← Back
Over six families without stores
1449 BRYANT AVENUE
BRONX · BIN 2010740
💬 Discuss this project
1931Year Built
3Stories
C1Building Class
R7-1Zoning
4,000 sfGross Floor Area
10Units
Rent Stabilized3 Open Violations ▸
Over six families without stores · Owner of record: 1447 SZ LLC · 2,000 sf lot · 2 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingFire ProtectionGeneralOther
Floor 321p · 1 filing · 20 docs
Floor 223p · 1 filing · 20 docs
Floor 120p · 1 filing · 20 docs
Basement22p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
WESTORCHARD MANAGEMENT1607/08/2026
1447 SZ LLC203/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
03/18/2025$750K—Private party → 1447 SZ LLC$188/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ADB ASSOCIATES1003/11/2026
VASILIOS ARTEMIOU PE109/13/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
EXPRESS FILING INC2003/21/2026
NYC DESIGN FILE103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
H BUILDERS NYC LLCGeneral Contractor607/08/2026
PRIME PIPING & HEATING INFire Protection107/08/2026
PRIME PIPING & HEATING INPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF SERVICES CORP56161303/11/2026
SHAHRISH SHUVO ENGINEERIN8524112/05/2025
Building Lifecycle
All (85)Filed (11)Permit Issued (6)Signed Off (4)Violation (25)Inspection (9)Special Inspection (30)
03/24/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/12/2026
Special inspection requirement — Fire-Resistance Rated Construction
FAHAD FATEH
03/12/2026
Special inspection requirement — Fenestration areas
FAHAD FATEH
03/12/2026
Special inspection requirement — Lighting in dwelling units
FAHAD FATEH
03/12/2026
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
03/12/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
03/12/2026
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
FAHAD FATEH
03/12/2026
Special inspection requirement — Fenestration air leakage
FAHAD FATEH
03/12/2026
Special inspection requirement — Insulation placement and R values
FAHAD FATEH
03/12/2026
Special inspection requirement — Maintenance information
FAHAD FATEH
03/12/2026
Special inspection requirement — Air barrier - visual inspection
FAHAD FATEH
03/12/2026
Special inspection requirement — Exterior lighting power
FAHAD FATEH
03/12/2026
Special inspection requirement — Interior lighting power
FAHAD FATEH
03/12/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
FAHAD FATEH
03/12/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
FAHAD FATEH
03/12/2026
Special inspection requirement — Permanent certificate
FAHAD FATEH
03/12/2026
Special inspection requirement — Metering
FAHAD FATEH
03/12/2026
Special inspection requirement — Lighting controls
FAHAD FATEH
03/11/2026
Filed — Alteration CO
Existing 3 story and basement, 3-Family to be converted into a 10-unit building
X01063141-P6
03/11/2026
Special inspection requirement — Permanent certificate
FAHAD FATEH
03/11/2026
Special inspection requirement — Interior lighting power
FAHAD FATEH
03/11/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
FAHAD FATEH
03/11/2026
Special inspection requirement — Exterior lighting power
FAHAD FATEH
03/11/2026
Special inspection requirement — Air barrier - visual inspection
FAHAD FATEH
03/11/2026
Special inspection requirement — Metering
FAHAD FATEH
03/11/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
FAHAD FATEH
03/11/2026
Special inspection requirement — Fenestration air leakage
FAHAD FATEH
03/11/2026
Special inspection requirement — Fire-Resistance Rated Construction
FAHAD FATEH
03/11/2026
Special inspection requirement — Fenestration areas
FAHAD FATEH
03/11/2026
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
03/11/2026
Special inspection requirement — Lighting in dwelling units
FAHAD FATEH
03/11/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
01/05/2026
Signed off — Alteration CO
Existing 3 story and basement, 3-Family to be converted into a 10-unit building
X01063141-S4
01/02/2026
Permit issued — Structural
X01063141-S4-ST
12/05/2025
Filed — Alteration CO
Existing 3 story and basement, 3-Family to be converted into a 10-unit building
X01063141-S4
09/02/2025
Signed off — Alteration CO
Existing 3 story and basement, 3-Family to be converted into a 10-unit building
X01063141-S2
07/21/2025
Filed — Alteration CO
Existing 3 story and basement, 3-Family to be converted into a 10-unit building
X01063141-P5
07/09/2025
Signed off — Alteration CO
Existing 3 story and basement, 3-Family to be converted into a 10-unit building
X01063141-S3
07/03/2025
Signed off — Alteration CO
Existing 3 story and basement, 3-Family to be converted into a 10-unit building
X01063141-S1
06/30/2025
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
06/30/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
06/19/2025
Filed — Alteration CO
Existing 3 story and basement, 3-Family to be converted into a 10-unit building
X01063141-P4
06/13/2025
Filed — Alteration CO
Existing 3 story and basement, 3-Family to be converted into a 10-unit building
X01063141-P3
06/11/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/09/2025
Filed — Alteration CO
Existing 3 story and basement, 3-Family to be converted into a 10-unit building
X01063141-P2
06/06/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
06/04/2025
Violation issued (HPD, closed)
A
06/04/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
04/29/2025
Permit issued — General Construction
X01063141-I1-GC
04/04/2025
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
04/04/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/04/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
04/03/2025
Filed — Alteration CO
Existing 3 story and basement, 3-Family to be converted into a 10-unit building
X01063141-P1
03/26/2025
Permit issued — Sprinklers
X01063141-S3-EW-SP
03/26/2025
Permit issued — General Construction
X01063141-I1-GC
03/26/2025
Permit issued — Mechanical Systems
X01063141-S1-MS
03/25/2025
Permit issued — Plumbing
X01063141-S2-PL
11/22/2024
Violation issued (HPD, closed)
I
09/13/2024
Filed — Alteration CO
Existing 3 story and basement, 3-Family to be converted into a 10-unit building
X01063141-S3
09/09/2024
Filed — Alteration CO
Existing 3 story and basement, 3-Family to be converted into a 10-unit building
X01063141-S2
Latest 60 of 85 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralSigned-offH BUILDERS NYC LLC01/02/2026
DOB NOWGeneral ConstructionPermit IssuedH BUILDERS NYC LLC04/29/2025
DOB NOWSprinklersSigned-offA M B MECHANICAL INC03/26/2025
DOB NOWGeneral ConstructionPermit IssuedH BUILDERS NYC LLC03/26/2025
DOB NOWMechanical SystemsSigned-offH BUILDERS NYC LLC03/26/2025
DOB NOWPlumbingSigned-offPRIME PIPING & HEATING IN03/25/2025
1 project · most recent 03/11/2026
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
03/11/2026Signed-offH BUILDERS NYC LLCHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Daikin RXF12BVJU9 13,500 BTU · Heat Pump Outdoor ×9
3MXM24AVJU9 24,000 BTU · Heat Pump Outdoor ×1
Ventilation
Nutone AEN110 110 CFM · Exhaust Fan ×10
QTXEN150 150 CFM · Kitchen Exhaust ×10
1 project · most recent 03/11/2026
Sprinkler System
FiledStatusContractorScope
03/11/2026Signed-offPRIME PIPING & HEATING INSprinkler System
1 project · most recent 03/11/2026
Storm Water/Sanitary
FiledStatusContractorScope
03/11/2026Signed-offPRIME PIPING & HEATING INStorm, Water/Sanitary
2 projects · most recent 08/18/2026
General Wiring
FiledStatusContractorScope
08/18/2026Permit IssuedPOWER DIRECT ELECTRIC INCGeneral Wiring
03/19/2025CompletePOWER DIRECT ELECTRIC INCGeneral Wiring
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
03/24/2026Pass-Final CND-Occupancy InspectionPassView ↗
06/30/2025Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
06/30/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/11/2025Pass-Final CND-Occupancy InspectionPassView ↗
06/06/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
06/04/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
04/04/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
04/04/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/04/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 92
DateRequirementInspectorRole
03/12/2026Insulation placement and R valuesFAHAD FATEHenergy_progress
03/12/2026Fenestration areasFAHAD FATEHenergy_progress
03/12/2026Lighting controlsFAHAD FATEHenergy_progress
03/12/2026Fenestration air leakageFAHAD FATEHenergy_progress
03/12/2026MeteringFAHAD FATEHenergy_progress
03/12/2026Permanent certificateFAHAD FATEHenergy_progress
03/12/2026Fenestration and door U-factor and product ratingsFAHAD FATEHenergy_progress
03/12/2026Exterior lighting powerFAHAD FATEHenergy_progress
03/12/2026Maintenance informationFAHAD FATEHenergy_progress
03/12/2026Lighting in dwelling unitsFAHAD FATEHenergy_progress
03/12/2026Air barrier - visual inspectionFAHAD FATEHenergy_progress
03/12/2026Interior lighting powerFAHAD FATEHenergy_progress
03/12/2026Fire-Resistance Rated ConstructionFAHAD FATEHprogress
03/12/2026Energy Code Compliance InspectionsFAHAD FATEHprogress
03/12/2026Structural Stability – Alterations of existing buildingsFAHAD FATEHspecial
03/12/2026Exterior Insulation and Finish Systems (EIFS)FAHAD FATEHspecial
03/12/2026Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
03/11/2026Exterior Insulation and Finish Systems (EIFS)FAHAD FATEHspecial
03/11/2026Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
03/11/2026Structural Stability – Alterations of existing buildingsFAHAD FATEHspecial
03/11/2026Energy Code Compliance InspectionsFAHAD FATEHprogress
03/11/2026Fire-Resistance Rated ConstructionFAHAD FATEHprogress
03/11/2026Air barrier - visual inspectionFAHAD FATEHenergy_progress
03/11/2026Interior lighting powerFAHAD FATEHenergy_progress
03/11/2026Insulation placement and R valuesFAHAD FATEHenergy_progress
Latest 25 of 92.
▾Documents — 79 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch11
08/17/2026X01063141-S3Request digital key ↗
08/17/2026X01063141-I1Request digital key ↗
08/17/2026X01063141-P3Request digital key ↗
Showing 3 of 11 on file for this type
▸Seals & Professional Certifications45
▸DOB NOWProgress Inspector Seal & Signature18
09/23/2026X01063141-P4Open ↗
09/01/2026X01063141-S4Open ↗
08/27/2026X01063141-P6Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature16
09/23/2026X01063141-P4Open ↗
09/01/2026X01063141-S4Open ↗
08/27/2026X01063141-P6Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature11
08/17/2026X01063141-P2Open ↗
08/17/2026X01063141-I1Open ↗
08/17/2026X01063141-P4Open ↗
Showing 3 of 11 on file for this type
▸Safety & Tenant Protection7
▸DOB NOWStreet Tree Checklist4
08/17/2026X01063141-I1Open ↗
08/17/2026X01063141-P1Open ↗
08/17/2026X01063141-P6Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWStreet Tree Sign Off1
08/13/2026X01063141-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026X01063141-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026X01063141-I1Open ↗
▸Environmental & Asbestos11
▸DOB NOWDEP ACP-5: Asbestos Assessment Report11
08/17/2026X01063141-P1Open ↗
08/17/2026X01063141-P3Open ↗
08/17/2026X01063141-S3Open ↗
Showing 3 of 11 on file for this type
▸Other Documents5
▸DOB NOWProperty Ownership Certification4
08/17/2026X01063141-I1Open ↗
08/17/2026X01063141-P1Open ↗
08/17/2026X01063141-P6Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWFinal Survey1
08/13/2026X01063141-I1Open ↗