145-10 34TH AVENUE
QUEENS · BIN 4113033
💬 Discuss this project
1955Year Built
3Stories
C0Building Class
R7-1Zoning
2,280 sfGross Floor Area
3Units
Three families · 2,000 sf lot · 1.14 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbingFire Protection
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Roof2-Family to 3-Family Conversion1p · 1 filing · 20 docs
Floor 32-Family to 3-Family Conversion29p · 1 filing · 20 docs
Floor 22-Family to 3-Family Conversion27p · 1 filing · 20 docs
Floor 12-Family to 3-Family Conversion27p · 1 filing · 20 docs
CellarCellar renovation with plumbing workUnder Construction30p · 3 filings · 20 docs
Site & exterior2-Family to 3-Family Conversion14p · 1 filing · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/26/2024$1.2M—— → —$539/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Farhad Bassiri-Tehrani206/11/2026
Mehdi Ghazi, P.E305/30/2025
Mei Architect204/09/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Mei Architect603/21/2026
Ibuild Consulting403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Kale ConstructionGeneral Contractor107/08/2026
L&L Construction DevelopmentGeneral Contractor107/08/2026
Dynamic Plumbing & SprinklerFire Protection107/08/2026
John Fitzgerald Plumbing & HeatingPlumbing106/28/2026
Rock E Small Plumbing & HeatingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Bassiri8394106/11/2026
Mehdi Ghazi, P.E7129505/30/2025
Building Lifecycle
All (69)Filed (7)Permit Issued (5)Signed Off (3)Inspection (10)Objection (14)Special Inspection (30)
07/27/2026
Signed off — Alteration
RENOVATION OF EXISTING CELLAR WITH GENERAL CONSTRUCTION: NEW 2-PCRESTROOM IN CELLAR AS PER PLAN; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Q01414975-I1
07/27/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
07/27/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
07/24/2026
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
07/10/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/10/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
06/22/2026
Permit issued — Plumbing
Q01414981-I1-PL
06/17/2026
Permit issued — General Construction
Q01414975-I1-GC
06/11/2026
Filed — Alteration
RENOVATION OF EXISTING CELLAR WITH GENERAL CONSTRUCTION: NEW 2-PCRESTROOM IN CELLAR AS PER PLAN; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Q01414975-I1
06/11/2026
Filed — Alteration
RENOVATION OF EXISTING CELLAR WITH PLUMBING WORK: NEW 2-PC RESTROOM IN CELLAR AS PER PLAN; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Q01414981-I1
06/11/2026
Special inspection requirement — Fire-Resistance Rated Construction
FARHAD BASSIRI-TEHRANI
06/11/2026
Special inspection requirement — Energy Code Compliance Inspections
FARHAD BASSIRI-TEHRANI
06/11/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
FARHAD BASSIRI-TEHRANI
06/08/2026
Signed off — Alteration CO
INSTALLATION OF PLUMBING AND SPRINKLER WORK AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q01086942-I1
07/01/2025
Signed off — Alteration CO
INSTALLATION OF PLUMBING AND SPRINKLER WORK AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q01086942-S1
06/18/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/05/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
MEHDI GHAZI
06/05/2025
Special inspection requirement — HVAC-R and service water heating system controls
MEHDI GHAZI
06/05/2025
Special inspection requirement — HVAC-R and service water heating equipment
MEHDI GHAZI
06/05/2025
Special inspection requirement — Maintenance information
MEHDI GHAZI
06/05/2025
Special inspection requirement — Energy Code Compliance Inspections
MEHDI GHAZI
06/05/2025
Special inspection requirement — Sprinkler Systems
MEHDI GHAZI
06/05/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
MEHDI GHAZI
05/30/2025
Filed — Alteration CO
INSTALLATION OF PLUMBING AND SPRINKLER WORK AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q01086942-P3
05/29/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
05/27/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
04/24/2025
Special inspection requirement — Metering
MEHDI GHAZI
04/24/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
MEHDI GHAZI
04/24/2025
Special inspection requirement — Energy Code Compliance Inspections
MEHDI GHAZI
04/24/2025
Special inspection requirement — Fire-Resistance Rated Construction
MEHDI GHAZI
04/24/2025
Special inspection requirement — Fenestration air leakage
MEHDI GHAZI
04/24/2025
Special inspection requirement — Fenestration areas
MEHDI GHAZI
04/24/2025
Special inspection requirement — Air barrier - visual inspection
MEHDI GHAZI
04/24/2025
Special inspection requirement — Insulation placement and R values
MEHDI GHAZI
04/24/2025
Special inspection requirement — Permanent certificate
MEHDI GHAZI
04/24/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
MEHDI GHAZI
04/24/2025
Special inspection requirement — Interior lighting power
MEHDI GHAZI
04/09/2025
Filed — Alteration CO
INSTALLATION OF PLUMBING AND SPRINKLER WORK AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q01086942-P2
04/09/2025
Filed — Alteration CO
INSTALLATION OF PLUMBING AND SPRINKLER WORK AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q01086942-P1
04/09/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
MEHDI GHAZI
04/09/2025
Special inspection requirement — Interior lighting power
MEHDI GHAZI
04/09/2025
Special inspection requirement — Metering
MEHDI GHAZI
04/09/2025
Special inspection requirement — Air barrier - visual inspection
MEHDI GHAZI
04/09/2025
Special inspection requirement — Fenestration areas
MEHDI GHAZI
04/09/2025
Special inspection requirement — Fenestration air leakage
MEHDI GHAZI
04/09/2025
Special inspection requirement — Insulation placement and R values
MEHDI GHAZI
04/09/2025
Special inspection requirement — Permanent certificate
MEHDI GHAZI
04/09/2025
Special inspection requirement — Fire-Resistance Rated Construction
MEHDI GHAZI
12/12/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
12/12/2024
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
11/13/2024
Permit issued — Plumbing
Q01086942-S1-EW-SP
11/08/2024
Permit issued — Sprinklers
Q01086942-S1-PL
10/31/2024
Filed — Alteration CO
INSTALLATION OF PLUMBING AND SPRINKLER WORK AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q01086942-S1
10/28/2024
Permit issued — General Construction
Q01086942-I1-GC
10/11/2024
Objection resolved — Addressed
10/11/2024
Objection resolved — Addressed
10/07/2024
Objection raised — Other
09/25/2024
Objection resolved — Addressed
09/25/2024
Objection resolved — Addressed
09/25/2024
Objection resolved — Addressed
Latest 60 of 69 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedJohn Fitzgerald Plumbing & Heating06/22/2026
DOB NOWGeneral ConstructionSigned-offKale Construction06/17/2026
DOB NOWSprinklersSigned-offCitywide Plumbing, Heating & Sprinkler11/13/2024
DOB NOWPlumbingSigned-offRock E Small Plumbing & Heating11/08/2024
DOB NOWGeneral ConstructionPermit IssuedL&L Construction Development10/28/2024
1 project · most recent 05/30/2025
Sprinkler System
FiledStatusContractorScope
05/30/2025Signed-offDynamic Plumbing & SprinklerSprinkler System
2 projects · most recent 06/11/2026
Water/Sanitary Gas Storm
FiledStatusContractorScope
06/11/2026Permit IssuedJohn Fitzgerald Plumbing & HeatingWater/Sanitary
05/30/2025Signed-offRock E Small Plumbing & HeatingGas, Storm, Water/Sanitary
1 project · most recent 03/31/2026
General Wiring
FiledStatusContractorScope
03/31/2026CompleteEric & NG ElectricalGeneral Wiring
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
07/27/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/27/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/24/2026Pass-Final General Construction Non-Directive 14PassView ↗
07/10/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/10/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
06/18/2025Pass-Final CND-Occupancy InspectionPassView ↗
05/29/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
05/27/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
12/12/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
12/12/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 39
DateRequirementInspectorRole
06/11/2026Fire-Resistance Rated ConstructionFARHAD BASSIRI-TEHRANIprogress
06/11/2026Energy Code Compliance InspectionsFARHAD BASSIRI-TEHRANIprogress
06/11/2026Fire-Resistant Penetrations and JointsFARHAD BASSIRI-TEHRANIspecial
06/05/2025HVAC-R and service water piping design and insulationMEHDI GHAZIenergy_progress
06/05/2025HVAC-R and service water heating system controlsMEHDI GHAZIenergy_progress
06/05/2025HVAC-R and service water heating equipmentMEHDI GHAZIenergy_progress
06/05/2025Maintenance informationMEHDI GHAZIenergy_progress
06/05/2025Energy Code Compliance InspectionsMEHDI GHAZIprogress
06/05/2025Sprinkler SystemsMEHDI GHAZIspecial
06/05/2025Fire-Resistant Penetrations and JointsMEHDI GHAZIspecial
04/24/2025MeteringMEHDI GHAZIenergy_progress
04/24/2025Fire-Resistant Penetrations and JointsMEHDI GHAZIspecial
04/24/2025Energy Code Compliance InspectionsMEHDI GHAZIprogress
04/24/2025Fire-Resistance Rated ConstructionMEHDI GHAZIprogress
04/24/2025Fenestration air leakageMEHDI GHAZIenergy_progress
04/24/2025Fenestration areasMEHDI GHAZIenergy_progress
04/24/2025Air barrier - visual inspectionMEHDI GHAZIenergy_progress
04/24/2025Insulation placement and R valuesMEHDI GHAZIenergy_progress
04/24/2025Permanent certificateMEHDI GHAZIenergy_progress
04/24/2025Fenestration and door U-factor and product ratingsMEHDI GHAZIenergy_progress
04/24/2025Interior lighting powerMEHDI GHAZIenergy_progress
04/09/2025Fenestration and door U-factor and product ratingsMEHDI GHAZIenergy_progress
04/09/2025Interior lighting powerMEHDI GHAZIenergy_progress
04/09/2025MeteringMEHDI GHAZIenergy_progress
04/09/2025Air barrier - visual inspectionMEHDI GHAZIenergy_progress
Latest 25 of 39.
▾Documents — 40 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/20/2026Q01086942-P2Request digital key ↗
08/20/2026Q01086942-S1Request digital key ↗
08/20/2026Q01086942-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸Zoning, Tax Lot & Property Records2
▸DOB NOWHouse Number Verification: TOPO Stamp2
08/13/2026Q01086942-I1Open ↗
08/13/2026Q01086942-P2Open ↗
▸Seals & Professional Certifications21
▸DOB NOWProgress Inspector Seal & Signature9
09/27/2026Q01086942-P1Open ↗
09/27/2026Q01086942-P1Open ↗
09/01/2026Q01414975-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/16/2026Q01414981-I1Open ↗
08/16/2026Q01414975-I1Open ↗
08/13/2026Q01086942-S1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/27/2026Q01086942-P1Open ↗
09/01/2026Q01414975-I1Open ↗
08/30/2026Q01086942-S1Open ↗
Showing 3 of 5 on file for this type
▸Safety & Tenant Protection2
▸DOB NOWStreet Tree Checklist2
08/13/2026Q01086942-I1Open ↗
08/13/2026Q01086942-P2Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/13/2026Q01086942-P2Open ↗
08/13/2026Q01086942-I1Open ↗
08/13/2026Q01086942-P3Open ↗
Showing 3 of 5 on file for this type
▸Other Documents3
▸DOB NOWProperty Ownership Certification2
08/13/2026Q01086942-P2Open ↗
08/13/2026Q01086942-I1Open ↗
▸DOB NOWFinal Survey1
08/20/2026Q01086942-I1Open ↗