← Back
Over six families without stores
1441 TELLER AVENUE
BRONX · BIN 2007238
💬 Discuss this project
1920Year Built
2Stories
C1Building Class
R7-1Zoning
8,668 sfGross Floor Area
16Units
Rent Stabilized16 Open Violations ▸
Over six families without stores · Owner of record: 1441 TELLER AVE LLC · 3,184 sf lot · 2.72 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalGeneral
Roof43p · 1 filing · 20 docs
Penthouse41p · 1 filing · 20 docs
Floor 441p · 1 filing · 20 docs
Floor 337p · 1 filing · 20 docs
Floor 240p · 1 filing · 20 docs
Floor 137p · 1 filing · 20 docs
Basement37p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
LEFKO CAPITAL GROUP2707/08/2026
SKYWARD DEVELOPERS607/08/2026
1441 TELLER AVE LLC103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
07/08/2021$990K—Private party → 1441 TELLER AVE LLC$114/sf building
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NYC DESIGN FILE1303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SKYWARD DEVELOPERS INCGeneral Contractor1607/08/2026
MANHATTAN D ENTERPRISESGeneral Contractor407/08/2026
RIGHTWAY PLBG AND HTG INCFire Protection207/08/2026
BEST MECHANICAL SVCS INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF SERVICES CORP56161208/19/2024
Building Lifecycle
All (201)Filed (14)Permit Issued (15)Signed Off (7)Violation (45)Inspection (10)Objection (80)Special Inspection (30)
04/03/2026
Violation issued (HPD, closed)
B
04/03/2026
Violation issued (HPD, closed)
A
04/03/2026
Violation issued (HPD, open)
A
04/03/2026
Violation issued (HPD, closed)
B
09/28/2025
Violation issued (HPD, closed)
C
09/28/2025
Violation issued (HPD, closed)
C
09/17/2025
Violation issued (HPD, closed)
C
09/17/2025
Violation issued (HPD, closed)
C
09/17/2025
Violation issued (HPD, open)
C
09/17/2025
Violation issued (HPD, open)
C
09/13/2025
Violation issued (HPD, open)
C
09/13/2025
Violation issued (HPD, closed)
C
09/13/2025
Violation issued (HPD, closed)
A
09/13/2025
Violation issued (HPD, open)
C
09/13/2025
Violation issued (HPD, open)
C
06/17/2025
Violation issued (HPD, closed)
C
03/23/2025
Violation issued (HPD, closed)
C
03/23/2025
Violation issued (HPD, closed)
B
03/23/2025
Violation issued (HPD, closed)
B
03/23/2025
Violation issued (HPD, closed)
C
03/23/2025
Violation issued (HPD, closed)
C
08/26/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
08/19/2024
Filed — Alteration CO
Mechanical systems files subsequent to job application number X00484772
X00484772-P7
08/14/2024
Special inspection requirement — Lighting controls
FAHAD FATEH
08/14/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
08/14/2024
Special inspection requirement — Lighting in dwelling units
FAHAD FATEH
08/14/2024
Special inspection requirement — Air barrier - visual inspection
FAHAD FATEH
08/14/2024
Special inspection requirement — Fire-Resistance Rated Construction
FAHAD FATEH
08/14/2024
Special inspection requirement — Post-installed Anchors
FAHAD FATEH
08/14/2024
Special inspection requirement — Maintenance information
FAHAD FATEH
08/14/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
FAHAD FATEH
08/14/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
FAHAD FATEH
08/14/2024
Special inspection requirement — Insulation placement and R values
FAHAD FATEH
08/14/2024
Special inspection requirement — Interior lighting power
FAHAD FATEH
08/14/2024
Special inspection requirement — Fenestration areas
FAHAD FATEH
08/14/2024
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
08/14/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
FAHAD FATEH
08/14/2024
Special inspection requirement — Fenestration air leakage
FAHAD FATEH
08/14/2024
Special inspection requirement — Exterior lighting power
FAHAD FATEH
08/14/2024
Special inspection requirement — Concrete - Cast-In-Place
FAHAD FATEH
08/06/2024
Violation issued (HPD, open)
B
08/06/2024
Violation issued (HPD, open)
B
05/14/2024
Filed — Alteration CO
Mechanical systems files subsequent to job application number X00484772
X00484772-P6
05/02/2024
Violation issued (HPD, closed)
A
05/02/2024
Violation issued (HPD, closed)
B
05/02/2024
Violation issued (HPD, closed)
B
04/15/2024
Violation issued (HPD, open)
A
04/15/2024
Violation issued (HPD, closed)
B
04/03/2024
Violation issued (HPD, closed)
A
01/02/2024
Violation issued (HPD, open)
C
01/02/2024
Violation issued (HPD, open)
B
01/02/2024
Violation issued (HPD, closed)
C
12/29/2023
Violation issued (HPD, open)
C
12/29/2023
Violation issued (HPD, closed)
C
12/29/2023
Violation issued (HPD, closed)
C
12/29/2023
Violation issued (HPD, closed)
A
12/29/2023
Violation issued (HPD, closed)
A
12/29/2023
Violation issued (HPD, closed)
A
12/27/2023
Violation issued (HPD, closed)
C
12/27/2023
Violation issued (HPD, open)
C
Latest 60 of 201 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offRIGHTWAY PLBG AND HTG INC11/03/2022
DOB NOWStructuralSigned-offSKYWARD DEVELOPERS INC10/31/2022
DOB NOWGeneral ConstructionPermit IssuedSKYWARD DEVELOPERS INC10/29/2022
DOB NOWConstruction FenceSigned-offSKYWARD DEVELOPERS INC10/25/2022
DOB NOWMechanical SystemsSigned-offSKYWARD DEVELOPERS INC10/25/2022
DOB NOWSupport of ExcavationSigned-offSKYWARD DEVELOPERS INC08/15/2022
DOB NOWSidewalk ShedSigned-offMANHATTAN D ENTERPRISES06/24/2022
DOB NOWSidewalk ShedSigned-offMANHATTAN D ENTERPRISES06/24/2022
DOB NOWSprinklersSigned-offRIGHTWAY PLBG AND HTG INC03/23/2022
DOB NOWPlumbingSigned-offBEST MECHANICAL SVCS INC03/23/2022
DOB NOWFoundationSigned-offSKYWARD DEVELOPERS INC03/22/2022
DOB NOWStructuralSigned-offSKYWARD DEVELOPERS INC11/29/2021
DOB NOWConstruction FenceSigned-offSKYWARD DEVELOPERS INC11/05/2021
DOB NOWMechanical SystemsSigned-offSKYWARD DEVELOPERS INC11/05/2021
DOB NOWGeneral ConstructionPermit IssuedSKYWARD DEVELOPERS INC11/04/2021
1 project · most recent 08/19/2024
Air Conditioning Systems Associated Ducts and Piping Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
08/19/2024Signed-offSKYWARD DEVELOPERS INCAir Conditioning Systems, Associated Ducts and Piping, Heating Systems, Ventilation Systems
Cooling
Mitsubishi Electric MXZ-3C30NA2-U1 284,000 BTU · Condensing Unit ×9
MXZ-2C20NA2-U1 18,000 BTU · Condensing Unit ×5
MXZ-5C4NA2-U1 40,500 BTU · Vrf Outdoor ×1
MXZ-8C48NA2-U1 48,000 BTU · Vrf Outdoor ×1
Heating
Mitsubishi Electric MXZ-3C30NA2-U1 28,600 BTU · Condensing Unit ×9
MXZ0-2C2ONA2-U1 22,000 BTU · Condensing Unit ×5
MXZ-5C4NA2-U1 45,000 BTU · Vrf Outdoor ×1
MXZ-8C48NA2-U1 54,000 BTU · Vrf Outdoor ×1
Qmark MUH0381 Electric Heater ×3
Markel E3323TD-RP 5,120 BTU · Electric Heater ×2
Cadet 2f500w-1w 500 kW · Radiant ×1
Ventilation
Nutone AEN110 50 CFM · Exhaust Fan ×19
QTXEN150 100 CFM · Exhaust Fan ×16
Ducts & Piping
Masterflow GFS24X361 24,000 BTU · Ductwork ×1
1 project · most recent 08/19/2024
Sprinkler System
FiledStatusContractorScope
08/19/2024Signed-offRIGHTWAY PLBG AND HTG INCSprinkler System
1 project · most recent 08/19/2024
Gas Storm Water/Sanitary
FiledStatusContractorScope
08/19/2024Signed-offBEST MECHANICAL SVCS INCGas, Storm, Water/Sanitary
2 projects · most recent 06/22/2023
General Wiring
FiledStatusContractorScope
06/22/2023CompleteS&R ELECTRICAL & MECHANICGeneral Wiring
03/13/2022CompleteV. VASS ELECTRIC CORP—
1 project · most recent 08/19/2024
Steel
FiledStatusContractorScope
08/19/2024Signed-offRIGHTWAY PLBG AND HTG INCSteel
1 project · most recent 08/19/2024
Fence
FiledStatusContractorScope
08/19/2024Signed-offRIGHTWAY PLBG AND HTG INCFence
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
08/26/2024Pass-Final CND-Occupancy InspectionPassView ↗
06/08/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
06/08/2023Pass-Final CND-Occupancy InspectionPassView ↗
06/06/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
05/24/2023Fail-Final CND-Occupancy InspectionFailView ↗
05/11/2023Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
05/11/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
02/13/2023Pass-Final PL - Up to 9 Requested FloorsPassView ↗
12/20/2022Pass-Final CND-Occupancy InspectionPassView ↗
04/13/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 69
DateRequirementInspectorRole
08/14/2024Fenestration and door U-factor and product ratingsFAHAD FATEHenergy_progress
08/14/2024Concrete - Cast-In-PlaceFAHAD FATEHspecial
08/14/2024Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
08/14/2024Post-installed AnchorsFAHAD FATEHspecial
08/14/2024Structural Stability – Alterations of existing buildingsFAHAD FATEHspecial
08/14/2024Energy Code Compliance InspectionsFAHAD FATEHprogress
08/14/2024Fire-Resistance Rated ConstructionFAHAD FATEHprogress
08/14/2024Fenestration areasFAHAD FATEHenergy_progress
08/14/2024Interior lighting powerFAHAD FATEHenergy_progress
08/14/2024Lighting controlsFAHAD FATEHenergy_progress
08/14/2024Air barrier - visual inspectionFAHAD FATEHenergy_progress
08/14/2024Insulation placement and R valuesFAHAD FATEHenergy_progress
08/14/2024HVAC-R and service water piping design and insulationFAHAD FATEHenergy_progress
08/14/2024Lighting in dwelling unitsFAHAD FATEHenergy_progress
08/14/2024Fenestration air leakageFAHAD FATEHenergy_progress
08/14/2024Exterior lighting powerFAHAD FATEHenergy_progress
08/14/2024Maintenance informationFAHAD FATEHenergy_progress
10/27/2023Concrete - Cast-In-PlaceFAHAD FATEHspecial
10/27/2023Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
10/27/2023Post-installed AnchorsFAHAD FATEHspecial
10/27/2023Structural Stability – Alterations of existing buildingsFAHAD FATEHspecial
10/27/2023Energy Code Compliance InspectionsFAHAD FATEHprogress
10/27/2023Fire-Resistance Rated ConstructionFAHAD FATEHprogress
10/27/2023Fenestration areasFAHAD FATEHenergy_progress
10/27/2023Lighting in dwelling unitsFAHAD FATEHenergy_progress
Latest 25 of 69.
▾Documents — 111 on file (BIS + DOB NOW)
▸Plans & Drawings14
▸DOB NOWPlans/Sketch14
08/24/2026X00696676-I1Request digital key ↗
08/22/2026X00484772-S4Request digital key ↗
08/22/2026X00484772-P6Request digital key ↗
Showing 3 of 14 on file for this type
▸Zoning, Tax Lot & Property Records11
▸DOB NOWZD1: DOB Zoning Diagram5
08/13/2026X00484772-I1Open ↗
08/13/2026X00484772-P4Open ↗
08/13/2026X00484772-P5Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWZoning Exhibit form (1-5)5
08/13/2026X00484772-P4Open ↗
08/13/2026X00484772-P6Open ↗
08/13/2026X00484772-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026X00484772-I1Open ↗
▸Seals & Professional Certifications34
▸DOB NOWDPL-1: Design Professional Seal & Signature14
08/22/2026X00484772-S3Open ↗
08/22/2026X00484772-S2Open ↗
08/22/2026X00484772-S1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWProgress Inspector Seal & Signature10
08/31/2026X00484772-S3Open ↗
08/31/2026X00484772-S3Open ↗
08/31/2026X00484772-P1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature10
08/31/2026X00484772-S3Open ↗
08/31/2026X00484772-S3Open ↗
08/31/2026X00484772-S3Open ↗
Showing 3 of 10 on file for this type
▸Trade Schedules & Equipment5
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)5
08/13/2026X00484772-P4Open ↗
08/13/2026X00484772-P6Open ↗
08/13/2026X00484772-P5Open ↗
Showing 3 of 5 on file for this type
▸Safety & Tenant Protection8
▸DOB NOWStreet Tree Checklist5
08/13/2026X00484772-I1Open ↗
08/13/2026X00484772-P6Open ↗
08/13/2026X00484772-P4Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWStreet Tree Sign Off1
08/13/2026X00484772-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026X00484772-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026X00484772-I1Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/22/2026X00484772-S4Open ↗
08/15/2026X00484772-S6Open ↗
08/15/2026X00484772-S5Open ↗
Showing 3 of 4 on file for this type
▸Energy Compliance3
▸DOB NOWEN2: As Built Energy Analysis.3
08/13/2026X00484772-I1Open ↗
08/13/2026X00484772-S4Open ↗
08/13/2026X00484772-S5Open ↗
▸Inspections & Test Reports7
▸DOB NOWSOIL REPORT3
08/13/2026X00484772-S3Open ↗
08/13/2026X00484772-S2Open ↗
08/13/2026X00484772-P2Open ↗
▸DOB NOWTR4 Plot Diagram2
08/13/2026X00484772-S2Open ↗
08/13/2026X00484772-S3Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram2
08/13/2026X00484772-S3Open ↗
08/13/2026X00484772-S2Open ↗
▸Cost, Insurance & Ownership2
▸DOB NOWCertificate of Insurance1
08/13/2026X00484772-I1Open ↗
▸DOB NOWCertification by Insurance Broker or Agency1
08/13/2026X00484772-I1Open ↗
▸Filing & Intake Forms2
▸DOB NOWAI1 Form (from plan PDF)2
08/16/2026X00484772-P2Open ↗
08/16/2026X00484772-P1Open ↗
▸Other Documents21
▸DOB NOWPlot Diagram8
08/13/2026X00484772-P7Open ↗
08/13/2026X00484772-I1Open ↗
08/13/2026X00484772-S2Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSite Survey: Initial5
08/13/2026X00484772-P7Open ↗
08/13/2026X00484772-I1Open ↗
08/13/2026X00484772-P4Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone5
08/13/2026X00484772-P6Open ↗
08/13/2026X00484772-P4Open ↗
08/13/2026X00484772-P5Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWFinal Survey1
08/13/2026X00484772-I1Open ↗
▸DOB NOWAdditional Insured Authorizations1
08/13/2026X00484772-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026X00484772-S2Open ↗