← Back
STATEN ISLAND
144 WILSON TERRACE
STATEN ISLAND · BIN 5021490
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CHRIS PONISI, ARCHITECT208/10/2026
BLACKSTONE ENGINEERING, PLLC108/05/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
OUR ISLAND PROPERTY MANAGGeneral Contractor108/30/2026
Building Lifecycle
All (29)Filed (3)Permit Issued (1)Special Inspection (25)
08/28/2026
Permit issued — Construction Fence
S01430693-I1-FN
08/10/2026
Filed — Alteration CO
application filed for the addition of a new second story and misc. work throughout building as indicated on plans submitted herewith.
S01377914-I1
08/07/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
08/07/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
08/07/2026
Special inspection requirement — Air barrier - visual inspection
08/07/2026
Special inspection requirement — Permanent certificate
08/07/2026
Special inspection requirement — Interior lighting power
08/07/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
08/07/2026
Special inspection requirement — HVAC-R and service water heating system controls
08/07/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
08/07/2026
Special inspection requirement — Concrete - Cast-In-Place
08/07/2026
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
08/07/2026
Special inspection requirement — Subgrade Inspections
08/07/2026
Special inspection requirement — Energy Code Compliance Inspections
08/07/2026
Special inspection requirement — Fire-Resistance Rated Construction
08/07/2026
Special inspection requirement — Preliminary
08/07/2026
Special inspection requirement — Structural Wood Frame
08/07/2026
Special inspection requirement — Air barrier — testing
08/07/2026
Special inspection requirement — Maintenance information
08/07/2026
Special inspection requirement — Fenestration areas
08/07/2026
Special inspection requirement — Fenestration air leakage
08/07/2026
Special inspection requirement — Insulation placement and R values
08/05/2026
Filed — Alteration
LEGALIZATION AND IMPROVEMENTS ON EXISTING RETAINING WALLS & GRAVITY WALLS AT REAR OF SINGLE-FAMILY DWELLING. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
S01405075-I1
07/28/2026
Filed — Alteration
TEMPORARY CONSTRUCTION FENCE TO BE ERECTED AROUND PERIMETER OF PROPERTY
S01430693-I1
07/27/2026
Special inspection requirement — Wood – Prefabricated I-Joists
07/16/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
05/20/2026
Special inspection requirement — Final
Pericles Stavridis
03/25/2026
Special inspection requirement — Final
03/25/2026
Special inspection requirement — Footing and Foundation
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FencePermit IssuedOUR ISLAND PROPERTY MANAG08/28/2026
1 project · most recent 08/10/2026
Concrete Wood
FiledStatusContractorScope
08/10/2026——Concrete, Wood
1 project · most recent 07/28/2026
Fence
FiledStatusContractorScope
07/28/2026Permit IssuedOUR ISLAND PROPERTY MANAGFence
▾Special Inspection Requirements (DOB NOW) — 25
DateRequirementInspectorRole
08/07/2026HVAC-R and service water piping design and insulation—energy_progress
08/07/2026Fire-Resistant Penetrations and Joints—special
08/07/2026Air barrier - visual inspection—energy_progress
08/07/2026Permanent certificate—energy_progress
08/07/2026Interior lighting power—energy_progress
08/07/2026Fenestration and door U-factor and product ratings—energy_progress
08/07/2026HVAC-R and service water heating system controls—energy_progress
08/07/2026Subsurface Investigations (Borings/Test Pits)—special
08/07/2026Concrete - Cast-In-Place—special
08/07/2026Exterior Insulation and Finish Systems (EIFS)—special
08/07/2026Subgrade Inspections—special
08/07/2026Energy Code Compliance Inspections—progress
08/07/2026Fire-Resistance Rated Construction—progress
08/07/2026Preliminary—progress
08/07/2026Structural Wood Frame—progress
08/07/2026Air barrier — testing —energy_progress
08/07/2026Maintenance information—energy_progress
08/07/2026Fenestration areas—energy_progress
08/07/2026Fenestration air leakage—energy_progress
08/07/2026Insulation placement and R values—energy_progress
07/27/2026Wood – Prefabricated I-Joists—special
07/16/2026Structural Stability – Alterations of existing buildings—special
05/20/2026FinalPericles Stavridisprogress
03/25/2026Final—progress
03/25/2026Footing and Foundation—progress
▾Documents — 27 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/16/2026S01430693-I1Request digital key ↗
08/16/2026S01377914-I1Request digital key ↗
▸Applications & Permits3
▸BISBPP-5 - Authorization to the Department of Transportation2
01/21/2026540269010Open ↗
01/08/2026540269010Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
01/08/2026540269010Open ↗
▸Zoning, Tax Lot & Property Records3
▸DOB NOWZD1: DOB Zoning Diagram1
08/16/2026S01377914-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/16/2026S01377914-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/16/2026S01377914-I1Open ↗
▸Seals & Professional Certifications5
▸DOB NOWDPL-1: Design Professional Seal & Signature3
09/28/2026S01405075-I1Open ↗
08/16/2026S01430693-I1Open ↗
08/16/2026S01377914-I1Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
01/08/2026540269010Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
01/08/2026540269010Open ↗
▸Safety & Tenant Protection1
▸DOB NOWStreet Tree Checklist1
08/16/2026S01377914-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/16/2026S01377914-I1Open ↗
▸Inspections & Test Reports3
▸BISBPP-9 - Request for Builders Pavement Field Inspection1
01/08/2026540269010Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/16/2026S01377914-I1Open ↗
▸DOB NOWSOIL REPORT1
08/16/2026S01377914-I1Open ↗
▸Approvals, Objections & Sign-offs2
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff2
01/21/2026540269010Open ↗
01/08/2026540269010Open ↗
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
01/08/2026540269010Open ↗
▸Other Documents6
▸BISBPP: PHOTOS-SIGNED/SEALED BY APPLICANT1
01/21/2026540269010Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION1
01/21/2026540269010Open ↗
▸DOB NOWPlot Diagram1
08/16/2026S01377914-I1Open ↗
▸DOB NOWProperty Ownership Certification1
08/16/2026S01377914-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/16/2026S01377914-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/16/2026S01377914-I1Open ↗