DOB06/23/2024Failure to submit an eer per ad. Code sec. 28-308.4 - multiple years (2023)
ECB07/08/2026Failure to maintain building in code-compliant manner. Illumination for exits, exit discharges and public corridors per bc 1006.1; 27-381. At the time of inspection observed and noted at 1ST floor cafeteria fivNothing owed — awaiting certificate of correction
ECB07/08/202628-301.1. Reissue: 35724785K. Date of issue: 09/24/2025. Unlawful display of artwork in corridors and ceiling install/hanging greater than 20% per FDNY 2008 code fc 803.3.2. Remedy: comply notice of violation oNothing owed — awaiting certificate of correction
ECB07/08/2026Reissue: 35724783R. Date of issue: 09/24/2025. Failure to maintain building in code-compliant manner. At the time of inspection observed andnoted at 3RD floor gym wall with vertical cracks. Including one from fNothing owed — awaiting certificate of correction
ECB10/23/2025Reissue ECB #35692561H. Failure to maintain building in code-compliantmanner. Noted: at(3RD fl) gym wall with vertical cracks. Remedy: repair and/or replace.Nothing owed — awaiting certificate of correction
ECB10/23/2025Failure to maintain building in code-compliant manner. Noted: at everyfloor throughout hallways ceilings installed/hanging non fire retardent/decorations. Remedy: comply with code.Nothing owed — awaiting certificate of correction
ECB10/24/2024Reissue #35663493M. Failure to maintain building in code-compliant manner. Noted: 3RD floor gym, east wall has several vertical cracks, including one from floor to ceiling with 1/2" sepration. Remedy: repair anNothing owed — awaiting certificate of correction
ECB08/14/2023Reissue 35655431R failure to maintain building in code-compliant manner 3RD floor gym east side wall near window vertical cracks from floor to ceiling. Remedy: repair and/or replaceNothing owed — awaiting certificate of correction
ECB06/07/2022Reissue #35582239M failure to maintain building in code compliant manner.noted:observed at 3RD fl gymnasium east side wall near middle window vertical cracks from floor to ceiling cracks aprox 1/2 inch wide 15FNothing owed — awaiting certificate of correction
ECB06/18/2021Reissue #35495206K failure to maintain bldg in code-compliant manner observed.at 3RD fl gym east side near middle window vertical crack from fl to ceiling,crack width Y2" through brick wall.remedy:repair &/orNothing owed — awaiting certificate of correction
ECB05/26/2020Reissue#35414959H failure to maintain bldg in code compliant manner. Noted: at 3RD fl gym,east side near middle window,floor to ceiling 1/2"crack(vertical)through brickwall. Remedy: make necessary repairs.Nothing owed — awaiting certificate of correction
ECB06/13/2019Reissue #35341652Z failure to maintain building in code compliant manner 3RD floor gym east side wall cracks all over throught bricks running up wall.repair and/or replaceNothing owed — awaiting certificate of correction
ECB06/22/2018Reissue#35272412N failure to maintain bldg in code compliant manner 3RD fl gymnasium east side near middle window floor to ceiling 1/2 inch crack through brick wall. Remedy: repair & or replace.Nothing owed — awaiting certificate of correction
ECB07/12/2017Failure to maintain bldg in code compliant manner. 3 floor gymnasium east side near middle window floor to ceiling 1/2INCH crack through brick wall. Remedy: repair/replace.Nothing owed — awaiting certificate of correction