← Back
Two stories - detached, small or mid-size
145-19 106 AVENUE
QUEENS · Jamaica · BIN 4214870
💬 Discuss this project
1920Year Built
2.5Stories
A1Building Class
R4-1Zoning
1,504 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
Two stories - detached, small or mid-size · 2,500 sf lot · 0.6 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalPlumbing
Roof2p · 1 filing · 7 docs
Attic1p · 1 filing · 7 docs
Floor 21p · 1 filing · 7 docs
Floor 12p · 2 filings · 20 docs
Cellar7p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
10631 QUEENS BUYERS LLC103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
01/24/2024$755K—Private party → Private party$502/sf building
02/16/2018$160K—Private party → 10631 QUEENS BUYER LLC$106/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
GREEN RIVER ENVIRONMENTAL ENGINEERI111/17/2025
J.K.DESIGN306/07/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NY State Solar LLC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NY SOLAR ELECTRICAL LLCElectrical103/22/2026
WEBSTAR ELECL CONTRS INCElectrical103/22/2026
NYSS LLCGeneral Contractor104/09/2026
SB RENOVATION & MODELINGGeneral Contractor107/08/2026
ROCK E SMALL PLBG&HTG INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
GREEN RIVER ENVIRONMENTAL7841111/17/2025
AA BUILDING & INSPECTION1519306/07/2023
Building Lifecycle
All (49)Filed (4)Permit Issued (3)Signed Off (3)Violation (3)Inspection (3)Objection (4)Special Inspection (29)
01/06/2026
Signed off — Alteration
INSTALLATION OF PHOTOVOLTAIC SOLAR ARRAY ON EXISTING ROOF SYSTEM AS PER PLANS
Q01270172-I1
11/19/2025
Permit issued — Solar
Q01270172-I1-SL
11/17/2025
Filed — Alteration
INSTALLATION OF PHOTOVOLTAIC SOLAR ARRAY ON EXISTING ROOF SYSTEM AS PER PLANS
Q01270172-I1
08/12/2025
Special inspection requirement — Air barrier - visual inspection
ROBERT MASONE
08/12/2025
Special inspection requirement — Final
ROBERT MASONE
08/12/2025
Special inspection requirement — Energy Code Compliance Inspections
ROBERT MASONE
08/12/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
ROBERT MASONE
07/31/2023
Signed off — Alteration
File hereby to answer DOB violation number VI022-0264, for work without a permit that is 80% complete. completed work is for the interior renovation of an existing one family. New drywall partitions and plumbing fixtures. No change in use egress or occupa
Q07998589-I1
07/11/2023
Signed off — Alteration
Installation of new boiler and hot water htr at cellar level for the one family dwelling unit. Filed in conjunction with ALT application #Q007998589 ,and to answer DOB violation #VI022-02604.
Q08039111-I1
06/22/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
06/12/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Younes Abouyaala
06/12/2023
Special inspection requirement — HVAC-R and service water heating system controls
Younes Abouyaala
06/12/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
06/12/2023
Special inspection requirement — Energy Code Compliance Inspections
Younes Abouyaala
06/12/2023
Special inspection requirement — Maintenance information
Younes Abouyaala
06/12/2023
Special inspection requirement — HVAC-R and service water heating equipment
Younes Abouyaala
06/07/2023
Filed — Alteration
Installation of new boiler and hot water htr at cellar level for the one family dwelling unit. Filed in conjunction with ALT application #Q007998589 ,and to answer DOB violation #VI022-02604.
Q08039111-P1
06/02/2023
Special inspection requirement — HVAC-R and service water heating equipment
Younes Abouyaala
06/02/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Younes Abouyaala
06/02/2023
Special inspection requirement — HVAC-R and service water heating system controls
Younes Abouyaala
06/02/2023
Special inspection requirement — Maintenance information
Younes Abouyaala
06/02/2023
Special inspection requirement — Energy Code Compliance Inspections
Younes Abouyaala
06/02/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
06/01/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/19/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
04/07/2023
Permit issued — Plumbing
Q08039111-I1-PL
11/15/2022
Filed — Alteration
Installation of new boiler and hot water htr at cellar level for the one family dwelling unit. Filed in conjunction with ALT application #Q007998589 ,and to answer DOB violation #VI022-02604.
Q08039111-I1
11/09/2022
Permit issued — General Construction
Q07998589-I1-GC
10/04/2022
Objection raised — Other
10/04/2022
Objection resolved — Addressed
10/04/2022
Objection raised — Energy
10/04/2022
Objection resolved — Addressed
09/29/2022
Filed — Alteration
File hereby to answer DOB violation number VI022-0264, for work without a permit that is 80% complete. completed work is for the interior renovation of an existing one family. New drywall partitions and plumbing fixtures. No change in use egress or occupa
Q07998589-I1
09/05/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
09/05/2022
Special inspection requirement — Energy Code Compliance Inspections
Younes Abouyaala
09/05/2022
Special inspection requirement — Fire-Resistance Rated Construction
Younes Abouyaala
09/05/2022
Special inspection requirement — Final
jacob Kanner
09/05/2022
Special inspection requirement — Air barrier - visual inspection
Younes Abouyaala
09/05/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
Younes Abouyaala
09/05/2022
Special inspection requirement — HVAC-R and service water heating equipment
Younes Abouyaala
09/05/2022
Special inspection requirement — Fenestration air leakage
Younes Abouyaala
09/05/2022
Special inspection requirement — Interior lighting power
Younes Abouyaala
09/05/2022
Special inspection requirement — Fenestration and door U-factor and product ratings
Younes Abouyaala
09/05/2022
Special inspection requirement — HVAC-R and service water heating system controls
Younes Abouyaala
09/05/2022
Special inspection requirement — Permanent certificate
Younes Abouyaala
09/05/2022
Special inspection requirement — Fenestration areas
Younes Abouyaala
08/12/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/13/2002
Violation issued (ECB, closed)
Zoning
09/04/2002
Violation issued (ECB, closed)
Zoning
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offNYSS LLC11/19/2025
DOB NOWPlumbingSigned-offROCK E SMALL PLBG&HTG INC04/07/2023
DOB NOWGeneral ConstructionSigned-offSB RENOVATION & MODELING11/09/2022
3 projects · most recent 08/13/2025
General Wiring
FiledStatusContractorScope
08/13/2025CompleteNY SOLAR ELECTRICAL LLC—
03/03/2025Permit IssuedNY SOLAR ELECTRICAL LLC—
12/18/2023CompleteWEBSTAR ELECL CONTRS INCGeneral Wiring
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
06/22/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/01/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/19/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 29
DateRequirementInspectorRole
08/12/2025Air barrier - visual inspectionROBERT MASONEenergy_progress
08/12/2025FinalROBERT MASONEprogress
08/12/2025Energy Code Compliance InspectionsROBERT MASONEprogress
08/12/2025Fire-Resistant Penetrations and JointsROBERT MASONEspecial
06/12/2023HVAC-R and service water piping design and insulationYounes Abouyaalaenergy_progress
06/12/2023HVAC-R and service water heating system controlsYounes Abouyaalaenergy_progress
06/12/2023Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
06/12/2023Energy Code Compliance InspectionsYounes Abouyaalaprogress
06/12/2023Maintenance informationYounes Abouyaalaenergy_progress
06/12/2023HVAC-R and service water heating equipmentYounes Abouyaalaenergy_progress
06/02/2023HVAC-R and service water heating equipmentYounes Abouyaalaenergy_progress
06/02/2023HVAC-R and service water piping design and insulationYounes Abouyaalaenergy_progress
06/02/2023HVAC-R and service water heating system controlsYounes Abouyaalaenergy_progress
06/02/2023Maintenance informationYounes Abouyaalaenergy_progress
06/02/2023Energy Code Compliance InspectionsYounes Abouyaalaprogress
06/02/2023Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
09/05/2022Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
09/05/2022Energy Code Compliance InspectionsYounes Abouyaalaprogress
09/05/2022Fire-Resistance Rated ConstructionYounes Abouyaalaprogress
09/05/2022Finaljacob Kannerprogress
09/05/2022Air barrier - visual inspectionYounes Abouyaalaenergy_progress
09/05/2022HVAC-R and service water piping design and insulationYounes Abouyaalaenergy_progress
09/05/2022HVAC-R and service water heating equipmentYounes Abouyaalaenergy_progress
09/05/2022Fenestration air leakageYounes Abouyaalaenergy_progress
09/05/2022Interior lighting powerYounes Abouyaalaenergy_progress
Latest 25 of 29.
▾Documents — 32 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/25/2026Q07998589-I1Request digital key ↗
08/24/2026Q08039111-P1Request digital key ↗
08/24/2026Q08039111-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications23
▸DOB NOWProgress Inspector Seal & Signature15
09/23/2026Q07998589-I1Open ↗
09/23/2026Q07998589-I1Open ↗
09/23/2026Q07998589-I1Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/24/2026Q08039111-P1Open ↗
08/24/2026Q08039111-I1Open ↗
08/18/2026Q01270172-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/23/2026Q07998589-I1Open ↗
09/01/2026Q08039111-P1Open ↗
08/31/2026Q08039111-I1Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/24/2026Q08039111-I1Open ↗
08/24/2026Q08039111-P1Open ↗
08/18/2026Q01270172-I1Open ↗
Showing 3 of 4 on file for this type
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026Q01270172-I1Open ↗