Over six families without stores
1447 BRYANT AVENUE
BRONX · BIN 2010741
💬 Discuss this project
1910Year Built
3Stories
C1Building Class
R7-1Zoning
4,000 sfGross Floor Area
10Units
Rent Stabilized3 Open Violations ▸
Over six families without stores · Owner of record: 1447 SZ LLC · 2,000 sf lot · 2 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalFire Protection
Floor 318p · 1 filing · 20 docs
Floor 219p · 1 filing · 20 docs
Floor 118p · 1 filing · 20 docs
Basement18p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
WESTORCHARD MANAGEMENT1409/13/2026
1447 SZ LLC203/22/2026
H BUILDERS NYC403/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
03/18/2025$750K—— → —$188/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ADB ASSOCIATES707/07/2026
JLN ENGINEERING PLLC109/29/2025
VASILIOS ARTEMIOU PE109/11/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
EXPRESS FILING INC1403/21/2026
NYC DESIGN FILE103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
H BUILDERS NYC LLCGeneral Contractor607/08/2026
POWER DIRECT ELECTRIC INCElectrical103/22/2026
PRIME PIPING & HEATING INFire Protection107/08/2026
PRIME PIPING & HEATING INPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF SERVICES CORP56161107/07/2026
SHAHRISH SHUVO ENGINEERIN8524109/29/2025
Building Lifecycle
All (128)Filed (9)Permit Issued (6)Signed Off (4)Violation (25)Inspection (10)Objection (44)Special Inspection (30)
07/07/2026
Filed — Alteration CO
STRUCTURAL SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION JOB #X01062702-I1
X01062702-P5
07/06/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
FAHAD FATEH
07/06/2026
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
FAHAD FATEH
07/06/2026
Special inspection requirement — Metering
FAHAD FATEH
07/06/2026
Special inspection requirement — Interior lighting power
FAHAD FATEH
07/06/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
FAHAD FATEH
07/06/2026
Special inspection requirement — Air barrier - visual inspection
FAHAD FATEH
07/06/2026
Special inspection requirement — Fenestration air leakage
FAHAD FATEH
07/06/2026
Special inspection requirement — Fire-Resistance Rated Construction
FAHAD FATEH
07/06/2026
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
07/06/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
07/06/2026
Special inspection requirement — Permanent certificate
FAHAD FATEH
07/06/2026
Special inspection requirement — Insulation placement and R values
FAHAD FATEH
07/06/2026
Special inspection requirement — Fenestration areas
FAHAD FATEH
07/06/2026
Special inspection requirement — Maintenance information
FAHAD FATEH
12/09/2025
Signed off — Alteration CO
STRUCTURAL SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION JOB #X01062702-I1
X01062702-S4
12/08/2025
Permit issued — Structural
X01062702-S4-ST
11/10/2025
Objection resolved — Addressed
10/21/2025
Objection resolved — Addressed
10/21/2025
Objection resolved — Addressed
10/01/2025
Objection raised — Structural
10/01/2025
Objection raised — Structural
10/01/2025
Objection raised — Admin
09/29/2025
Filed — Alteration CO
STRUCTURAL SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION JOB #X01062702-I1
X01062702-S4
09/29/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Shahrish Shuvo
09/15/2025
Special inspection requirement — Final
Shahrish Shuvo
09/02/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
08/29/2025
Signed off — Alteration CO
STRUCTURAL SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION JOB #X01062702-I1
X01062702-S2
08/20/2025
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
07/22/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
07/22/2025
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
07/22/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
FAHAD FATEH
07/22/2025
Special inspection requirement — HVAC-R and service water heating equipment
FAHAD FATEH
07/22/2025
Special inspection requirement — Maintenance information
FAHAD FATEH
07/22/2025
Special inspection requirement — HVAC-R and service water heating system controls
FAHAD FATEH
07/09/2025
Signed off — Alteration CO
STRUCTURAL SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION JOB #X01062702-I1
X01062702-S3
06/30/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
06/30/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
06/24/2025
Signed off — Alteration CO
STRUCTURAL SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION JOB #X01062702-I1
X01062702-S1
06/19/2025
Filed — Alteration CO
STRUCTURAL SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION JOB #X01062702-I1
X01062702-P3
06/11/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/09/2025
Filed — Alteration CO
STRUCTURAL SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION JOB #X01062702-I1
X01062702-P2
06/06/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
06/05/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
06/05/2025
Special inspection requirement — Heating Systems
FAHAD FATEH
06/05/2025
Special inspection requirement — Mechanical Systems
FAHAD FATEH
06/05/2025
Special inspection requirement — Post-installed Anchors
FAHAD FATEH
06/05/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
06/05/2025
Special inspection requirement — Final
FAHAD FATEH
06/05/2025
Special inspection requirement — Fire-Resistance Rated Construction
FAHAD FATEH
06/05/2025
Special inspection requirement — HVAC-R and service water heating system controls
FAHAD FATEH
06/04/2025
Violation issued (HPD, closed)
A
06/04/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
04/30/2025
Violation issued (ECB, closed)
Unknown
04/30/2025
Violation issued (ECB, closed)
Construction
04/30/2025
Violation issued (ECB, closed)
Construction
04/22/2025
Permit issued — General Construction
X01062702-I1-GC
04/16/2025
Violation issued (ECB, closed)
Site Safety
04/04/2025
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
04/04/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
Latest 60 of 128 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralSigned-offH BUILDERS NYC LLC12/08/2025
DOB NOWGeneral ConstructionPermit IssuedH BUILDERS NYC LLC04/22/2025
DOB NOWGeneral ConstructionPermit IssuedH BUILDERS NYC LLC03/28/2025
DOB NOWMechanical SystemsSigned-offH BUILDERS NYC LLC03/26/2025
DOB NOWPlumbingSigned-offPRIME PIPING & HEATING IN03/25/2025
DOB NOWSprinklersSigned-offA M B MECHANICAL INC03/24/2025
1 project · most recent 07/07/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
07/07/2026Signed-offH BUILDERS NYC LLCHeating and Air Conditioning Systems
Heat / Cool
Daikin RFX12BVJU9 13,500 BTU · Vrf Outdoor ×9
3MXM24AVJU9 24,000 BTU · Heat Pump Outdoor ×1
4 projects · most recent 04/15/2026
General Wiring
FiledStatusContractorScope
04/15/2026CompletePOWER DIRECT ELECTRIC INCGeneral Wiring
11/19/2025CompletePOWER DIRECT ELECTRIC INCGeneral Wiring
11/19/2025CompletePOWER DIRECT ELECTRIC INCGeneral Wiring
10/16/2025CompletePOWER DIRECT ELECTRIC INCGeneral Wiring
1 project · most recent 07/07/2026
Wood
FiledStatusContractorScope
07/07/2026Signed-offH BUILDERS NYC LLCWood
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
09/02/2025Pass-Final CND-Occupancy InspectionPassView ↗
08/20/2025Fail-Final CND-Occupancy InspectionFailView ↗
06/30/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
06/30/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/11/2025Pass-Final CND-Occupancy InspectionPassView ↗
06/06/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
06/04/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
04/04/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
04/04/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/04/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 49
DateRequirementInspectorRole
07/06/2026Structural Stability – Alterations of existing buildingsFAHAD FATEHspecial
07/06/2026Exterior Insulation and Finish Systems (EIFS)FAHAD FATEHspecial
07/06/2026MeteringFAHAD FATEHenergy_progress
07/06/2026Interior lighting powerFAHAD FATEHenergy_progress
07/06/2026Fenestration and door U-factor and product ratingsFAHAD FATEHenergy_progress
07/06/2026Air barrier - visual inspectionFAHAD FATEHenergy_progress
07/06/2026Fenestration air leakageFAHAD FATEHenergy_progress
07/06/2026Fire-Resistance Rated ConstructionFAHAD FATEHprogress
07/06/2026Energy Code Compliance InspectionsFAHAD FATEHprogress
07/06/2026Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
07/06/2026Permanent certificateFAHAD FATEHenergy_progress
07/06/2026Insulation placement and R valuesFAHAD FATEHenergy_progress
07/06/2026Fenestration areasFAHAD FATEHenergy_progress
07/06/2026Maintenance informationFAHAD FATEHenergy_progress
09/29/2025Structural Stability – Alterations of existing buildingsShahrish Shuvospecial
09/15/2025FinalShahrish Shuvoprogress
07/22/2025Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
07/22/2025Energy Code Compliance InspectionsFAHAD FATEHprogress
07/22/2025HVAC-R and service water piping design and insulationFAHAD FATEHenergy_progress
07/22/2025HVAC-R and service water heating equipmentFAHAD FATEHenergy_progress
07/22/2025Maintenance informationFAHAD FATEHenergy_progress
07/22/2025HVAC-R and service water heating system controlsFAHAD FATEHenergy_progress
06/05/2025Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
06/05/2025Heating SystemsFAHAD FATEHspecial
06/05/2025Mechanical SystemsFAHAD FATEHspecial
Latest 25 of 49.
▾Documents — 54 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
08/21/2026X01062702-S3Request digital key ↗
08/21/2026X01062702-S2Request digital key ↗
08/21/2026X01062702-S1Request digital key ↗
Showing 3 of 9 on file for this type
▸Zoning, Tax Lot & Property Records2
▸DOB NOWHouse Number Verification: TOPO Stamp2
08/13/2026X01062702-I1Open ↗
08/13/2026X01062702-P1Open ↗
▸Seals & Professional Certifications27
▸DOB NOWProgress Inspector Seal & Signature9
09/10/2026X01062702-P5Open ↗
09/10/2026X01062702-P5Open ↗
08/31/2026X01062702-P1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature9
09/10/2026X01062702-P5Open ↗
09/10/2026X01062702-P5Open ↗
09/10/2026X01062702-P5Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/21/2026X01062702-S3Open ↗
08/21/2026X01062702-S2Open ↗
08/21/2026X01062702-I1Open ↗
Showing 3 of 9 on file for this type
▸Safety & Tenant Protection3
▸DOB NOWStreet Tree Checklist3
08/21/2026X01062702-P5Open ↗
08/13/2026X01062702-P1Open ↗
08/13/2026X01062702-I1Open ↗
▸Environmental & Asbestos9
▸DOB NOWDEP ACP-5: Asbestos Assessment Report9
08/21/2026X01062702-S3Open ↗
08/21/2026X01062702-S2Open ↗
08/21/2026X01062702-S1Open ↗
Showing 3 of 9 on file for this type
▸Other Documents4
▸DOB NOWProperty Ownership Certification3
08/21/2026X01062702-I1Open ↗
08/21/2026X01062702-P5Open ↗
08/21/2026X01062702-P1Open ↗
▸DOB NOWFinal Survey1
08/13/2026X01062702-I1Open ↗