← Back
Three families
144A SUMPTER STREET
BROOKLYN · BIN 3342452
💬 Discuss this project
1910Year Built
3Stories
C0Building Class
R6BZoning
2,250 sfGross Floor Area
3Units
Rent Stabilized6 Open Violations ▸FDNY Report ↗
Three families · Owner of record: PSA LUXURY TOWNHOUSE LLC · 1,875 sf lot · 1.2 FAR built · Flood zone X
Locations of Work
ArchitectureMechanical
Roof1p · 1 filing · 8 docs
Floor 32p · 1 filing · 18 docs
Floor 2
Floor 11p · 1 filing · 18 docs
Cellar1p · 1 filing · 18 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
HPD707/08/2026
PSA LUXURY TOWNHOUSE LLC103/22/2026
FEFE69 144 HOLDING GROUP203/22/2026
FEFE60 144 HOLDING GROUP103/22/2026
SUMPTER 69 HOLDING CORP103/22/2026
HOUSING PRESERVATION DEVELOPME203/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
11/22/2021$875K—SUMPTER 69 HOLDING CORP. → PSA LUXURY TOWNHOUSE LLC$389/sf building
05/22/2020$80K—Private party → SUMPTER 69 HOLDING CORP$36/sf building
08/03/2018$45K—Private party → FEFE69 144 HOLDING GROUP CORP.$20/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
L & C ASSOCIATES702/14/2023
STRUCTURAL ENGINEERING INTEGRATED106/23/2020
KZ ENGINEERING, P.C105/11/2020
SOUTH BAY ENGINEERING PLLC103/10/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
L&C ASSOCIATES503/21/2026
2020 GROUP SERVICE203/21/2026
EXPEDITE DEM203/21/2026
ATLANTIC BUILDING SUPPLY INC.203/21/2026
SYNERGY BUILDING CONSULTANTS103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
GOLDEN GATE BAPAZ CONSTRUGeneral Contractor807/08/2026
SUPERB CONSTRUCTION MGTGeneral Contractor303/21/2026
ARSENAL SCAFFOLD INCGeneral Contractor203/21/2026
G.N. CONSTRUCTION INCGeneral Contractor107/08/2026
NASH ELECTRIC SERVICES INElectrical103/22/2026
STATEWIDE DEMOLITION CORP.General Contractor107/08/2026
VMC PLUMBING & HEATING INPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CL ENGINEERING P.C.6781402/14/2023
STRUCT. ENGINEERING INTEG4174106/23/2020
Building Lifecycle
All (131)Filed (10)Permit Issued (9)Signed Off (6)Violation (60)Inspection (4)Objection (14)Special Inspection (28)
05/06/2026
Violation issued (HPD, open)
A
11/20/2025
Violation issued (HPD, open)
I
06/11/2025
Violation issued (HPD, open)
A
03/27/2023
Violation issued (HPD, closed)
A
02/21/2023
Signed off — Alteration
MECHANICAL WORKS, AS PER PLANS. RECTIFY ECB VIOLATION # 39056455M. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY IN THIS APPLICATION.
B00688613-I1
02/21/2023
Special inspection requirement — Mechanical Systems
CHRISTIAN LOZADA
02/21/2023
Special inspection requirement — Heating Systems
CHRISTIAN LOZADA
02/21/2023
Special inspection requirement — Energy Code Compliance Inspections
CHI WAI CHUNG
02/21/2023
Special inspection requirement — Final
CHRISTIAN LOZADA
02/21/2023
Special inspection requirement — HVAC-R and service water heating equipment
CHI WAI CHUNG
02/21/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
CHI WAI CHUNG
02/21/2023
Special inspection requirement — HVAC-R and service water heating system controls
CHI WAI CHUNG
02/21/2023
Special inspection requirement — Shutoff dampers
CHI WAI CHUNG
02/17/2023
Objection resolved — Addressed
02/17/2023
Objection resolved — Addressed
02/17/2023
Objection resolved — Addressed
02/17/2023
Objection resolved — Addressed
02/16/2023
Objection raised — Energy
02/16/2023
Objection raised — Mechanical
02/16/2023
Objection raised — Fire_Protection
02/16/2023
Objection raised — Scope
02/14/2023
Filed — Alteration
MECHANICAL WORKS, AS PER PLANS. RECTIFY ECB VIOLATION # 39056455M. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY IN THIS APPLICATION.
B00688613-P2
01/31/2023
Signed off — Alteration
EXISTING THREE STORY. CELLAR TO 3RD FLOOR BUILDING. PLUMBING WORK. AS PER PLANS. RECTIFY ECB VIOLATION # 39056455M. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY IN THIS APPLICATION.
B00688622-I1
01/10/2023
Signed off — Alteration
PROVIDE TEMPORARY SHORING THRUOUT THE BUILDING AS PER UPDATED PLAN
B00359452-I1
01/04/2023
Special inspection requirement — Energy Code Compliance Inspections
CHI WAI CHUNG
01/04/2023
Special inspection requirement — HVAC-R and service water heating system controls
CHI WAI CHUNG
01/04/2023
Special inspection requirement — HVAC-R and service water heating equipment
CHI WAI CHUNG
01/04/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
CHI WAI CHUNG
12/28/2022
Objection resolved — Addressed
12/05/2022
Objection raised — Scope
11/28/2022
Filed — Alteration
EXISTING THREE STORY. CELLAR TO 3RD FLOOR BUILDING. PLUMBING WORK. AS PER PLANS. RECTIFY ECB VIOLATION # 39056455M. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY IN THIS APPLICATION.
B00688622-P1
11/28/2022
Special inspection requirement — Energy Code Compliance Inspections
CHI WAI CHUNG
11/28/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
CHI WAI CHUNG
11/28/2022
Special inspection requirement — HVAC-R and service water heating system controls
CHI WAI CHUNG
11/28/2022
Special inspection requirement — HVAC-R and service water heating equipment
CHI WAI CHUNG
11/17/2022
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
11/14/2022
Violation issued (HPD, closed)
I
11/08/2022
Signed off — Alteration
B00327987-I1
11/07/2022
Signed off — Alteration
B00269320-I1
08/15/2022
Violation issued (ECB, closed)
Construction
07/28/2022
Violation issued (ECB, closed)
Construction
07/08/2022
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
07/08/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/08/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
06/14/2022
Objection resolved — Addressed
06/02/2022
Objection raised — Zoning
06/01/2022
Filed — Alteration
MECHANICAL WORKS, AS PER PLANS. RECTIFY ECB VIOLATION # 39056455M. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY IN THIS APPLICATION.
B00688613-P1
06/01/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
CHI WAI CHUNG
06/01/2022
Special inspection requirement — Final
CHRISTIAN LOZADA
06/01/2022
Special inspection requirement — HVAC-R and service water heating system controls
CHI WAI CHUNG
06/01/2022
Special inspection requirement — Shutoff dampers
CHI WAI CHUNG
06/01/2022
Special inspection requirement — HVAC-R and service water heating equipment
CHI WAI CHUNG
06/01/2022
Special inspection requirement — Heating Systems
CHRISTIAN LOZADA
06/01/2022
Special inspection requirement — Mechanical Systems
CHRISTIAN LOZADA
06/01/2022
Special inspection requirement — Energy Code Compliance Inspections
CHI WAI CHUNG
04/20/2022
Permit issued — Structural
B00359452-I1-ST
04/07/2022
Permit issued — Mechanical Systems
B00688613-I1-MS
04/05/2022
Permit issued — Plumbing
B00688622-I1-PL
03/02/2022
Violation issued (HPD, closed)
I
03/02/2022
Violation issued (HPD, closed)
A
Latest 60 of 131 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralSigned-offGOLDEN GATE BAPAZ CONSTRU04/20/2022
DOB NOWMechanical SystemsSigned-offGOLDEN GATE BAPAZ CONSTRU04/07/2022
DOB NOWPlumbingSigned-offM. SPINELLI PLB & HTG INC04/05/2022
DOB NOWConstruction FenceSigned-offGOLDEN GATE BAPAZ CONSTRU01/08/2022
DOB NOWConstruction FenceSigned-offGOLDEN GATE BAPAZ CONSTRU01/06/2022
DOB NOWStructuralSigned-offSUPERB CONSTRUCTION MGT06/19/2020
DOB NOWSidewalk ShedSigned-offARSENAL SCAFFOLD INC05/12/2020
DOB NOWConstruction FenceSigned-offSTATEWIDE DEMOLITION CORP.03/13/2020
DOB NOWConstruction FenceSigned-offEMPIRE CONSTRUCTION ASSOC11/25/2019
BISOTISSUEDGOLDEN GATE BAPAZ CONSTRU01/20/2022
BISOTISSUEDGOLDEN GATE BAPAZ CONSTRU12/08/2021
BISOTISSUEDMORELL BUILDERS INC12/08/2021
BISOTISSUEDSUPERB CONSTRUCTION MGT02/25/2021
BISOTISSUEDSUPERB CONSTRUCTION MGT09/02/2020
BISEQISSUEDSTATEWIDE DEMOLITION CORP.06/18/2020
BIS—ISSUEDSTATEWIDE DEMOLITION CORP.06/18/2020
BISOTISSUEDSTATEWIDE DEMOLITION CORP.06/09/2020
2 projects · most recent 01/11/2022
General Wiring
FiledStatusContractorScope
01/11/2022CompleteROYAL ELEC'L CONTR'G CORPGeneral Wiring
06/10/2020CompleteNASH ELECTRIC SERVICES IN—
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
11/17/2022Pass-Final General Construction Non-Directive 14PassView ↗
07/08/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
07/08/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/08/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 28
DateRequirementInspectorRole
02/21/2023Mechanical SystemsCHRISTIAN LOZADAspecial
02/21/2023Heating SystemsCHRISTIAN LOZADAspecial
02/21/2023Energy Code Compliance InspectionsCHI WAI CHUNGprogress
02/21/2023FinalCHRISTIAN LOZADAprogress
02/21/2023HVAC-R and service water heating equipmentCHI WAI CHUNGenergy_progress
02/21/2023HVAC-R and service water piping design and insulationCHI WAI CHUNGenergy_progress
02/21/2023HVAC-R and service water heating system controlsCHI WAI CHUNGenergy_progress
02/21/2023Shutoff dampersCHI WAI CHUNGenergy_progress
01/04/2023Energy Code Compliance InspectionsCHI WAI CHUNGprogress
01/04/2023HVAC-R and service water heating system controlsCHI WAI CHUNGenergy_progress
01/04/2023HVAC-R and service water heating equipmentCHI WAI CHUNGenergy_progress
01/04/2023HVAC-R and service water piping design and insulationCHI WAI CHUNGenergy_progress
11/28/2022Energy Code Compliance InspectionsCHI WAI CHUNGprogress
11/28/2022HVAC-R and service water piping design and insulationCHI WAI CHUNGenergy_progress
11/28/2022HVAC-R and service water heating system controlsCHI WAI CHUNGenergy_progress
11/28/2022HVAC-R and service water heating equipmentCHI WAI CHUNGenergy_progress
06/01/2022HVAC-R and service water piping design and insulationCHI WAI CHUNGenergy_progress
06/01/2022FinalCHRISTIAN LOZADAprogress
06/01/2022HVAC-R and service water heating system controlsCHI WAI CHUNGenergy_progress
06/01/2022Shutoff dampersCHI WAI CHUNGenergy_progress
06/01/2022HVAC-R and service water heating equipmentCHI WAI CHUNGenergy_progress
06/01/2022Heating SystemsCHRISTIAN LOZADAspecial
06/01/2022Mechanical SystemsCHRISTIAN LOZADAspecial
06/01/2022Energy Code Compliance InspectionsCHI WAI CHUNGprogress
06/26/2020Structural Stability – Alterations of existing buildingsCHRISTIAN LOZADAspecial
Latest 25 of 28.
▾Documents — 80 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch5
08/31/2026B00688613-I1Request digital key ↗
08/15/2026B00688622-I1Request digital key ↗
08/15/2026B00688613-P1Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Structural2
09/02/2026B00359452-I1Request digital key ↗
08/15/2026B00359452-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence2
09/02/2026B00269320-I1Request digital key ↗
09/02/2026B00327987-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/02/2026B00346538-I1Request digital key ↗
▸Applications & Permits17
▸BISPLAN / WORK APPROVAL APPLICATION14
12/28/2022340715818Open ↗
12/22/2022340715818Open ↗
12/20/2022340715818Open ↗
Showing 3 of 14 on file for this type
▸BISWORK PERMIT APPLICATION3
12/10/2021340715818Open ↗
10/08/2020340715818Open ↗
06/09/2020340715818Open ↗
▸Seals & Professional Certifications29
▸DOB NOWProgress Inspector Seal & Signature12
09/01/2026B00688622-I1Open ↗
09/01/2026B00688622-I1Open ↗
08/30/2026B00688613-P1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature10
08/31/2026B00688622-P1Open ↗
08/31/2026B00688622-I1Open ↗
08/13/2026B00359452-P1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
08/30/2026B00688613-P1Open ↗
08/26/2026B00359452-P1Open ↗
08/26/2026B00688613-I1Open ↗
Showing 3 of 4 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
03/11/2020340715818Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
03/11/2020340715818Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
03/11/2020340715818Open ↗
▸Safety & Tenant Protection1
▸DOB NOWTenant Protection Plan1
08/13/2026B00269320-I1Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/15/2026B00688622-I1Open ↗
08/14/2026B00688622-P1Open ↗
08/13/2026B00688613-P2Open ↗
Showing 3 of 5 on file for this type
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis2
08/15/2026B00688622-I1Open ↗
08/13/2026B00688613-I1Open ↗
▸Inspections & Test Reports4
▸BISTECHNICAL REPORT: RESPONSIBILITY2
06/09/2020340715818Open ↗
03/11/2020340715818Open ↗
▸BISSTRUCTURAL STABILITY - ALTERATIONS OF EXISTING BUILDINGS2
11/15/2022340715818Open ↗
11/15/2022340715818Open ↗
▸Approvals, Objections & Sign-offs3
▸BISFINAL2
11/15/2022340715818Open ↗
11/15/2022340715818Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
01/04/2023340715818Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT1
03/11/2020340715818Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
12/29/2022340715818Open ↗
▸Filing & Intake Forms6
▸BISADDITIONAL INFORMATION3
12/28/2022340715818Open ↗
04/13/2022340715818Open ↗
08/12/2020340715818Open ↗
▸BISBOROUGH INTAKE FORM2
12/10/2021340715818Open ↗
08/16/2021340715818Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
03/11/2020340715818Open ↗
▸Other Documents1
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION1
04/13/2022340715818Open ↗