Whole building & multi-floor projectsEast 82 Owner, LLCUnder Construction11 filings
Installation of new plumbing system: Install new plumbing fixtures and associated piping on the Cellar, 1-38th Floor & Roof (CO)/ Cellar, 1, 3-21, M1, Club1, Club2, 26-35, PH1, PH2A, PH2B, M2, M3, M4, RF1 (Marketing Floors) as per plans.
On file for this project
19 documents · 1 drawing sheet
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLAN. THERE IS NO CHANGE IN USE, EGRESS OR OCCUPANCY. THE SIDEWALK SHED IS AT E 82ND STREET AND 3RD AVENUE ELEVATIONS. THE SIDEWALK SHED AT 2ND FLOOR ROOF, AT 170 E 83RD STREET AND BALCONY OF 167 E 82 STREET
On file for this project
12 documents
HEREWITH FILING SUPPORT OF EXCAVATION WORK IN CONJUNCTION WITH NEW BUILDING.
On file for this project
113 documents · 8 drawing sheets
Latest 3 of 11 filings on this floor.
RoofEast82owner, LLCUnder Construction3p · 3 filings
ArchitectureCivilElectricalEquipmentFire ProtectionGeneralLandscapeMechanicalPlumbingStructural
Issued Permit Scope
Plumbing · Protection and Mechanical Methods · Sidewalk Shed · Structural
Installation of three (3) new condensing boilers and associated pumps and suction diffusers on the 37th Floor (CO)/ M3 (Mktg) and install drain, flow bypass valve, differential pressure sensor and future boiler connections on the Cellar as per plans.
On file for this project
9 documents · 1 drawing sheet
INSTALLATION OF 2-PT SCAFFOLD IN ACCORDANCE WITH NYCC 2022 CHAPTER 33 BUILDING CODE. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
On file for this project
4 documents · 1 drawing sheet
Installation of underground plumbing fixtures: (15) new Floor Drains, (2) new duplex sewer ejectors, (2) new elevator sump pumps, (1) storm ejector and associated sanitary/CW piping on the Cellar level as per plans. No change to use, egress or occupancy.
On file for this project
6 documents · 1 drawing sheet
Floor 38East82owner, LLCUnder Construction3p · 2 filings
ArchitectureCivilElectricalEquipmentFire ProtectionGeneralLandscapeMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
INSTALLATION OF A TEMPORARY HOIST COMPLEX AS PER PLANS DURING NB CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. HOIST COMPLEX INSTALLED IN ACCORDANCE WITH 2022 NYC BUILDING CODE, CHAPTER 33
On file for this project
6 documents · 2 drawing sheets
Installation of underground plumbing fixtures: (15) new Floor Drains, (2) new duplex sewer ejectors, (2) new elevator sump pumps, (1) storm ejector and associated sanitary/CW piping on the Cellar level as per plans. No change to use, egress or occupancy.
On file for this project
6 documents · 1 drawing sheet
Floor 37East82owner, LLCUnder Construction1p · 1 filing
ArchitectureElectricalEquipmentFire ProtectionGeneralLandscapeMechanicalPlumbingStructural
Issued Permit Scope
Boiler Equipment · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural · Supported Scaffold
Installation of three (3) new condensing boilers and associated pumps and suction diffusers on the 37th Floor (CO)/ M3 (Mktg) and install drain, flow bypass valve, differential pressure sensor and future boiler connections on the Cellar as per plans.
On file for this project
9 documents · 1 drawing sheet
Floor 36East82owner, LLCUnder Construction1p · 1 filing
ArchitectureElectricalEquipmentFire ProtectionGeneralLandscapeMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural · Supported Scaffold
INSTALLATION OF 2-PT SCAFFOLD IN ACCORDANCE WITH NYCC 2022 CHAPTER 33 BUILDING CODE. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
On file for this project
4 documents · 1 drawing sheet
Floor 35East82owner, LLCUnder Construction1p · 1 filing
ArchitectureElectricalEquipmentFire ProtectionGeneralLandscapeMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural · Supported Scaffold
INSTALLATION OF 2-PT SCAFFOLD IN ACCORDANCE WITH NYCC 2022 CHAPTER 33 BUILDING CODE. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
On file for this project
4 documents · 1 drawing sheet
Floor 34
Floor 33
Floor 32
Floor 31
Floor 30
Floor 29
Floor 28East82owner, LLCUnder Construction1p · 1 filing
ArchitectureElectricalEquipmentFire ProtectionGeneralLandscapeMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
INSTALLATION OF 2-PT SCAFFOLD IN ACCORDANCE WITH NYCC 2022 CHAPTER 33 BUILDING CODE. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
On file for this project
4 documents · 1 drawing sheet
Floor 27
Floor 26
Floor 25
Floor 24
Floor 23
Floor 22
Floor 21
Floor 20East82owner, LLCUnder Construction1p · 2 filings
ArchitectureElectricalEquipmentFire ProtectionGeneralLandscapeMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural · Supported Scaffold
Installation of new emergency generator, wiring, piping and regulator vents on the 20th Floor (CO)/ M1 (Mktg) and emergency generator gas booster and gas meter and associated piping and regulator vents on the Cellar Level as per plans.
On file for this project
9 documents
Installation of underground plumbing fixtures: (15) new Floor Drains, (2) new duplex sewer ejectors, (2) new elevator sump pumps, (1) storm ejector and associated sanitary/CW piping on the Cellar level as per plans. No change to use, egress or occupancy.
On file for this project
6 documents · 1 drawing sheet
Floor 19
Floor 18East82owner, LLCUnder Construction1p · 1 filing
ArchitectureElectricalEquipmentFire ProtectionGeneralLandscapeMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
INSTALLATION OF 2-PT SCAFFOLD IN ACCORDANCE WITH NYCC 2022 CHAPTER 33 BUILDING CODE. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
On file for this project
4 documents · 1 drawing sheet
Floor 17
Floor 16East82owner, LLC1p · 1 filing
ArchitectureElectricalEquipmentFire ProtectionGeneralLandscapeMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
Installation of underground plumbing fixtures: (15) new Floor Drains, (2) new duplex sewer ejectors, (2) new elevator sump pumps, (1) storm ejector and associated sanitary/CW piping on the Cellar level as per plans. No change to use, egress or occupancy.
On file for this project
6 documents · 1 drawing sheet
Floor 15
Floor 14
Floor 13
Floor 12
Floor 11
Floor 10
Floor 9
Floor 8East82owner, LLCUnder Construction1p · 2 filings
ArchitectureCivilElectricalEquipmentFire ProtectionGeneralLandscapeMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sidewalk Shed · Sprinklers · Standpipe · Structural · Supported Scaffold
INSTALLATION OF TEMPORARY SYSTEM STAIRS TOWER AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. THE SYSTEM STAIRS TOWER FROM THE FIRST FLOOR TO THE EIGHTH FLOOR AT EAST 82ND STREET ELEVATION
On file for this project
36 documents
INSTALLATION OF 2-PT SCAFFOLD IN ACCORDANCE WITH NYCC 2022 CHAPTER 33 BUILDING CODE. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
On file for this project
4 documents · 1 drawing sheet
Floor 7East82owner, LLCUnder Construction1p · 1 filing
ArchitectureCivilElectricalEquipmentFire ProtectionGeneralLandscapeMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sidewalk Shed · Sprinklers · Standpipe · Structural · Supported Scaffold
INSTALLATION OF 2-PT SCAFFOLD IN ACCORDANCE WITH NYCC 2022 CHAPTER 33 BUILDING CODE. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
On file for this project
4 documents · 1 drawing sheet
Floor 6East82owner, LLCUnder Construction1p · 1 filing
ArchitectureCivilElectricalEquipmentFire ProtectionGeneralLandscapeMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sidewalk Shed · Sprinklers · Standpipe · Structural · Supported Scaffold
INSTALLATION OF 2-PT SCAFFOLD IN ACCORDANCE WITH NYCC 2022 CHAPTER 33 BUILDING CODE. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
On file for this project
4 documents · 1 drawing sheet
Floor 5
Floor 4
Floor 3
Floor 2
Floor 1East82owner, LLCUnder Construction6p · 5 filings
ArchitectureCivilElectricalEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Curb Cut · General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sidewalk Shed · Sprinklers · Standpipe · Structural
Herewith filing curb cut on East 82nd Street. Work in conjunction with New Building #M00995463-I1, and BPP application #141025469.
On file for this project
2 documents
INSTALLATION OF A TEMPORARY HOIST COMPLEX AS PER PLANS DURING NB CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. HOIST COMPLEX INSTALLED IN ACCORDANCE WITH 2022 NYC BUILDING CODE, CHAPTER 33
On file for this project
6 documents · 2 drawing sheets
Installation and use of power operated hoisting equipment, specifically a 5-ton-push-trolley between the Ground floor and Cellar level.
On file for this project
2 documents
Latest 3 of 5 filings on this floor.
CellarEast82owner, LLCUnder Construction5p · 4 filings
ArchitectureFire ProtectionGeneralMechanicalPlumbingStructuralOther
Issued Permit Scope
Boiler Equipment · General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe
Installation of three (3) new condensing boilers and associated pumps and suction diffusers on the 37th Floor (CO)/ M3 (Mktg) and install drain, flow bypass valve, differential pressure sensor and future boiler connections on the Cellar as per plans.
On file for this project
9 documents · 2 drawing sheets
Installation of new emergency generator, wiring, piping and regulator vents on the 20th Floor (CO)/ M1 (Mktg) and emergency generator gas booster and gas meter and associated piping and regulator vents on the Cellar Level as per plans.
On file for this project
9 documents
Installation and use of power operated hoisting equipment, specifically a 5-ton-push-trolley between the Ground floor and Cellar level.
On file for this project
2 documents
Latest 3 of 4 filings on this floor.
Site & exteriorDouglaston DevelopmentUnder Construction4 filings · 20 docs
ArchitectureCivilElectricalEquipmentGeneralLandscapeMechanicalPlumbingStructural
Issued Permit Scope
Construction Fence · Earth Work · Foundation · Protection and Mechanical Methods · Sidewalk Shed · Supported Scaffold · Support of Excavation
INSTALLATION OF TEMPORARY SYSTEM STAIRS TOWER AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. THE SYSTEM STAIRS TOWER FROM THE FIRST FLOOR TO THE EIGHTH FLOOR AT EAST 82ND STREET ELEVATION
On file for this project
36 documents · 12 drawing sheets
INSTALLATION OF A TEMPORARY HOIST COMPLEX AS PER PLANS DURING NB CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. HOIST COMPLEX INSTALLED IN ACCORDANCE WITH 2022 NYC BUILDING CODE, CHAPTER 33
On file for this project
6 documents · 12 drawing sheets
Filing for support of excavation work to include installation of soldier piles within the sidewalk to facilitate excavation for a temporary crane pad as per plans filed herewith.
On file for this project
3 documents · 4 drawing sheets