← Back
BuildNYC
Public elementary, junior or senior high
P.S. 160 Walter Francis Bishop
145-14 GLASSBORO AVENUE · South Jamaica · BIN 4623946
💬 Discuss this project
1950Year Built
4Stories
W1Building Class
R4Zoning
129,584 sfGross Floor Area
1Units
LL97 Covered5 Active Violations 0 unresolved · 5 paperwork only ▸
Public elementary, junior or senior high · Owner of record: NYC Department of Education · 71,100 sf lot · 1.82 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentCivilGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofP.S. 16033p · 3 filings · 17 docs
Floor 4P.S. 16037p · 3 filings · 17 docs
Floor 3P.S. 16033p · 2 filings · 17 docs
Floor 2P.S. 16035p · 2 filings · 17 docs
Floor 1P.S. 16040p · 4 filings · 17 docs
CellarP.S. 16038p · 3 filings · 17 docs
Site & exteriorP.S. 16059p · 7 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC School Construction Authority8210/13/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JMV Associates1603/21/2026
A1 Expediting Service203/21/2026
Caso Associates2603/21/2026
JMG Consultants603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Citnalta ConstructionGeneral Contractor1307/08/2026
Citnalta ConstructionScaffold1306/27/2026
Rael Automatic Sprinkler CoFire Protection607/08/2026
ACS System AssociatesGeneral Contractor607/08/2026
Varsity Plumbing and HeatingPlumbing507/08/2026
PJP InstallersScaffold307/08/2026
Milad ContractingElectrical203/21/2026
Rael Automatic Sprinkler CoFire Protection206/28/2026
Stanco System Electrical ContElectrical203/21/2026
Maccarone PlumbingPlumbing107/08/2026
Olympic Plumbing & Heating ServicePlumbing107/08/2026
Kelly MasonryScaffold107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Universal Testing and Ins4001908/28/2026
Etrecte8116104/16/2025
Building Lifecycle
All (142)Filed (29)Permit Issued (40)Signed Off (7)Violation (2)Inspection (8)Objection (26)Special Inspection (30)
08/28/2026
Filed — Alteration
Manual wet combination sprinkler and standpipe system for new building at PS 160 Q
Q00662719-P5
07/09/2026
Signed off — Alteration
P.S. 160-Q: SOE (UTILITIES) AND SOE DETENTION TANKS FOR A NEW 4-STORY SCHOOL BUILDING.
Q08046649-I1
06/23/2026
Signed off — Alteration
P.S. 160-Q: PROPOSED TEMPORARY CONSTRUCTION FENCE FOR A NEW 4-STORY SCHOOL ADDITION. TEMPORARY FENCE APPLICATION FILED IN CONJUNCTION WITH NEW BUILDING APPLICATION AND ALL RELATED APPLICATIONS.
Q08001901-I1
12/18/2025
Permit issued — Plumbing
Q00682616-I1-PL
11/25/2025
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
10/06/2025
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
09/29/2025
Permit issued — Boiler Equipment
Q01280785-I1-BE
09/08/2025
Objection resolved — Addressed
09/06/2025
Objection raised — Other
09/04/2025
Filed — Alteration
Electric boilers installation
Q01280785-I1
09/03/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
NELSON LOPEZ
09/03/2025
Special inspection requirement — HVAC-R and service water heating equipment
NELSON LOPEZ
09/03/2025
Special inspection requirement — Post-installed Anchors
NELSON LOPEZ
09/03/2025
Special inspection requirement — Maintenance information
NELSON LOPEZ
09/03/2025
Special inspection requirement — HVAC-R and service water heating system controls
NELSON LOPEZ
09/02/2025
Special inspection requirement — Heating Systems
NELSON LOPEZ
07/25/2025
Objection resolved — Addressed
07/25/2025
Special inspection requirement — Public Assembly Emergency Lighting
NELSON LOPEZ
07/24/2025
Objection resolved — Addressed
07/24/2025
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
NELSON LOPEZ
07/24/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
NELSON LOPEZ
07/24/2025
Special inspection requirement — Maintenance information
NELSON LOPEZ
07/24/2025
Special inspection requirement — HVAC-R and service water heating equipment
NELSON LOPEZ
07/24/2025
Special inspection requirement — HVAC-R and service water heating system controls
NELSON LOPEZ
07/24/2025
Special inspection requirement — Final
NELSON LOPEZ
07/24/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
NELSON LOPEZ
07/24/2025
Special inspection requirement — Chimneys and vents
NELSON LOPEZ
07/24/2025
Special inspection requirement — Energy Code Compliance Inspections
NELSON LOPEZ
07/24/2025
Special inspection requirement — Post-installed Anchors
NELSON LOPEZ
07/24/2025
Special inspection requirement — Mechanical Systems
NELSON LOPEZ
07/24/2025
Special inspection requirement — Shutoff dampers
NELSON LOPEZ
07/23/2025
Filed — Alteration
Site work plumbing for new building PS 160 Q
Q00682616-P5
07/22/2025
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
07/22/2025
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
07/22/2025
Inspection — Pass-Final SD - Up to 9 Requested Floors
Pass
View inspection ↗
07/22/2025
Inspection — Pass-Final SP - Up to 9 Requested Floors
Pass
View inspection ↗
07/18/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
NELSON LOPEZ
07/17/2025
Filed — Alteration
Site work plumbing for new building PS 160 Q
Q00682616-P4
07/17/2025
Objection raised — Other
07/14/2025
Filed — No Work
Q00659905-P2
07/09/2025
Special inspection requirement — Sprinkler Systems
NELSON LOPEZ
07/09/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
NELSON LOPEZ
07/09/2025
Special inspection requirement — Standpipe Systems
NELSON LOPEZ
07/09/2025
Special inspection requirement — Post-installed Anchors
NELSON LOPEZ
07/07/2025
Filed — Alteration
Manual wet combination sprinkler and standpipe system for new building at PS 160 Q
Q00662719-P2
07/03/2025
Filed — Alteration
Site work plumbing for new building PS 160 Q
Q00682616-P3
07/03/2025
Special inspection requirement — HVAC-R and service water heating system controls
NELSON LOPEZ
07/03/2025
Special inspection requirement — Maintenance information
NELSON LOPEZ
07/03/2025
Special inspection requirement — HVAC-R and service water heating equipment
NELSON LOPEZ
07/03/2025
Special inspection requirement — Shutoff dampers
NELSON LOPEZ
07/03/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
NELSON LOPEZ
07/03/2025
Special inspection requirement — Final
NELSON LOPEZ
07/01/2025
Permit issued — Construction Fence
Q08001901-I1-FN
06/13/2025
Permit issued — Sprinklers
Q00662719-I1-EW-SD
06/13/2025
Permit issued — Sprinklers
Q00662719-I1-EW-SP
06/11/2025
Signed off — Alteration
Q00814930-I1
05/14/2025
Signed off — Alteration
Q00948695-I1
04/28/2025
Permit issued — Mechanical Systems
Q00682616-S1-MS
04/25/2025
Filed — No Work
Q00659905-P1
04/24/2025
Permit issued — Solar
Q01197626-I1-SL
Latest 60 of 142 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedVarsity Plumbing and Heating12/18/2025
DOB NOWBoiler EquipmentSigned-offOlympic Plumbing & Heating Service09/29/2025
DOB NOWConstruction FenceSigned-offCitnalta Construction07/01/2025
DOB NOWStandpipeSigned-offRael Automatic Sprinkler Co06/13/2025
DOB NOWSprinklersSigned-offRael Automatic Sprinkler Co06/13/2025
DOB NOWMechanical SystemsSigned-offACS System Associates04/28/2025
DOB NOWSolarPermit IssuedCitnalta Construction04/24/2025
DOB NOWSidewalk ShedSigned-offPJP Installers04/10/2025
DOB NOWStandpipeSigned-offRael Automatic Sprinkler Co03/10/2025
DOB NOWSprinklersSigned-offRael Automatic Sprinkler Co03/10/2025
DOB NOWMechanical SystemsSigned-offACS System Associates02/26/2025
DOB NOWConstruction FenceSigned-offCitnalta Construction12/31/2024
DOB NOWPlumbingPermit IssuedVarsity Plumbing and Heating12/20/2024
DOB NOWConstruction FenceSigned-offCitnalta Construction12/18/2024
DOB NOWProtection and Mechanical MethodsSigned-offCitnalta Construction11/22/2024
DOB NOWSupport of ExcavationSigned-offCitnalta Construction11/22/2024
DOB NOWCurb CutPermit IssuedCitnalta Construction11/20/2024
DOB NOWConstruction FenceSigned-offCitnalta Construction11/07/2024
DOB NOWBoiler EquipmentSigned-offVarsity Plumbing and Heating08/14/2024
DOB NOWSidewalk ShedSigned-offPJP Installers04/04/2024
DOB NOWStandpipeSigned-offRael Automatic Sprinkler Co03/18/2024
DOB NOWSprinklersSigned-offRael Automatic Sprinkler Co03/07/2024
DOB NOWMechanical SystemsSigned-offACS System Associates03/05/2024
DOB NOWPlumbingPermit IssuedMaccarone Plumbing02/12/2024
DOB NOWPlumbingPermit IssuedVarsity Plumbing and Heating12/29/2023
DOB NOWSupported ScaffoldSigned-offKelly Masonry11/22/2023
DOB NOWSupport of ExcavationSigned-offCitnalta Construction11/22/2023
DOB NOWSupport of ExcavationSigned-offCitnalta Construction11/22/2023
DOB NOWConstruction FenceSigned-offCitnalta Construction11/13/2023
DOB NOWProtection and Mechanical MethodsSigned-offCitnalta Construction11/09/2023
DOB NOWSupport of ExcavationSigned-offCitnalta Construction04/26/2023
DOB NOWSidewalk ShedSigned-offPJP Installers04/17/2023
DOB NOWFoundationSigned-offCitnalta Construction03/21/2023
DOB NOWStandpipeSigned-offRael Automatic Sprinkler Co03/07/2023
DOB NOWSprinklersSigned-offRael Automatic Sprinkler Co03/07/2023
DOB NOWMechanical SystemsSigned-offACS System Associates02/27/2023
DOB NOWPlumbingPermit IssuedVarsity Plumbing and Heating01/06/2023
DOB NOWSupport of ExcavationSigned-offCitnalta Construction11/22/2022
DOB NOWConstruction FenceSigned-offCitnalta Construction11/22/2022
DOB NOWConstruction FenceSigned-offCitnalta Construction10/13/2022
+ 12 more permits on file
1 project · most recent 07/23/2025
Air Conditioning Systems Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
07/23/2025Signed-offACS System AssociatesAir Conditioning Systems, Heating and Air Conditioning Systems, Ventilation Systems
Cooling
Aermec NYB1500000J900H 160 tons · Chiller ×30
Heat / Cool
Lg LSN363HLV3 37,000 BTU · Heat Pump Outdoor ×31
LSU363HLV3 37,000 BTU · Heat Pump Outdoor ×15
304KAKN0QS81/305KAHG04S21 37,000 BTU · Heat Pump Outdoor ×4
Annexair ERP-E-12-EW05-H-C-SW-SS 12,000 CFM · Fan Coil Indoor ×10
AHU-E-07-H-C-SS 6,000 CFM · Fan Coil Indoor ×5
Ventilation
Loren Cook 100SQN10D 100 SQN 250 CFM · Exhaust Fan ×15
101C15D 101 ACE 500 CFM · Exhaust Fan ×10
135C15D 135 ACE 1,560 CFM · Exhaust Fan ×10
150SC6B 150 ACSC 2,400 CFM · Exhaust Fan ×10
90C15DL 90 ACEL 140 CFM · Exhaust Fan ×10
100C15DL 100 ACEL 150 CFM · Exhaust Fan ×5
120C15D 120 ACE 770 CFM · Exhaust Fan ×5
120SQN17D VF 120 SQN 750 CFM · Exhaust Fan ×5
16XWS28D152 1628 XWS 1,500 CFM · Exhaust Fan ×5
225VX10B 225 VCRX 2,900 CFM · Kitchen Exhaust ×5
225VX9B 225 VCRX 2,700 CFM · Kitchen Exhaust ×5
1 project · most recent 08/28/2026
FiledStatusContractorScope
08/28/2026Signed-offRael Automatic Sprinkler Co—
1 project · most recent 07/23/2025
Storm Water/Sanitary
FiledStatusContractorScope
07/23/2025Permit IssuedVarsity Plumbing and HeatingStorm, Water/Sanitary
8 projects · most recent 10/10/2025
General Wiring Lighting
FiledStatusContractorScope
10/10/2025Permit IssuedStanco System Electrical ContGeneral Wiring
07/18/2025Permit IssuedMilad ContractingGeneral Wiring, Lighting
07/15/2025CompleteMilad Contracting—
10/29/2024Permit IssuedTru-Val Electric—
01/22/2024CompleteNycom Electrical—
04/17/2023CompleteRaiden Electric—
09/22/2022Permit IssuedTru-Val ElectricGeneral Wiring
09/02/2022Permit IssuedTru-Val Electric1 meters, 1 new_meters
1 project · most recent 07/12/2024
FiledStatusContractorScope
07/12/2024Signed-offCitnalta Construction2 scope_items
1 project · most recent 09/12/2022
Fence
FiledStatusContractorScope
09/12/2022Signed-offCitnalta ConstructionFence
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
11/25/2025Pass-Final PL - UndergroundPassView ↗
10/06/2025Pass-Final Boiler Equipment InspectionPassView ↗
07/22/2025Pass-Final PL - UndergroundPassView ↗
07/22/2025Pass-Final PL - Up to 9 Requested FloorsPassView ↗
07/22/2025Pass-Final SD - Up to 9 Requested FloorsPassView ↗
07/22/2025Pass-Final SP - Up to 9 Requested FloorsPassView ↗
03/03/2025Pass-Final Boiler Equipment InspectionPassView ↗
10/15/2024Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 67
DateRequirementInspectorRole
09/03/2025HVAC-R and service water piping design and insulationNELSON LOPEZenergy_progress
09/03/2025Post-installed AnchorsNELSON LOPEZspecial
09/03/2025HVAC-R and service water heating system controlsNELSON LOPEZenergy_progress
09/03/2025HVAC-R and service water heating equipmentNELSON LOPEZenergy_progress
09/03/2025Maintenance informationNELSON LOPEZenergy_progress
09/02/2025Heating SystemsNELSON LOPEZspecial
07/25/2025Public Assembly Emergency LightingNELSON LOPEZprogress
07/24/2025Post-installed AnchorsNELSON LOPEZspecial
07/24/2025Fire-Resistant Penetrations and JointsNELSON LOPEZspecial
07/24/2025Energy Code Compliance InspectionsNELSON LOPEZprogress
07/24/2025Chimneys and ventsNELSON LOPEZspecial
07/24/2025Mechanical SystemsNELSON LOPEZspecial
07/24/2025HVAC-R and service water heating system controlsNELSON LOPEZenergy_progress
07/24/2025HVAC-R and service water piping design and insulationNELSON LOPEZenergy_progress
07/24/2025Maintenance informationNELSON LOPEZenergy_progress
07/24/2025HVAC-R and service water heating equipmentNELSON LOPEZenergy_progress
07/24/2025Shutoff dampersNELSON LOPEZenergy_progress
07/24/2025FinalNELSON LOPEZprogress
07/24/2025Excavations - Sheeting, Shoring, and BracingNELSON LOPEZspecial
07/18/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationNELSON LOPEZspecial
07/09/2025Fire-Resistant Penetrations and JointsNELSON LOPEZspecial
07/09/2025Post-installed AnchorsNELSON LOPEZspecial
07/09/2025Standpipe SystemsNELSON LOPEZspecial
07/09/2025Sprinkler SystemsNELSON LOPEZspecial
07/03/2025HVAC-R and service water piping design and insulationNELSON LOPEZenergy_progress
Latest 25 of 67.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
P.S. 160EducationEntire building
Project Q01280785 Alteration · Permit Entire · 09/04/2025
Project Q01197626 Alteration · Permit Entire · 04/16/2025
Project Q00955855 Alteration · LOC Issued · 11/09/2023
Project Q00948695 Alteration · LOC Issued · 10/17/2023
Project Q00831089 Alteration · LOC Issued · 02/17/2023
Project Q00814930 Alteration · LOC Issued · 01/25/2023
Project Q08046649 Alteration · LOC Issued · 11/30/2022
Project Q08017057 Alteration · LOC Issued · 10/18/2022
Project Q08001901 Alteration · LOC Issued · 09/12/2022
Project Q00682616 Alteration · Permit Entire · 03/22/2022
Project Q00662719 Alteration · Permit Entire · 01/27/2022
Project Q00665401 Alteration · Permit Entire · 01/24/2022
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 184 on file (BIS + DOB NOW)
▸Plans & Drawings28
▸DOB NOWPlans/Sketch25
08/26/2026Q00682616-P3Request digital key ↗
08/26/2026Q00682616-P2Request digital key ↗
08/26/2026Q00682616-P1Request digital key ↗
Showing 3 of 25 on file for this type
▸DOB NOWPlans/Sketch - Place of Assembly3
08/19/2026Q00659905-P1Request digital key ↗
08/19/2026Q00659905-I1Request digital key ↗
08/19/2026Q00659905-P2Request digital key ↗
▸Applications & Permits2
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION2
03/27/2025421901080Open ↗
03/05/2025421901080Open ↗
▸Seals & Professional Certifications52
▸DOB NOWDPL-1: Design Professional Seal & Signature28
08/26/2026Q00665401-I1Open ↗
08/26/2026Q00682616-S1Open ↗
08/26/2026Q00682616-P2Open ↗
Showing 3 of 28 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature14
09/23/2026Q00682616-S3Open ↗
09/23/2026Q01280785-I1Open ↗
09/18/2026Q00662719-P1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWProgress Inspector Seal & Signature10
09/23/2026Q01280785-I1Open ↗
09/23/2026Q00682616-S3Open ↗
09/18/2026Q00682616-P3Open ↗
Showing 3 of 10 on file for this type
▸Safety & Tenant Protection3
▸DOB NOWNYCSCA - Approved Site Safety Plans3
08/13/2026Q00814930-I1Open ↗
08/13/2026Q00955855-I1Open ↗
08/13/2026Q08001901-I1Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026Q00682616-S3Open ↗
▸Approvals, Objections & Sign-offs63
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter28
08/26/2026Q00682616-P2Open ↗
08/26/2026Q00682616-P1Open ↗
08/26/2026Q00682616-P6Open ↗
Showing 3 of 28 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)25
08/26/2026Q00682616-P2Open ↗
08/26/2026Q00682616-P1Open ↗
08/26/2026Q00682616-P6Open ↗
Showing 3 of 25 on file for this type
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)10
08/15/2026Q08001901-I1Open ↗
08/14/2026Q08046649-I1Open ↗
08/13/2026Q01280785-I1Open ↗
Showing 3 of 10 on file for this type
▸Other Documents35
▸DOB NOWNYCSCA - BCC Plan Examination Transmittal28
08/26/2026Q00682616-P2Open ↗
08/26/2026Q00682616-P1Open ↗
08/26/2026Q00682616-P6Open ↗
Showing 3 of 28 on file for this type
▸DOB NOWNYCSCA Exhibit 25
08/15/2026Q08001901-I1Open ↗
08/14/2026Q08046649-I1Open ↗
08/13/2026Q00955855-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWAdjoining Owners Notification2
08/13/2026Q08046649-I1Open ↗
08/13/2026Q08017057-I1Open ↗