗
03/27/2020140864731Open ↗
12/05/2019140790400Open ↗
Showing 3 of 10 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY10
05/15/2020140795799Open ↗
08/22/2019140864731Open ↗
10/17/2018140795799Open ↗
Showing 3 of 10 on file for this type
▸BISTR8: Energy Code Progress Inspections1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026M00617585-I1Open ↗
▸Inspections & Test Reports17
▸BISTECHNICAL REPORT: RESPONSIBILITY14
05/15/2020140795799Open ↗
12/02/2019140790400Open ↗
12/02/2019140790400Open ↗
Showing 3 of 14 on file for this type
▸BISHYDRAULIC FLOW CALCULATIONS2
09/04/2018140795815Open ↗
Showing 1 of 2 on file for this type
▸BISINSPECTION REPORT - SUPPORTING DOCUMENTATION1
12/05/2019140790400Open ↗
▸Approvals, Objections & Sign-offs63
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST40
01/31/2022121712815Open ↗
02/18/2021101157775Open ↗
11/17/2020101157775Open ↗
Showing 3 of 40 on file for this type
▸BISADMINISTRATIVE OBJECTIONS15
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 15 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION5
03/08/2018101157775Open ↗
Showing 1 of 5 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE3
05/11/2022101157775Open ↗
05/10/2022101157775Open ↗
03/14/2018101157775Open ↗
▸Cost, Insurance & Ownership50
▸BISCOST AFFIDAVIT49
05/15/2020140795799Open ↗
03/27/2020140864731Open ↗
12/23/2019140795815Open ↗
Showing 3 of 49 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Filing & Intake Forms81
▸BISADDITIONAL INFORMATION31
05/03/2022101157775Open ↗
01/12/2022101157775Open ↗
05/08/2020140795799Open ↗
Showing 3 of 31 on file for this type
▸BISEFILING COVER SHEET23
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 23 on file for this type
▸BISBOROUGH INTAKE FORM20
03/27/2020140864731Open ↗
03/02/2020101157775Open ↗
12/23/2019140795815Open ↗
Showing 3 of 20 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET7
08/22/2019140864731Open ↗
08/29/2018140795815Open ↗
08/23/2018140795799Open ↗
Showing 3 of 7 on file for this type
▸Other Documents15
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION7
08/28/2019140864731Open ↗
08/28/2019140864731Open ↗
08/22/2019140864731Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDHCR Document4
08/13/2026M00209129-I1Open ↗
08/13/2026M00746116-I1Open ↗
08/13/2026M00480901-I1Open ↗
Showing 3 of 4 on file for this type
▸BISSupporting Document: Fee Exempt1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISBSA VARIANCE1
12/09/2022101157775Open ↗
▸BISDepartment of Consumer Affairs (DCA) Form1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BIS* FIRE STOPS 27-3451
05/11/2022101157775Open ↗