💬 Discuss this project
1985Year Built
24Stories
R4Building Class
C1-9Zoning
70,723 sfGross Floor Area
60Units
LL97 CoveredRent Stabilized1 Active Violation ▸FISP: SAFE
Condo, residential unit in elevator building · Owner of record: Le Trianon Condominium Associates · 7,676 sf lot · 9.21 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Whole building & multi-floor projectsBoiler room and chimney work2 filings
RoofLe Trainon Condominium2p · 4 filings · 15 docs
Floor 23Demolition and altered floors1 filing · 6 docs
Floor 22
Floor 21
Floor 20
Floor 19
Floor 18
Floor 17
Floor 16
Floor 15Unit 15A1 filing · 12 docs
Floor 14
Floor 13
Floor 12
Floor 11
Floor 10
Floor 9
Floor 8
Floor 7Unit 7C2 filings · 12 docs
Floor 6
Floor 5
Floor 4
Floor 3
Floor 2
Floor 1
CellarResidential building plumbing and sprinkler system installat5p · 3 filings · 15 docs
Site & exteriorLe Trainon Condominium2 filings · 17 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Le Triaron Condominium2303/21/2026
Le TRIANON%VINTAGE R E Services303/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Socotec603/21/2026
Kataria Builders603/21/2026
New York & Company103/21/2026
Enkay Design Consulting803/21/2026
Spring Scaffolding803/21/2026
Rand Engineering & Arch403/21/2026
Tribeca Construction Consulting403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Spring ScaffoldingScaffold2407/08/2026
Hockmann Hill GroupGeneral Contractor403/21/2026
Ariston ChimneyGeneral Contractor303/21/2026
Duce ConstructionGeneral Contractor207/08/2026
Central Construction ManagementGeneral Contractor203/21/2026
Yates Restoration GroupGeneral Contractor207/08/2026
L.L.G. Plumbing & HeatingPlumbing207/08/2026
T.N.T. Plumbing & HeatingPlumbing107/08/2026
S. Romano ElectricElectrical103/21/2026
S. Romano ElectricElectrical103/22/2026
Steel Tone ConstructionGeneral Contractor107/08/2026
Capitol Fire Sprinkler CoFire Protection107/08/2026
Metrotech MechanicalPlumbing107/08/2026
J.H. Electric of New YorkElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Rand Engineering & Architects266404/01/2024
BSA4489301/22/2024
Space Architecture8347401/22/2024
New York Engineering Associates851110/25/2023
Ambrosino Architects6357409/14/2023
Building Lifecycle
All (203)Filed (19)Permit Issued (26)Signed Off (13)Facade (FISP) (13)Violation (60)Inspection (10)Objection (32)Special Inspection (30)
07/29/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/25/2025
Signed off — Alteration
Filing herewith for plumbing modifications . There is no change to use , egress of occupancy.
M01098045-S1
07/22/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/11/2025
Signed off — Alteration
Filing herewith for plumbing modifications . There is no change to use , egress of occupancy.
M01098045-I1
05/27/2025
Filed — Alteration
Filing herewith for plumbing modifications . There is no change to use , egress of occupancy.
M01098045-P1
12/10/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/22/2024
Violation issued (HPD, closed)
I
10/17/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/07/2024
Signed off — Alteration
8th Cycle Facade Repair. No change in Use, Egress or Occupancy.
M00459709-I1
10/07/2024
Special inspection requirement — Masonry
John Monroe
10/07/2024
Special inspection requirement — Air barrier - visual inspection
John Monroe
10/07/2024
Special inspection requirement — Insulation placement and R values
John Monroe
10/07/2024
Special inspection requirement — Final
John Monroe
10/07/2024
Special inspection requirement — Energy Code Compliance Inspections
John Monroe
10/07/2024
Special inspection requirement — Post-installed Anchors
John Monroe
10/07/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
John Monroe
09/30/2024
Objection raised — Other
09/30/2024
Objection resolved — Addressed
09/26/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
09/20/2024
Objection resolved — Addressed
09/16/2024
Permit issued — General Construction
M01098045-I1-GC
09/10/2024
Permit issued — Plumbing
M01098045-S1-PL
08/29/2024
Filed — Alteration
Filing herewith for plumbing modifications . There is no change to use , egress of occupancy.
M01098045-S1
08/29/2024
Filed — Alteration
Filing herewith for plumbing modifications . There is no change to use , egress of occupancy.
M01098045-I1
08/28/2024
Special inspection requirement — Lighting controls
Jieun Yang
08/28/2024
Special inspection requirement — Lighting in dwelling units
Jieun Yang
08/19/2024
Special inspection requirement — Final
Jieun Yang
04/15/2024
Objection raised — Scope
04/01/2024
Filed — Alteration
8th Cycle Facade Repair. No change in Use, Egress or Occupancy.
M00459709-P1
03/08/2024
Signed off — Alteration
INSTALL METAL CHIMNEY LINER PER PLANS.
M00946749-I1
01/24/2024
Signed off — Alteration
FILING HEREWITH PLANS AND APPLICATION FOR A PLUMBING APPLICATION TO INSTALL COMPLETE PLUMBING SYSTEM INCLUDING FIXTURES HOT AND COLD WATER, SANITARY IN ACC WITH THE NYC CODE. SPRINKLER APP TO BE FILED FOR NEW HEADS AND PIPING TO REPLACE EXISTING IN CEL.
M00691482-I1
01/22/2024
Filed — Alteration
FILING HEREWITH PLANS AND APPLICATION FOR A PLUMBING APPLICATION TO INSTALL COMPLETE PLUMBING SYSTEM INCLUDING FIXTURES HOT AND COLD WATER, SANITARY IN ACC WITH THE NYC CODE. SPRINKLER APP TO BE FILED FOR NEW HEADS AND PIPING TO REPLACE EXISTING IN CEL.
M00691482-P1
01/12/2024
Signed off — Alteration
FILING HEREWITH PLANS AND APPLICATION TO REMOVE EXISTING AIR DISTRIBUTION DUCTWORK AND RELATED COMPONENTS AND INSTALL NEW DUCTWORK DISTRIBUTION AND CONNECT TO EXISTING AC. ALSO, REMOVE THE EXISTING 10 TON PACKAGE AC UNIT AND INSTALL A NEW10 TON PACKAGE UN
M00692081-I1
01/12/2024
Special inspection requirement — Energy Code Compliance Inspections
HAMID BEN SHARIFIAZAD
01/12/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Scott Stapleton
01/12/2024
Special inspection requirement — Sprinkler Systems
HAMID BEN SHARIFIAZAD
01/02/2024
Signed off — Alteration
M00447496-I1
12/14/2023
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
12/11/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
11/01/2023
Permit issued — General Construction
M00946749-I1-GC
10/30/2023
Special inspection requirement — Post-installed Anchors
John Monroe
10/27/2023
Special inspection requirement — Final
Scott Stapleton
10/27/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Scott Stapleton
10/27/2023
Special inspection requirement — Interior lighting power
Scott Stapleton
10/27/2023
Special inspection requirement — Lighting controls
Scott Stapleton
10/27/2023
Special inspection requirement — Fire-Resistance Rated Construction
Scott Stapleton
10/26/2023
Filed — Alteration
M00447496-P1
10/26/2023
Special inspection requirement — Interior lighting power
Scott Stapleton
10/26/2023
Special inspection requirement — Lighting controls
Scott Stapleton
10/26/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Scott Stapleton
10/26/2023
Special inspection requirement — Final
Scott Stapleton
10/26/2023
Special inspection requirement — Fire-Resistance Rated Construction
Scott Stapleton
10/25/2023
Filed — Alteration
INSTALL METAL CHIMNEY LINER PER PLANS.
M00946749-I1
10/23/2023
Special inspection requirement — Insulation placement and R values
John Monroe
10/23/2023
Special inspection requirement — Masonry
John Monroe
10/23/2023
Special inspection requirement — Air barrier - visual inspection
John Monroe
10/23/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
John Monroe
10/23/2023
Special inspection requirement — Energy Code Compliance Inspections
John Monroe
10/23/2023
Special inspection requirement — Final
John Monroe
10/09/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
Latest 60 of 203 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offSteel Tone Construction09/16/2024
DOB NOWPlumbingSigned-offT.N.T. Plumbing & Heating09/10/2024
DOB NOWGeneral ConstructionSigned-offAriston Chimney11/01/2023
DOB NOWMechanical SystemsSigned-offDuce Construction04/25/2023
DOB NOWPlumbingSigned-offMetrotech Mechanical04/24/2023
DOB NOWSprinklersSigned-offCapitol Fire Sprinkler Co04/24/2023
DOB NOWGeneral ConstructionSigned-offDuce Construction03/21/2023
DOB NOWGeneral ConstructionSigned-offCentral Construction Management02/14/2023
DOB NOWPlumbingSigned-offL.L.G. Plumbing & Heating10/26/2022
DOB NOWSidewalk ShedSigned-offSpring Scaffolding02/25/2022
DOB NOWProtection and Mechanical MethodsSigned-offSpring Scaffolding02/25/2022
DOB NOWSupported ScaffoldSigned-offSpring Scaffolding02/25/2022
DOB NOWProtection and Mechanical MethodsSigned-offSpring Scaffolding02/25/2022
DOB NOWGeneral ConstructionSigned-offYates Restoration Group02/22/2022
DOB NOWGeneral ConstructionSigned-offHockmann Hill Group07/07/2021
DOB NOWGeneral ConstructionSigned-offYates Restoration Group06/18/2021
DOB NOWPlumbingSigned-offL.L.G. Plumbing & Heating04/01/2021
DOB NOWGeneral ConstructionSigned-offHockmann Hill Group03/26/2021
DOB NOWProtection and Mechanical MethodsSigned-offSpring Scaffolding03/16/2021
DOB NOWProtection and Mechanical MethodsSigned-offSpring Scaffolding03/05/2021
DOB NOWSidewalk ShedSigned-offSpring Scaffolding03/03/2021
DOB NOWSupported ScaffoldSigned-offSpring Scaffolding03/03/2021
DOB NOWProtection and Mechanical MethodsSigned-offSpring Scaffolding02/18/2021
DOB NOWProtection and Mechanical MethodsSigned-offSpring Scaffolding02/18/2021
DOB NOWSupported ScaffoldSigned-offSpring Scaffolding02/10/2021
DOB NOWSidewalk ShedSigned-offSpring Scaffolding02/04/2021
BISPLISSUEDAmm General Contracting09/28/2022
BISPLISSUEDM Burton P & H09/27/2021
BISPLISSUEDAmm General Contracting03/16/2021
BISPLISSUEDUnipipe Plumbing & Heating11/13/2020
BISMHISSUEDBlock Studio03/19/2020
BISOTISSUEDBlock Studio03/19/2020
BISOTISSUEDBlock Studio03/19/2020
BISPLISSUEDAmm General Contracting03/12/2020
BISPLISSUEDUnipipe Plumbing & Heating11/12/2019
BISPLISSUEDBT's Plumbing and Heating05/14/2019
BISMHISSUEDBlock Studio03/21/2019
BISOTISSUEDBlock Studio03/18/2019
BISOTISSUEDBlock Studio03/18/2019
BISOTISSUEDBlock Studio03/18/2019
+ 36 more permits on file
1 project · most recent 11/09/2020
Gas Water/Sanitary
FiledStatusContractorScope
11/09/2020——Gas, Water/Sanitary
9 projects · most recent 09/10/2026
General Wiring
FiledStatusContractorScope
09/10/2026Permit IssuedMax Electric CoGeneral Wiring
10/01/2024CompleteS. Romano ElectricGeneral Wiring
12/16/2023CompleteVillage Electl ContractorsGeneral Wiring
07/13/2023Permit IssuedLens ElectricGeneral Wiring
06/20/2022CompleteAccurate ElectricalGeneral Wiring
02/11/2021CompleteTop Shelf Electric—
11/30/2018CompleteHeso ElectricalGeneral Wiring
10/02/2018CompleteJ.H. Electric of New YorkGeneral Wiring
07/20/2018Permit IssuedJ.H. Electric of New YorkGeneral Wiring
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
07/29/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/22/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/10/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/17/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/26/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
12/14/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
12/11/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
10/09/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/21/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/22/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 35
DateRequirementInspectorRole
10/07/2024MasonryJohn Monroespecial
10/07/2024Air barrier - visual inspectionJohn Monroeenergy_progress
10/07/2024Insulation placement and R valuesJohn Monroeenergy_progress
10/07/2024FinalJohn Monroeprogress
10/07/2024Energy Code Compliance InspectionsJohn Monroeprogress
10/07/2024Post-installed AnchorsJohn Monroespecial
10/07/2024Structural Stability – Alterations of existing buildingsJohn Monroespecial
08/28/2024Lighting controlsJieun Yangenergy_progress
08/28/2024Lighting in dwelling unitsJieun Yangenergy_progress
08/19/2024FinalJieun Yangprogress
01/12/2024Energy Code Compliance InspectionsHAMID BEN SHARIFIAZADprogress
01/12/2024Fire-Resistant Penetrations and JointsScott Stapletonspecial
01/12/2024Sprinkler SystemsHAMID BEN SHARIFIAZADspecial
10/30/2023Post-installed AnchorsJohn Monroespecial
10/27/2023FinalScott Stapletonprogress
10/27/2023Fire-Resistant Penetrations and JointsScott Stapletonspecial
10/27/2023Interior lighting powerScott Stapletonenergy_progress
10/27/2023Lighting controlsScott Stapletonenergy_progress
10/27/2023Fire-Resistance Rated ConstructionScott Stapletonprogress
10/26/2023Interior lighting powerScott Stapletonenergy_progress
10/26/2023Lighting controlsScott Stapletonenergy_progress
10/26/2023Fire-Resistant Penetrations and JointsScott Stapletonspecial
10/26/2023FinalScott Stapletonprogress
10/26/2023Fire-Resistance Rated ConstructionScott Stapletonprogress
10/23/2023Insulation placement and R valuesJohn Monroeenergy_progress
Latest 25 of 35.
▾Documents — 462 on file (BIS + DOB NOW)
▸Plans & Drawings19
▸DOB NOWPlans/Sketch7
09/02/2026M00692081-I1Request digital key ↗
08/28/2026M00946749-I1Request digital key ↗
08/28/2026M00691482-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸DOB NOWPlans/Sketch - General Construction5
09/02/2026M00447496-I1Request digital key ↗
09/02/2026M00447496-P1Request digital key ↗
08/15/2026M00458716-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Plumbing3
08/29/2026M00458724-I1Request digital key ↗
08/29/2026M00458724-P2Request digital key ↗
08/15/2026M00404904-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Protection of Mechanical Methods2
09/04/2026M00471610-I1Request digital key ↗
09/04/2026M00471683-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/04/2026M00463256-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Supported Scaffold1
09/04/2026M00463239-I1Request digital key ↗
▸Applications & Permits98
▸BISPLAN / WORK APPROVAL APPLICATION57
04/18/2023123459569Open ↗
10/28/2022123459569Open ↗
09/21/2022122249174Open ↗
Showing 3 of 57 on file for this type
▸BISWORK PERMIT APPLICATION38
09/27/2021104369014Open ↗
03/20/2020123541569Open ↗
03/20/2020123541569Open ↗
Showing 3 of 38 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISPARTIAL DEMO PLAN & DS1 (FOR AL/EW-OT PERMITS)1
03/22/2021140952100Open ↗
▸BISPARTIAL DEMO: 10-DAY NOTICE (FOR AL/EW-OT PERMITS)1
03/22/2021140952100Open ↗
▸Zoning, Tax Lot & Property Records2
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Seals & Professional Certifications101
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION34
10/15/2019123420253Open ↗
06/07/2019123541569Open ↗
06/07/2019123541569Open ↗
Showing 3 of 34 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature19
09/04/2026M00463239-I1Open ↗
09/04/2026M00463256-I1Open ↗
09/04/2026M00471683-I1Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWProgress Inspector Seal & Signature18
09/01/2026M01098045-I1Open ↗
09/01/2026M01098045-I1Open ↗
09/01/2026M01098045-I1Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature10
08/29/2026M00691482-P1Open ↗
08/29/2026M00691482-P1Open ↗
08/28/2026M00404904-I1Open ↗
Showing 3 of 10 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT7
08/14/2018123560654Open ↗
07/25/2018123459569Open ↗
05/25/2018123420253Open ↗
Showing 3 of 7 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST7
06/27/2019122694101Open ↗
08/14/2018123560654Open ↗
07/25/2018123459569Open ↗
Showing 3 of 7 on file for this type
▸BISAPPLICANT OWNER SIGNATURE2
09/17/2020140952100Open ↗
Showing 1 of 2 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
09/17/2020140952100Open ↗
Showing 1 of 2 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment42
▸BISSCHEDULE B - PLUMBING18
10/28/2022123459569Open ↗
02/16/2022123459569Open ↗
02/05/2021123541569Open ↗
Showing 3 of 18 on file for this type
▸BISSELF-CERT PLUMBING NOTICE9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE9
10/08/2019123541569Open ↗
07/29/2019123459569Open ↗
04/09/2019123541569Open ↗
Showing 3 of 9 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT3
11/13/2020122694101Open ↗
11/06/2020122694101Open ↗
Showing 2 of 3 on file for this type
▸BISEQUIPMENT USE PERMITS3
11/13/2020122694101Open ↗
Showing 1 of 3 on file for this type
▸Safety & Tenant Protection7
▸BISTenant Protection Plan and Notes4
09/18/2018123541569Open ↗
07/25/2018123459569Open ↗
03/10/2017122694101Open ↗
Showing 3 of 4 on file for this type
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM2
10/19/2018123541569Open ↗
Showing 1 of 2 on file for this type
▸DOB NOWTenant Protection Plan1
08/13/2026M00404904-I1Open ↗
▸Environmental & Asbestos34
▸DOB NOWDEP ACP-5: Asbestos Assessment Report15
09/02/2026M00447496-P1Open ↗
09/02/2026M00447496-I1Open ↗
09/02/2026M00692081-I1Open ↗
Showing 3 of 15 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)12
09/17/2020140952100Open ↗
09/18/2018123541569Open ↗
08/14/2018123560654Open ↗
Showing 3 of 12 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
03/10/2017122694101Open ↗
▸Energy Compliance42
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS17
10/15/2019123420253Open ↗
09/18/2018123541569Open ↗
09/11/2018123459569Open ↗
Showing 3 of 17 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY8
03/22/2021140952100Open ↗
02/19/2021123541569Open ↗
02/19/2021123541569Open ↗
Showing 3 of 8 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS7
02/19/2021123541569Open ↗
11/06/2020122694101Open ↗
10/15/2019123420253Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.5
08/15/2026M00459709-I1Open ↗
08/13/2026M00458724-I1Open ↗
08/13/2026M00458716-I1Open ↗
Showing 3 of 5 on file for this type
▸BISTR8: Energy Code Progress Inspections3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
09/17/2020140952100Open ↗
Showing 1 of 2 on file for this type
▸Inspections & Test Reports13
▸BISTECHNICAL REPORT: RESPONSIBILITY13
11/22/2021104369014Open ↗
11/22/2021104369014Open ↗
11/18/2021104369014Open ↗
Showing 3 of 13 on file for this type
▸Approvals, Objections & Sign-offs22
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST10
11/22/2021104369014Open ↗
02/19/2021123541569Open ↗
11/06/2020122694101Open ↗
Showing 3 of 10 on file for this type
▸BISADMINISTRATIVE OBJECTIONS5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter3
09/04/2026M00463239-I1Open ↗
09/04/2026M00471683-I1Open ↗
08/13/2026M00471610-I1Open ↗
▸BISSUPERSEDING LETTER2
03/18/2019123541569Open ↗
04/03/2018122694101Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION2
05/18/2017140429775Open ↗
Showing 1 of 2 on file for this type
▸Cost, Insurance & Ownership31
▸BISCOST AFFIDAVIT28
11/22/2021104369014Open ↗
11/06/2020122694101Open ↗
10/15/2019123420253Open ↗
Showing 3 of 28 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISPROJECT-SPECIFIC GL INSURANCE1
03/22/2021140952100Open ↗
▸Filing & Intake Forms51
▸BISADDITIONAL INFORMATION22
05/21/2021123459569Open ↗
01/12/2021123541569Open ↗
09/30/2020140952100Open ↗
Showing 3 of 22 on file for this type
▸BISEFILING COVER SHEET14
09/18/2018123541569Open ↗
09/18/2018123541569Open ↗
08/14/2018123560654Open ↗
Showing 3 of 14 on file for this type
▸BISBOROUGH INTAKE FORM10
09/27/2021104369014Open ↗
03/20/2020123541569Open ↗
10/15/2019123420253Open ↗
Showing 3 of 10 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET5
09/17/2020140952100Open ↗
Showing 1 of 5 on file for this type