| Owner | Filings | Most Recent |
|---|---|---|
| 1440 OWNER | 146 | 09/26/2026 |
| DORIA, INC | 5 | 03/22/2026 |
| J K CONSTRUCTION NY | 5 | 03/22/2026 |
| LEFKAS REALTY | 33 | 03/22/2026 |
| ARTIMUS | 1 | 03/22/2026 |
| S S 310 | 1 | 03/22/2026 |
| SMART LAUNDRY SYSTEM | 7 | 03/21/2026 |
| COLGATE ENTERPRISES | 3 | 03/21/2026 |
| ASSOCIATED SUPERMARKET | 2 | 03/21/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| APPLIED HVAC ENGINEERING, PLLC | 5 | 08/24/2026 |
| INSIGHT STUDIO ARCHITECTURE PC | 2 | 08/21/2026 |
| THE GLUCK ARCHITECTURAL COLLABORATI | 12 | 05/06/2026 |
| VENTROP ENGINEERING CONSULTING GROU | 18 | 01/13/2026 |
| MURDOCH ENGINEERING | 5 | 01/08/2026 |
| ZENITH HOME INSPECTIONS | 2 | 12/01/2025 |
| BARRY GURVITCH | 3 | 05/14/2025 |
| SKYLINE RIGGING | 1 | 12/20/2024 |
| AP PROFESSIONAL ENGINEERING PLLC | 5 | 10/10/2024 |
| ENGINEERING GROUP ASSOCIATES, PC | 8 | 05/03/2024 |
| PAUL PERDEK, PROF. ENG. PLLC | 1 | 05/02/2024 |
| HM LOKE CONSULTING ENGINEERING PC | 1 | 03/04/2024 |
| PATUXENT ENGINEERING LLC | 2 | 12/29/2023 |
| PHILIP HABIB & ASSOCIATES | 1 | 12/11/2023 |
| VALJATO ENGINEERING PC | 3 | 08/23/2023 |
| GEA CONSULTING ENGINEERS | 1 | 03/22/2022 |
| Representative | Filings | Most Recent |
|---|---|---|
| EAST COAST EXPEDITING | 47 | 03/21/2026 |
| ALL IN PERMIT CONSULTANTS | 5 | 03/21/2026 |
| PATUXENT ENGINEERING | 4 | 03/21/2026 |
| LOUIS STRIAR | 4 | 03/21/2026 |
| SANDEEP KAUR | 5 | 03/21/2026 |
| AE DESIGN SOLUTION | 2 | 03/21/2026 |
| HM LOKE CONSULTING ENGINEERING PC | 1 | 03/21/2026 |
| VALJATO ENGINEERING P C | 6 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| ARTIMUS LLC | General Contractor | 34 | 08/16/2026 |
| FIVE BOROUGH NYC LLC | Fire Protection | 6 | 07/08/2026 |
| P GOOM HOISTS SERVICES IN | General Contractor | 6 | 07/08/2026 |
| BAYPORT CONSTRUCTION CORP. | General Contractor | 6 | 03/21/2026 |
| NEPTUNE SIGNS AWNINGS | Scaffold | 5 | 07/08/2026 |
| HAAS INCORPORATED | General Contractor | 5 | 08/18/2026 |
| FORWARD MECHANICAL CORP | Plumbing | 4 | 07/08/2026 |
| CORJI CONTRACTING LLC | General Contractor | 4 | 09/26/2026 |
| J.K.CONSTRUCTION NEW YORK | General Contractor | 4 | 03/21/2026 |
| JESUS CORPORAN | Electrical | 3 | 03/21/2026 |
| ZONE PLUMBING & HEATING C | Plumbing | 2 | 07/08/2026 |
| ALBA SERVICES INC | General Contractor | 2 | 07/08/2026 |
| L S SIGN | Scaffold | 2 | 07/08/2026 |
| PARSONS CONSTRUCTION INC | General Contractor | 1 | 07/08/2026 |
| AURORA ELECL CONTG INC | Electrical | 1 | 03/22/2026 |
| ANTHONY G FERRY INC | Electrical | 1 | 03/22/2026 |
| DIMITRIADIS PETROS | Electrical | 1 | 03/21/2026 |
| VILLAGE P & H NY INC | Fire Protection | 1 | 07/08/2026 |
| DENALI ELECTRIC CORP | Electrical | 1 | 03/22/2026 |
| CONROY BLAKE | Electrical | 1 | 03/21/2026 |
| DEFALCO CONSTRUCTION INC | General Contractor | 1 | 07/08/2026 |
| PETROS DIMITRIADIS | Electrical | 1 | 03/21/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| PHILIBERT ENGINEERING, PC | 223 | 7 | 08/24/2026 |
| GILSANZ MURRAY STEFICEK | 240 | 6 | 05/06/2026 |
| MT GROUP | 798 | 13 | 05/06/2026 |
| AMARACON TESTING & INSPEC | 5842 | 10 | 01/13/2026 |
| SKYLINE RIGGING | 7880 | 1 | 12/20/2024 |
| ENGINEERING GROUP ASSOCIA | 526 | 5 | 05/03/2024 |
| GEODESIGN, INC., P.C. | 627 | 3 | 12/11/2023 |
| TWIN PEAKS INC. | 317 | 3 | 09/05/2023 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | General Construction | Permit Issued | CORJI CONTRACTING LLC | 09/25/2026 |
| DOB NOW | Mechanical Systems | Signed-off | HAAS INCORPORATED | 08/17/2026 |
| DOB NOW | General Construction | Permit Issued | ARTIMUS LLC | 08/14/2026 |
| DOB NOW | Boiler Equipment | Permit Issued | ZONE PLUMBING & HEATING C | 04/13/2026 |
| DOB NOW | Mechanical Systems | Signed-off | HAAS INCORPORATED | 02/18/2026 |
| DOB NOW | Sign | Signed-off | DESTHERS, JOSEPH | 02/12/2026 |
| DOB NOW | Sprinklers | Permit Issued | VILLAGE P & H NY INC | 02/11/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | CORJI CONTRACTING | 02/09/2026 |
| DOB NOW | Sign | Signed-off | DESTHERS, JOSEPH | 01/22/2026 |
| DOB NOW | Sign | Signed-off | DESTHERS, JOSEPH | 01/22/2026 |
| DOB NOW | Sign | Signed-off | DESTHERS, JOSEPH | 01/22/2026 |
| DOB NOW | Sign | Signed-off | DESTHERS, JOSEPH | 01/22/2026 |
| DOB NOW | Plumbing | Permit Issued | ZONE PLUMBING & HEATING C | 01/12/2026 |
| DOB NOW | Sign | Signed-off | WEINFELD, ELLIOT | 12/02/2025 |
| DOB NOW | Sign | Signed-off | WEINFELD, ELLIOT | 12/02/2025 |
| DOB NOW | General Construction | Permit Issued | CORJI CONTRACTING | 10/15/2025 |
| DOB NOW | Mechanical Systems | Signed-off | HAAS INCORPORATED | 09/09/2025 |
| DOB NOW | General Construction | Permit Issued | ARTIMUS LLC | 08/14/2025 |
| DOB NOW | General Construction | Permit Issued | ARTIMUS LLC | 06/17/2025 |
| DOB NOW | General Construction | Signed-off | ARTIMUS LLC | 05/16/2025 |
| DOB NOW | Protection and Mechanical Methods | Signed-off | ARTIMUS LLC | 04/18/2025 |
| DOB NOW | Plumbing | Signed-off | FORWARD HEATING CORP | 03/07/2025 |
| DOB NOW | Construction Fence | Signed-off | ARTIMUS LLC | 02/28/2025 |
| DOB NOW | General Construction | Permit Issued | ARTIMUS LLC | 01/29/2025 |
| DOB NOW | Sprinklers | Signed-off | FIVE BOROUGH NYC LLC | 01/28/2025 |
| DOB NOW | Standpipe | Signed-off | FIVE BOROUGH NYC LLC | 01/28/2025 |
| DOB NOW | Standpipe | Signed-off | FIVE BOROUGH NYC LLC | 01/28/2025 |
| DOB NOW | Sidewalk Shed | Signed-off | J.K.CONSTRUCTION NEW YORK | 01/21/2025 |
| DOB NOW | Protection and Mechanical Methods | Signed-off | P GOOM HOISTS SERVICES IN | 12/26/2024 |
| DOB NOW | Protection and Mechanical Methods | Signed-off | P GOOM HOISTS SERVICES IN | 12/26/2024 |
| DOB NOW | Suspended Scaffold | Signed-off | DORIA, INC | 12/20/2024 |
| DOB NOW | Plumbing | Signed-off | FORWARD HEATING CORP | 12/09/2024 |
| DOB NOW | Structural | Signed-off | ARTIMUS LLC | 11/27/2024 |
| DOB NOW | Mechanical Systems | Signed-off | HAAS INCORPORATED | 11/01/2024 |
| DOB NOW | Supported Scaffold | Signed-off | BAYPORT CONSTRUCTION CORP | 10/07/2024 |
| DOB NOW | Protection and Mechanical Methods | Signed-off | J.K.CONSTRUCTION NEW YORK | 08/12/2024 |
| DOB NOW | Supported Scaffold | Signed-off | BAYPORT CONSTRUCTION CORP | 07/26/2024 |
| DOB NOW | Mechanical Systems | Signed-off | HAAS INCORPORATED | 06/14/2024 |
| DOB NOW | Supported Scaffold | Signed-off | BAYPORT CONSTRUCTION CORP | 05/02/2024 |
| DOB NOW | Protection and Mechanical Methods | Signed-off | ARTIMUS LLC | 04/22/2024 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 08/24/2026 | Permit Issued | CORJI CONTRACTING LLC | Air Conditioning Systems, Heating and Air Conditioning Systems, Heating Systems, Ventilation Systems | Cooling Skypeak Skypeak Model SKY-SESH120 6,400 CFM · Split System ×2 Skypeak Moodel SKY-SESHI120 4,000 CFM · Split System ×2 Heat / Cool Lg LG Model #ZRNU123SJSA 12,300 BTU · Vrf Indoor ×2 LG Model #ZRNU243NAA 24,000 BTU · Vrf Indoor ×2 LG KNSAL151A 15,000 BTU · Vrf Indoor ×1 LG Model # KUSAL151A 15,000 BTU · Vrf Indoor ×1 LG Model #ZRUMO486SSO 48,000 BTU · Vrf Indoor ×1 LG ZRUN024GSSO 24,000 BTU · Vrf Outdoor ×1 Heating Stelpro Stelpro ASHU1583CTCHAR 20 kW · Electric Heater ×2 Ventilation Captiveaire Captiveaire Model #A1-D.250-16Z 1,000 CFM · Makeup Air ×1 Captiveaire SIF13DD-HE 1,200 CFM · Exhaust Fan ×1 Captiveaire SIF20DD 2,250 CFM · Exhaust Fan ×1 Captiveaire SIF24DD 3,250 CFM · Exhaust Fan ×1 — A2-D.250-20D 2,000 CFM · Makeup Air ×1 |
| 05/06/2026 | Signed-off | HAAS INCORPORATED | Air Conditioning Systems, Associated Ducts and Piping, Generators, Heating and Air Conditioning Systems | Cooling Heat / Cool Daikin REYQ168TATJA 168,000 BTU · Vrf Outdoor ×9 RXYQ168TATJA 164,000 BTU · Vrf Outdoor ×6 FXEQ07PVJU 212 CFM · Vrf Indoor ×3 FXEQ12PVJU 283 CFM · Vrf Indoor ×3 FXFQ12TVJU 441 CFM · Vrf Indoor ×3 FXSQ18TAVJU 600 CFM · Vrf Indoor ×3 FXSQ24TAVJU 742 CFM · Vrf Indoor ×3 FXSQ30TAVJU 812 CFM · Vrf Indoor ×3 FXSQ36TAVJU 1,130 CFM · Vrf Indoor ×3 FXSQ48TAVJU 1,307 CFM · Vrf Indoor ×3 FXTQ36TAVJUA 1,050 CFM · Vrf Indoor ×3 FXTQ48TAVJUA 1,520 CFM · Vrf Indoor ×3 Ice Air RSXC 480 CFM · Ptac ×9 Aaon RN-016-8-0-HB09-34B:FEDF-Z0B-DQG-HGA-EDKB5LE-00-00A0000VB 6,075 CFM · Rooftop Unit ×6 Oxygen8 C48IN-BP 4,925 CFM · Vrf Outdoor ×3 Heating Ouellet OACPU3000 160 CFM · Electric Heater ×3 OACU020008-T 160 CFM · Electric Heater ×3 OAEU3000AM-EO-TB6 1 BTU · Electric Heater ×3 OAEU5000AM-EO-TB-6 1 BTU · Electric Heater ×3 ODSRU03008 310 CFM · Electric Heater ×3 OPX2A2508 160 CFM · Electric Heater ×3 Ventilation Greenheck SQ-60-VG 50 CFM · Exhaust Fan ×69 SQ-70-VG 60 CFM · Exhaust Fan ×69 SP-B150 100 CFM · Exhaust Fan ×9 AX-72-190-0424-A50 8,500 CFM · Exhaust Fan ×6 AX-31-160-0613-M5 800 CFM · Exhaust Fan ×3 AX-54-190-0414-M50 6,800 CFM ×3 SP-B110 50 CFM · Exhaust Fan ×3 USF-08 350 CFM · Exhaust Fan ×3 Generators Generac SG250 250 kW · Generator ×3 Ducts & Piping N/A N/A 1 CFM · Ductwork ×1 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 05/06/2026 | Signed-off | FIVE BOROUGH NYC LLC | Sprinkler System |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/24/2026 | Permit Issued | ZONE PLUMBING & HEATING C | Gas, Water/Sanitary |
| 05/06/2026 | Signed-off | FORWARD MECHANICAL CORP | Gas, Storm, Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 03/15/2026 | Permit Issued | DVM ELECTRICAL SERVICES L | General Wiring |
| 01/29/2026 | Permit Issued | PROFF ELECTRICAL LLC | — |
| 12/30/2025 | Complete | AURORA ELECL CONTG INC | — |
| 12/30/2025 | Complete | AURORA ELECL CONTG INC | — |
| 12/15/2025 | Permit Issued | L J ELEC'L SERV. INC. | General Wiring |
| 12/02/2025 | Complete | ANTHONY G FERRY INC | General Wiring |
| 11/12/2025 | Complete | DENALI ELECTRIC CORP | — |
| 11/12/2025 | Complete | DENALI ELECTRIC CORP | — |
| 11/12/2025 | Complete | DENALI ELECTRIC CORP | — |
| 08/20/2025 | Complete | ANTHONY G FERRY INC | General Wiring |
| 08/20/2025 | Complete | ANTHONY G FERRY INC | General Wiring |
| 07/14/2025 | Complete | ANTHONY G FERRY INC | General Wiring |
| 05/31/2024 | Complete | STAR ELEC'L CONTRACTORS C | — |
| 05/23/2024 | Complete | STAR ELEC'L CONTRACTORS C | — |
| 05/03/2024 | Complete | STAR ELEC'L CONTRACTORS C | — |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 05/06/2026 | Signed-off | HAAS INCORPORATED | Concrete |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/24/2026 | Permit Issued | CORJI CONTRACTING LLC | Tenant Protection Plan 72 Hour |
| Date | Type | Result | Report |
|---|---|---|---|
| 09/09/2026 | Fail-Final Sign Permit Inspection | Fail | View ↗ |
| 05/27/2026 | Pass-Final General Construction Non-Directive 14 | Pass | View ↗ |
| 04/10/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 04/06/2026 | Fail-Final General Construction Non-Directive 14 | Fail | View ↗ |
| 03/31/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 03/10/2026 | No Access-Final General Construction Non-Directive 14 | No Access | View ↗ |
| 09/03/2025 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 07/28/2025 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 07/01/2025 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 06/25/2025 | Fail-Final CND-Occupancy Inspection | Fail | View ↗ |
| 06/25/2025 | Pass-Final General Construction Non-Directive 14 | Pass | View ↗ |
| 04/10/2025 | Pass-Final SD - Fire Pump | Pass | View ↗ |
| 04/07/2025 | Certified StandPipe-SD-Piping-Hydrostatic Test | Certified | View ↗ |
| 02/06/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 01/17/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 01/15/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 11/12/2024 | Pass-Final PL - More than 10 Requested Floors | Pass | View ↗ |
| 10/03/2024 | Pass-Final PL - Up to 9 Requested Floors | Pass | View ↗ |
| 09/06/2024 | Pass-Final PL - Up to 9 Requested Floors | Pass | View ↗ |
| 08/29/2024 | Fail-Final PL - Up to 9 Requested Floors | Fail | View ↗ |
| 08/29/2024 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 07/24/2024 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 07/05/2024 | Certified StandPipe - SD - Alarm Sys 64/09 - Finish | Certified | View ↗ |
| 07/05/2024 | Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet) | Certified | View ↗ |
| 04/17/2024 | Certified StandPipe - SD - Alarm Sys 64/09 - Finish | Certified | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 08/20/2026 | Tenant Protection Plan Compliance | — | special |
| 08/19/2026 | Post-installed Anchors | Jacky Philibert | special |
| 08/19/2026 | Fire-Resistant Penetrations and Joints | Jacky Philibert | special |
| 06/08/2026 | Fenestration air leakage | Matthew Wavro | energy_progress |
| 06/08/2026 | Protection of exposed foundation insulation | Matthew Wavro | energy_progress |
| 06/08/2026 | Fenestration areas | Matthew Wavro | energy_progress |
| 06/08/2026 | Air barrier - visual inspection | Matthew Wavro | energy_progress |
| 06/08/2026 | Fenestration and door U-factor and product ratings | Matthew Wavro | energy_progress |
| 06/08/2026 | Vestibules | Matthew Wavro | energy_progress |
| 06/08/2026 | Fire-Resistance Rated Construction | CHRISTOPHER BEHLE | progress |
| 06/08/2026 | Energy Code Compliance Inspections | Ari Kamo | progress |
| 06/08/2026 | Fire-Resistant Penetrations and Joints | CHRISTOPHER BEHLE | special |
| 06/08/2026 | Subsurface Investigations (Borings/Test Pits) | THOMAS THOMANN | special |
| 06/08/2026 | Air barrier continuity plan testing | Matthew Wavro | energy_progress |
| 06/08/2026 | Insulation placement and R values | Ari Kamo | energy_progress |
| 06/08/2026 | Wall Panels, Curtain Walls, and Veneers | ACHIM HERMES | special |
| 05/15/2026 | Tenant Protection Plan Compliance | — | special |
| 05/12/2026 | Fire-Resistant Penetrations and Joints | Jacky Philibert | special |
| 05/12/2026 | Energy Code Compliance Inspections | Jacky Philibert | progress |
| 05/12/2026 | Fire-Resistance Rated Construction | Jacky Philibert | progress |
| 05/12/2026 | Interior lighting power | Jacky Philibert | energy_progress |
| 05/12/2026 | Vestibules | Jacky Philibert | energy_progress |
| 05/12/2026 | Lighting controls | Jacky Philibert | energy_progress |
| 04/27/2026 | Vestibules | Matthew Wavro | energy_progress |
| 04/27/2026 | Fenestration air leakage | Matthew Wavro | energy_progress |