← Back
BuildNYC
Three families
1442 MINFORD PLACE
BRONX · BIN 2010506
💬 Discuss this project
1920Year Built
2Stories
C0Building Class
R7-1Zoning
2,892 sfGross Floor Area
3Units
Rent Stabilized32 Active Violations ▸
Three families · 2,500 sf lot · 1.16 FAR built · Flood zone X
Locations of Work
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof1 filing · 13 docs
Floor 21 filing · 13 docs
Floor 11 filing · 13 docs
Sub-Basement1 filing · 13 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Jose A. Santos P.E.P.C206/26/2025
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Jose A Santos PE3292206/26/2025
Building Lifecycle
04/30/2026
(a) § hmc:file annual bedbug report in accordance with HPD rule as described on the back of this notice of violation or as described on HPDs…
HPD violation · open
11/17/2025
§27-2107 ADM code owner failed to file a valid registration statement with the department as required by ADM code §27-2097 and is therefore subject…
HPD violation · open
07/11/2025
Objection resolved — Addressed
06/30/2025
Objection raised — Structural
06/26/2025
Filed — Alteration
PROPOSE TO PERFORM INTERIOR RENOVATION OF EXISTING 3-FAMILY DWELLING AS PER PLANS SUBMITTED HERWITH. NO CHANGE IN USE, OCCUPANCY, OR MEANS OF EGRESS.
X01203521-S1
61 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Nothing on file for this building.
1 project · most recent 06/26/2025
Wood
FiledStatusContractorScope
06/26/2025——Wood
▾Special Inspection Requirements (DOB NOW) — 22
DateRequirementInspectorRole
06/25/2025Air barrier - visual inspectionJose Santosenergy_progress
06/24/2025Fenestration and door U-factor and product ratingsJose Santosenergy_progress
06/23/2025Interior lighting powerJose Santosenergy_progress
06/23/2025Fire-Resistant Penetrations and JointsJose Santosspecial
06/23/2025Structural Stability – Alterations of existing buildingsJose Santosspecial
06/23/2025FinalRilder Mejiaprogress
06/23/2025Energy Code Compliance InspectionsJose Santosprogress
06/23/2025Fire-Resistance Rated ConstructionJose Santosprogress
06/23/2025Structural Wood FrameJose Santosprogress
06/23/2025Insulation placement and R valuesJose Santosenergy_progress
06/23/2025Lighting in dwelling unitsJose Santosenergy_progress
06/23/2025Fenestration areasJose Santosenergy_progress
06/23/2025Wood – Seismic ResistanceJose Santosspecial
04/29/2025Insulation placement and R valuesJose Santosenergy_progress
04/29/2025Fenestration areasJose Santosenergy_progress
04/28/2025Fire-Resistance Rated ConstructionJose Santosprogress
04/28/2025Structural Wood FrameJose Santosprogress
04/28/2025Fire-Resistant Penetrations and JointsJose Santosspecial
04/28/2025Energy Code Compliance InspectionsJose Santosprogress
04/28/2025Structural Stability – Alterations of existing buildingsJose Santosspecial
03/31/2025FinalRilder Mejiaprogress
03/31/2025Wood – Seismic ResistanceJose Santosspecial
13 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account