← Back
Two stories - detached, small or mid-size
1447 80 STREET
BROOKLYN · BIN 3162639
💬 Discuss this project
1925Year Built
2Stories
A1Building Class
R4Zoning
1,350 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 2,658 sf lot · 0.51 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingGeneral
Roof7p · 4 filings · 20 docs
Bulkhead1p · 1 filing · 11 docs
Floor 31p · 1 filing · 11 docs
Floor 26p · 4 filings · 20 docs
Floor 14p · 2 filings · 20 docs
Cellar7p · 4 filings · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
11/21/2016$830K—Private party → Private party$615/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
OCEAN ENTERPRISES INC.303/06/2025
LAURIA ASSOCIATES303/08/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
QUICKFAST803/21/2026
JUST ARCHITECTURE203/21/2026
Building Lifecycle
All (54)Filed (6)Objection (19)Special Inspection (29)
08/03/2026
Objection resolved — Addressed
07/30/2026
Objection resolved — Addressed
06/22/2026
Objection resolved — Addressed
06/22/2026
Objection resolved — Addressed
06/22/2026
Objection resolved — Addressed
06/03/2026
Objection raised — Scope
06/03/2026
Objection raised — Scope
06/03/2026
Objection raised — Scope
06/03/2026
Objection raised — Scope
06/03/2026
Objection raised — Fire_Protection
03/12/2025
Objection raised — Admin
03/06/2025
Filed — Alteration
GENERAL CONSTRUCTION, FOUNDATION, STRUCTURAL AND MECHANICAL WORK TO RENOVATE AND ENLARGE EXISTING DETACHED RESIDENCE AT THE CELLAR THROUGH ROOF AND FACADE
B01133943-I1
03/03/2025
Filed — Alteration
B01148721-I1
03/03/2025
Filed — Alteration
Install temporary construction wood fence to be removed upon completion of work indicated on drawings filed herewith No change in Use Egress or Occupancy under this application
B01148735-I1
12/16/2024
Special inspection requirement — HVAC-R and service water heating equipment
12/16/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
12/16/2024
Special inspection requirement — Insulation placement and R values
12/16/2024
Special inspection requirement — Permanent certificate
12/16/2024
Special inspection requirement — Interior lighting power
12/16/2024
Special inspection requirement — Concrete - Cast-In-Place
12/16/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
12/16/2024
Special inspection requirement — Structural Steel - High Strength Bolting
12/16/2024
Special inspection requirement — Structural Steel - Welding
12/16/2024
Special inspection requirement — Subgrade Inspections
12/16/2024
Special inspection requirement — Structural Cold-Formed Steel
12/16/2024
Special inspection requirement — Structural Steel - Details
12/16/2024
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
12/16/2024
Special inspection requirement — Ventilation and air distribution system
12/16/2024
Special inspection requirement — HVAC-R and service water heating system controls
12/16/2024
Special inspection requirement — Energy Code Compliance Inspections
12/16/2024
Special inspection requirement — Fire-Resistance Rated Construction
12/16/2024
Special inspection requirement — Air barrier - visual inspection
12/16/2024
Special inspection requirement — Fenestration areas
12/16/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
12/16/2024
Special inspection requirement — Fenestration air leakage
12/16/2024
Special inspection requirement — Maintenance information
10/29/2024
Special inspection requirement — Footing and Foundation
10/29/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
10/29/2024
Special inspection requirement — Mechanical Systems
10/29/2024
Special inspection requirement — Final
03/15/2024
Objection raised — Energy
03/15/2024
Objection raised — Scope
03/15/2024
Objection raised — Scope
03/15/2024
Objection raised — Inspections
03/15/2024
Objection raised — Scope
03/15/2024
Objection raised — Scope
03/08/2024
Filed — Alteration
RELOCATE (1) GAS METER AT CELLAR TO OSP, (1) GAS RANGE & (1) SINK AT 1st FL, (1) TUB, (1) LAV & (1) TOILET AT 2nd Fl AND PROVIDE (1) NEW SINK, (1) NEW DISHWASHER, (1) NEW TOILET & (1) NEW LAV AT 1st FL, (1) NEW SHOWER, (2) NEW LAVS, (1) NEW TOILET AT 2nd
B00924710-I1
03/08/2024
Filed — ALT-CO - New Building with Existing Elements to Remain
B00924703-I1
02/08/2024
Objection raised — Inspections
02/08/2024
Objection raised — Scope
02/01/2024
Filed — Alteration
Install an 8'-0" temporary wood fence to be removed only after completion of all work.
B00924714-I1
10/16/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
10/16/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
10/16/2023
Special inspection requirement — Energy Code Compliance Inspections
Nothing on file for this building.
1 project · most recent 03/06/2025
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
03/06/2025——Heating and Air Conditioning Systems
Heat / Cool
Mitsubishi Electric To be determined 24,000 BTU · Condensing Unit ×2
1 project · most recent 03/08/2024
Gas Storm Water/Sanitary
FiledStatusContractorScope
03/08/2024——Gas, Storm, Water/Sanitary
1 project · most recent 03/06/2025
Steel
FiledStatusContractorScope
03/06/2025——Steel
1 project · most recent 03/03/2025
Fence
FiledStatusContractorScope
03/03/2025——Fence
▾Special Inspection Requirements (DOB NOW) — 29
DateRequirementInspectorRole
12/16/2024HVAC-R and service water heating equipment—energy_progress
12/16/2024Fenestration and door U-factor and product ratings—energy_progress
12/16/2024Insulation placement and R values—energy_progress
12/16/2024Permanent certificate—energy_progress
12/16/2024Interior lighting power—energy_progress
12/16/2024Concrete - Cast-In-Place—special
12/16/2024Fire-Resistant Penetrations and Joints—special
12/16/2024Structural Steel - High Strength Bolting—special
12/16/2024Structural Steel - Welding—special
12/16/2024Subgrade Inspections—special
12/16/2024Structural Cold-Formed Steel—special
12/16/2024Structural Steel - Details—special
12/16/2024Subsurface Investigations (Borings/Test Pits)—special
12/16/2024Ventilation and air distribution system—energy_progress
12/16/2024HVAC-R and service water heating system controls—energy_progress
12/16/2024Energy Code Compliance Inspections—progress
12/16/2024Fire-Resistance Rated Construction—progress
12/16/2024Air barrier - visual inspection—energy_progress
12/16/2024Fenestration areas—energy_progress
12/16/2024HVAC-R and service water piping design and insulation—energy_progress
12/16/2024Fenestration air leakage—energy_progress
12/16/2024Maintenance information—energy_progress
10/29/2024Footing and Foundation—progress
10/29/2024Structural Stability – Alterations of existing buildings—special
10/29/2024Mechanical Systems—special
Latest 25 of 29.
▾Documents — 32 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/26/2026B00924714-I1Request digital key ↗
08/25/2026B00924703-I1Request digital key ↗
08/22/2026B01148735-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸Zoning, Tax Lot & Property Records3
▸DOB NOWZD1: DOB Zoning Diagram3
08/15/2026B01133943-I1Open ↗
08/13/2026B01133943-I1Open ↗
08/13/2026B00924703-I1Open ↗
▸Seals & Professional Certifications6
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/26/2026B00924714-I1Open ↗
08/25/2026B00924703-I1Open ↗
08/22/2026B01148721-I1Open ↗
Showing 3 of 6 on file for this type
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form4
08/25/2026B00924703-I1Open ↗
08/22/2026B01148721-I1Open ↗
08/15/2026B01133943-I1Open ↗
Showing 3 of 4 on file for this type
▸Inspections & Test Reports6
▸DOB NOWTR4 Test Report and Plot Diagram2
08/13/2026B01133943-I1Open ↗
08/13/2026B00924703-I1Open ↗
▸DOB NOWSOIL REPORT2
08/13/2026B01133943-I1Open ↗
08/13/2026B00924703-I1Open ↗
▸DOB NOWGeotechnical Report (BC 1803.6)2
08/13/2026B01133943-I1Open ↗
08/13/2026B00924703-I1Open ↗
▸Other Documents7
▸DOB NOWSite Survey: Initial2
08/13/2026B01133943-I1Open ↗
08/13/2026B00924703-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026B00924703-I1Open ↗
08/13/2026B01133943-I1Open ↗
▸DOB NOWPlot Diagram1
08/13/2026B01133943-I1Open ↗
▸DOB NOWProperty Ownership Certification1
08/25/2026B00924703-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026B00924703-I1Open ↗