← Back
Elevator apt, miscellaneous
145 2 AVENUE
MANHATTAN · BIN 1006800
💬 Discuss this project
1920Year Built
7Stories
D9Building Class
R7AZoning
25,340 sfGross Floor Area
27Units
LL97 CoveredRent Stabilized39 Open Violations 36 unresolved · 3 paperwork only ▸FISP: SWARMP
Elevator apt, miscellaneous · Owner of record: 145 2ND AVE OWNER LLC · 4,147 sf lot · 6.11 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingCivilGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction4p · 2 filings · 10 docs
Floor 56p · 2 filings · 20 docs
Floor 43p · 1 filing · 8 docs
Floor 34p · 2 filings · 15 docs
Floor 26p · 2 filings · 20 docs
Floor 18p · 2 filings · 20 docs
Basement1p · 1 filing · 3 docs
2 jobs · most recent 11/17/2024
Heating and Air Conditioning Systems Associated Ducts and Piping Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
11/17/2024——Heating and Air Conditioning Systems
Heat / Cool
Lg ARUN038GS 3 tons · Vrf Outdoor ×4
LG ARUN048GSS4 4 tons · Vrf Outdoor ×4
09/06/2023——Associated Ducts and Piping, Ventilation Systems
Ventilation
Loren Cook SQN-D VF 3,943 CFM · Makeup Air ×1
VCR-XP 4,926 CFM · Kitchen Exhaust ×1
Greenheck IDHE 3,943 CFM · Ductwork ×1
Ducts & Piping
N/A ×1
3 jobs · most recent 07/28/2026
Gas Water/Sanitary
FiledStatusContractorScope
07/28/2026Signed-offA. HTG AND PLBG WORKS INCGas
10/16/2025Permit IssuedDARINKO PLUMBING COGas, Water/Sanitary
06/15/2025Signed-offJMW PLUMBING, INCGas, Water/Sanitary
12 jobs · most recent 04/08/2026
General Wiring Boiler Controls
FiledStatusContractorScope
04/08/2026Permit IssuedRICHARD NEU—
04/07/2026Permit IssuedHI-LIGHTS ELECTRICALBoiler Controls
03/11/2026Permit IssuedHIGH QUALITY ELEC.OF NYC—
10/17/2025CompleteLEONE ELECTRIC CO. LLC1 meters, 1 new_meters
06/19/2025Permit IssuedJP & SON ELECTRIC CORPGeneral Wiring
09/11/2023Permit IssuedE.C. ELECL CONTRACTOR INCGeneral Wiring
02/17/2023CompleteREDGRAVE ELECTL MAINTNCE29 meters, 1 new_meters
12/26/2022Permit IssuedFOSTER ELEC'L SVC., INC.General Wiring
03/10/2022Permit IssuedGMJ ELECTRIC CORPGeneral Wiring
05/06/2019CompleteALL WAYS ELECTRIC CORP.WGeneral Wiring
12/10/2018Permit Issued247 ELECTRICAL CORP—
05/28/2018CompleteSTEVEN FARKAS—
1 job · most recent 04/07/2026
Sidewalk Shed
FiledStatusContractorScope
04/07/2026Permit IssuedSAFETECH ENTERPRISES CORPSidewalk Shed
1 job · most recent 04/14/2026
Suspended Scaffold (SC)
FiledStatusContractorScope
04/14/2026Permit IssuedSAFETECH ENTERPRISES CORPSuspended Scaffold (SC)
Building Lifecycle
All (195)Filed (31)Permit Issued (31)Signed Off (4)Facade (FISP) (17)Violation (60)Inspection (10)Objection (12)Special Inspection (30)
09/25/2026
Permit issued — Sidewalk Shed
M01382001-I1-SH
08/29/2026
Violation issued (HPD, open)
A
08/29/2026
Violation issued (HPD, open)
A
08/29/2026
Violation issued (HPD, open)
B
08/29/2026
Violation issued (HPD, open)
C
08/29/2026
Violation issued (HPD, open)
B
08/29/2026
Violation issued (HPD, open)
B
08/29/2026
Violation issued (HPD, open)
A
08/29/2026
Violation issued (HPD, open)
B
08/03/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/29/2026
Special inspection requirement — Tenant Protection Plan Compliance
07/28/2026
Filed — Alteration
GAS TO GAS REPLACEMENT . RECONNECT EXISTING GAS LINE TO REPLACEMENT BURNER AND REPLACE GAS TRAIN .
M01370059-P1
07/07/2026
Permit issued — Sidewalk Shed
M01382001-I1-SH
07/07/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/21/2026
Violation issued (HPD, open)
C
05/21/2026
Violation issued (HPD, open)
B
05/01/2026
Permit issued — Suspended Scaffold
M01382362-I1-SC
04/23/2026
Objection raised — Other
04/23/2026
Objection resolved — Addressed
04/14/2026
Filed — Alteration
Suspended Scaffold for Facade Restoration & Inspection as Shown on Plans
M01382362-I1
04/14/2026
Special inspection requirement — Post-installed Anchors
Michael Walsh
04/14/2026
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
Michael Walsh
04/08/2026
Permit issued — Sidewalk Shed
M01382001-I1-SH
04/07/2026
Filed — Alteration
INSTALLATION OF 300PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M01382001-I1
04/07/2026
Permit issued — General Construction
M01331665-I1-GC
04/06/2026
Violation issued (ECB, open)
Boilers
04/04/2026
Violation issued (HPD, open)
A
04/04/2026
Violation issued (HPD, open)
C
04/04/2026
Violation issued (HPD, closed)
C
04/04/2026
Violation issued (HPD, open)
A
04/04/2026
Violation issued (HPD, open)
C
04/04/2026
Violation issued (HPD, open)
A
04/04/2026
Violation issued (HPD, open)
A
04/04/2026
Violation issued (HPD, open)
C
04/04/2026
Violation issued (HPD, open)
A
04/04/2026
Violation issued (HPD, open)
A
04/01/2026
Violation issued (HPD, closed)
C
03/29/2026
Violation issued (HPD, closed)
A
03/29/2026
Violation issued (HPD, closed)
A
03/29/2026
Violation issued (HPD, closed)
C
03/20/2026
Filed — Alteration
FACADE WORK AS PER PLANS FILED. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M01331665-I1
03/19/2026
Permit issued — Plumbing
M01370059-I1-PL
03/19/2026
Permit issued — Boiler Equipment
M01370006-I1-BE
03/14/2026
Violation issued (HPD, closed)
C
03/14/2026
Violation issued (HPD, closed)
C
03/14/2026
Violation issued (HPD, closed)
C
03/14/2026
Violation issued (HPD, closed)
C
03/14/2026
Violation issued (HPD, closed)
C
03/14/2026
Violation issued (HPD, open)
A
03/13/2026
Filed — Alteration
GAS TO GAS REPLACEMENT . RECONNECT EXISTING GAS LINE TO REPLACEMENT BURNER AND REPLACE GAS TRAIN .
M01370059-I1
03/13/2026
Filed — Alteration
BOILER AND BURNER REPLACEMENT .
M01370006-I1
03/12/2026
Permit issued — Sidewalk Shed
M01370237-I1-SH
03/12/2026
Special inspection requirement — Maintenance information
HOWARD KRIGSMAN
03/11/2026
Filed — Alteration
M01370237-I1
03/10/2026
Special inspection requirement — Tenant Protection Plan Compliance
HOWARD KRIGSMAN
03/10/2026
Special inspection requirement — HVAC-R and service water heating equipment
HOWARD KRIGSMAN
03/10/2026
Special inspection requirement — HVAC-R and service water heating system controls
HOWARD KRIGSMAN
03/10/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
HOWARD KRIGSMAN
02/27/2026
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
02/25/2026
Violation issued (HPD, closed)
C
Latest 60 of 195 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SAFETECH ENTERPRISES309/26/2026
M1 VENTURES909/13/2026
BOLT DESIGN GROUP1607/08/2026
UPTOWN CONSTRUCTION SERVICE GROUP I304/09/2026
LOCKHILL PROPERTIES504/09/2026
INTERSYSTEM INSTALLATION CORP1003/22/2026
RYCO CAPITAL603/22/2026
145 2ND AVE OWNER LLC103/22/2026
SPLEN CONSTRUCTION203/22/2026
SHOUT 1,LLC903/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/11/2025$20.4M—— → —$803/sf building
06/27/2024$20.0M—MDN RE CSAI, LLC → WEST LAKE 145 SECOND AVENUE LLC$789/sf building
12/21/2015$758K—SH 145 SECOND AVENUE LLC → SHOUT 1, LLC$30/sf building
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MUNICIPAL BUILDING CONSULTANTS203/21/2026
KD DESIGNS103/21/2026
THE VILNITS GROUP LLC603/21/2026
BASIC GROUPS203/21/2026
GC1 EXPEDITING203/21/2026
Rigid Structural Design, LLC403/21/2026
CONSTRUCTION PERMIT SERVICES103/21/2026
HH BUILDING CONSULTING & ARCHITECTU403/21/2026
HALF SQUARE203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
INTERSYSTEM INSTALLATIONGeneral Contractor1907/08/2026
SYED-NAQVI ALTAFElectrical603/21/2026
SYED-NAQVI, ALTAFElectrical603/21/2026
SAFETECH ENTERPRISES CORPGeneral Contractor409/26/2026
CLEARCOM WIRELESS SERVICEGeneral Contractor303/21/2026
ZDR LLCGeneral Contractor303/21/2026
SPLEN CONSTRUCTION INCGeneral Contractor303/21/2026
SBR CONTRACTING NY CORPGeneral Contractor303/21/2026
A. HTG AND PLBG WORKS INCPlumbing207/08/2026
JOSEPH ALOIAElectrical203/21/2026
L.L.G. PLBG & HTG INCPlumbing207/08/2026
STIVAN PLBG & HTG INCPlumbing107/08/2026
GMJ ELECTRIC CORPElectrical103/22/2026
RICHARD ESPOSITOElectrical103/21/2026
ANDREW CONSTRUCTION SERVIGeneral Contractor104/09/2026
CEL TECH ELECTRIC INCGeneral Contractor104/09/2026
KLE CONSTRUCTION INCGeneral Contractor107/08/2026
UPTOWN CONSTRUCTION SERVGeneral Contractor104/09/2026
DPH PLUMBING & HTG CORPPlumbing107/08/2026
G&B PLUMBING&HEATING CORPPlumbing107/08/2026
ESPOSITO, RICHARDElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PCS ENGINEERING3745104/14/2026
KOENIGSBERG ENGINEERING,2247103/20/2026
RI CONSULTING SERVICES IN8904103/20/2026
RONALD KRIGSMAN P.E.P.C.1583103/13/2026
AMERILAND BROOK LLC1506810/16/2025
VAKOTA ARCHITECTURE7281206/15/2025
GREEN SOLUTIONS ENGINEERI5478111/17/2024
SA-DA ARCHITECTURE2640411/17/2024
KMB DESIGN GROUP, LLC513105/10/2024
FULLERTON ENGINEERING PC8636102/16/2023
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedSAFETECH ENTERPRISES CORP09/25/2026
DOB NOWSidewalk ShedPermit IssuedSAFETECH ENTERPRISES CORP07/07/2026
DOB NOWSuspended ScaffoldPermit IssuedSAFETECH ENTERPRISES CORP05/01/2026
DOB NOWSidewalk ShedPermit IssuedSAFETECH ENTERPRISES CORP04/08/2026
DOB NOWGeneral ConstructionPermit IssuedSAFETECH ENTERPRISES CORP04/07/2026
DOB NOWPlumbingSigned-offD.H. EAGLE PLUMBING, LLC03/19/2026
DOB NOWBoiler EquipmentSigned-offD.H. EAGLE PLUMBING, LLC03/19/2026
DOB NOWSidewalk ShedPermit IssuedUPTOWN CONSTRUCTION SERV03/12/2026
DOB NOWAntennaPermit IssuedCEL TECH ELECTRIC INC11/06/2025
DOB NOWPlumbingSigned-offDPH PLUMBING & HTG CORP07/08/2025
DOB NOWGeneral ConstructionPermit IssuedANDREW CONSTRUCTION SERVI06/24/2025
DOB NOWConstruction FenceSigned-offZDR LLC01/28/2025
DOB NOWPlumbingPermit IssuedDARINKO PLUMBING CO12/30/2024
DOB NOWPlumbingPermit IssuedSTIVAN PLBG & HTG INC06/26/2024
DOB NOWAntennaSigned-offCLEARCOM WIRELESS SERVICE08/15/2023
DOB NOWPlumbingPermit IssuedL.L.G. PLBG & HTG INC04/10/2023
DOB NOWGeneral ConstructionPermit IssuedKLE CONSTRUCTION INC03/14/2023
DOB NOWGeneral ConstructionPermit IssuedSBR CONTRACTING NY CORP12/15/2022
DOB NOWSidewalk ShedSigned-offINTERSYSTEM INSTALLATION09/06/2022
DOB NOWSupported ScaffoldSigned-offINTERSYSTEM INSTALLATION04/22/2022
DOB NOWPlumbingPermit IssuedL.L.G. PLBG & HTG INC03/18/2022
DOB NOWGeneral ConstructionPermit IssuedSPLEN CONSTRUCTION INC01/27/2022
DOB NOWSidewalk ShedSigned-offINTERSYSTEM INSTALLATION08/06/2021
DOB NOWSidewalk ShedSigned-offINTERSYSTEM INSTALLATION09/16/2020
DOB NOWSupported ScaffoldSigned-offINTERSYSTEM INSTALLATION09/04/2020
DOB NOWSidewalk ShedSigned-offINTERSYSTEM INSTALLATION09/30/2019
DOB NOWSupported ScaffoldSigned-offINTERSYSTEM INSTALLATION09/26/2019
DOB NOWSidewalk ShedSigned-offINTERSYSTEM INSTALLATION07/24/2019
DOB NOWSupported ScaffoldSigned-offINTERSYSTEM INSTALLATION03/05/2019
DOB NOWSidewalk ShedSigned-offINTERSYSTEM INSTALLATION07/31/2018
DOB NOWSidewalk ShedSigned-offINTERSYSTEM INSTALLATION05/30/2018
BISEQISSUEDINTERSYSTEM INSTALLATION03/03/2021
BISOTISSUEDPRATT CONSTRUCTION & REST01/19/2021
BISOTISSUEDPRATT CONSTRUCTION & REST05/27/2020
BISEQISSUEDINTERSYSTEM INSTALLATION03/25/2020
BISOTISSUEDPRATT CONSTRUCTION & REST06/20/2019
BISEQISSUEDINTERSYSTEM INSTALLATION03/11/2019
BISOTISSUEDS.B.I CONRACTING NY CORP06/02/2017
BISPLISSUEDTOP DOG PLBG & HTG CORP04/28/2017
BISOTISSUEDS.B.I CONRACTING NY CORP04/25/2017
+ 41 more permits on file
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
08/03/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/07/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/27/2026Pass-Final General Construction Non-Directive 14PassView ↗
01/08/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
01/08/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/17/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/20/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/07/2024Fail-Final PL - Up to 3 Requested FloorsFailView ↗
07/15/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
04/18/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 66
DateRequirementInspectorRole
07/29/2026Tenant Protection Plan Compliance—special
04/14/2026Alternative Materials - OTCR Buildings Bulletin NumberMichael Walshspecial
04/14/2026Post-installed AnchorsMichael Walshspecial
03/12/2026Maintenance informationHOWARD KRIGSMANenergy_progress
03/10/2026Tenant Protection Plan ComplianceHOWARD KRIGSMANspecial
03/10/2026HVAC-R and service water heating equipmentHOWARD KRIGSMANenergy_progress
03/10/2026HVAC-R and service water heating system controlsHOWARD KRIGSMANenergy_progress
03/10/2026HVAC-R and service water piping design and insulationHOWARD KRIGSMANenergy_progress
02/24/2026Structural Stability – Alterations of existing buildingsRICHARD KOENIGSBERGspecial
02/24/2026MasonryRICHARD KOENIGSBERGspecial
02/24/2026Post-installed AnchorsRICHARD KOENIGSBERGspecial
12/10/2025FinalRICHARD KOENIGSBERGprogress
12/10/2025Tenant Protection Plan ComplianceMd Istiaque Hasanspecial
10/17/2025Maintenance informationXIAOHONG ZHAOenergy_progress
10/17/2025Energy Code Compliance InspectionsXIAOHONG ZHAOprogress
10/17/2025Fire-Resistant Penetrations and JointsXIAOHONG ZHAOspecial
10/16/2025Maintenance informationXIAOHONG ZHAOenergy_progress
10/16/2025Fire-Resistant Penetrations and JointsXIAOHONG ZHAOspecial
10/16/2025Energy Code Compliance InspectionsXIAOHONG ZHAOprogress
09/17/2025Maintenance informationXIAOHONG ZHAOenergy_progress
09/17/2025Fire-Resistant Penetrations and JointsXIAOHONG ZHAOspecial
09/17/2025Energy Code Compliance InspectionsXIAOHONG ZHAOprogress
06/13/2025Fire-Resistant Penetrations and JointsDavid Varnishspecial
06/12/2025Tenant Protection Plan ComplianceDavid Varnishspecial
06/11/2025Maintenance informationXIAOHONG ZHAOenergy_progress
Latest 25 of 66.
▾Documents — 448 on file (BIS + DOB NOW)
▸Plans & Drawings33
▸DOB NOWPlans/Sketch28
09/06/2026M01382001-I1Request digital key ↗
09/06/2026M01382362-I1Request digital key ↗
09/05/2026M00048605-I1Request digital key ↗
Showing 3 of 28 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed4
09/05/2026M00048605-P2Request digital key ↗
09/05/2026M00048605-P3Request digital key ↗
09/05/2026M00048605-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Supported Scaffold1
09/05/2026M00135356-I1Request digital key ↗
▸Applications & Permits61
▸BISWORK PERMIT APPLICATION35
06/20/2019140838663Open ↗
03/07/2019140835425Open ↗
06/12/2017122785931Open ↗
Showing 3 of 35 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION25
03/15/2022140838663Open ↗
10/12/2021140838663Open ↗
01/26/2021140838663Open ↗
Showing 3 of 25 on file for this type
▸BISApplication Withdrawal/Address Change Form OP-1131
05/01/2017123080977Open ↗
▸Seals & Professional Certifications148
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION31
07/24/2019140838663Open ↗
11/06/2017123080977Open ↗
10/03/2017122785931Open ↗
Showing 3 of 31 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature31
09/06/2026M01382001-I1Open ↗
09/05/2026M00048605-P2Open ↗
09/05/2026M00048605-P3Open ↗
Showing 3 of 31 on file for this type
▸DOB NOWProgress Inspector Seal & Signature27
09/28/2026M00655774-I1Open ↗
09/28/2026M00655774-I1Open ↗
09/05/2026M00135356-I1Open ↗
Showing 3 of 27 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature23
09/28/2026M00655774-I1Open ↗
09/01/2026M00657834-P3Open ↗
09/01/2026M01085485-S1Open ↗
Showing 3 of 23 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST15
04/05/2017123055852Open ↗
08/02/2016122845387Open ↗
06/30/2016122822749Open ↗
Showing 3 of 15 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT10
03/07/2019140835425Open ↗
05/01/2017123080977Open ↗
04/05/2017123055852Open ↗
Showing 3 of 10 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISProfessional and Owner Certification (POC3)1
06/30/2016122822767Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
05/21/2019140838663Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
03/07/2019140835425Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
03/07/2019140835425Open ↗
▸BISPC FULL REPORT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment17
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE9
05/01/2017123080977Open ↗
04/05/2017123055852Open ↗
08/02/2016122845387Open ↗
Showing 3 of 9 on file for this type
▸BISSCHEDULE B - PLUMBING5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISSELF-CERT PLUMBING NOTICE3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Safety & Tenant Protection14
▸BISTenant Protection Plan and Notes10
05/01/2017123080977Open ↗
04/05/2017123055852Open ↗
08/02/2016122845387Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWTenant Protection Plan2
09/05/2026M00048605-P2Open ↗
09/05/2026M00048605-P3Open ↗
▸BISST-1: Street Tree Checklist1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISANTI-HARASSMENT CHECKLIST: CLINTON1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos35
▸DOB NOWDEP ACP-5: Asbestos Assessment Report15
09/01/2026M08053734-I1Open ↗
08/29/2026M00929244-I1Open ↗
08/29/2026M00929244-P1Open ↗
Showing 3 of 15 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)12
05/21/2019140838663Open ↗
05/01/2017123080977Open ↗
04/06/2017123055852Open ↗
Showing 3 of 12 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISASBESTOS: EXEMPTION (ASB4)1
08/20/2015122492828Open ↗
▸Energy Compliance30
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS18
11/06/2017123080977Open ↗
10/03/2017122785931Open ↗
05/26/2017122724506Open ↗
Showing 3 of 18 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS8
11/06/2017123080977Open ↗
10/03/2017122785931Open ↗
05/26/2017122724506Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
04/19/2022140838663Open ↗
03/11/2021140838663Open ↗
05/21/2019140838663Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
07/29/2022140838663Open ↗
▸Inspections & Test Reports9
▸BISTECHNICAL REPORT: RESPONSIBILITY6
07/25/2022140838663Open ↗
04/19/2022140838663Open ↗
01/21/2022140835425Open ↗
Showing 3 of 6 on file for this type
▸BISPOST-INSTALLED ANCHORS1
07/29/2022140838663Open ↗
▸BISSTRUCTURAL STABILITY - EXISTING BUILDINGS1
07/29/2022140838663Open ↗
▸BISMASONRY1
07/29/2022140838663Open ↗
▸Approvals, Objections & Sign-offs23
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST12
08/01/2022140838663Open ↗
01/24/2022140835425Open ↗
11/06/2017123080977Open ↗
Showing 3 of 12 on file for this type
▸BISADMINISTRATIVE OBJECTIONS7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISFINAL2
07/29/2022140838663Open ↗
01/21/2022140835425Open ↗
▸BISADULT ESTABLISHMENT APPROVAL1
05/01/2017123080977Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership48
▸BISCOST AFFIDAVIT34
04/19/2022140838663Open ↗
11/23/2021140838663Open ↗
03/11/2021140838663Open ↗
Showing 3 of 34 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT13
05/01/2017123080977Open ↗
08/09/2016122845387Open ↗
08/02/2016122845387Open ↗
Showing 3 of 13 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
07/29/2022140838663Open ↗
▸Filing & Intake Forms25
▸BISEFILING COVER SHEET17
05/01/2017123080977Open ↗
04/05/2017123055852Open ↗
08/02/2016122845387Open ↗
Showing 3 of 17 on file for this type
▸BISADDITIONAL INFORMATION4
05/10/2022140838663Open ↗
04/13/2022140838663Open ↗
03/11/2021140838663Open ↗
Showing 3 of 4 on file for this type
▸BISBOROUGH INTAKE FORM2
11/06/2017123080977Open ↗
10/03/2017122785931Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET2
05/21/2019140838663Open ↗
03/07/2019140835425Open ↗
▸Other Documents5
▸DOB NOWCalculations2
09/06/2026M01382362-I1Open ↗
08/13/2026M01382362-I1Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWPro Cert Restriction Exception (LL158/17)1
08/13/2026M01085485-S1Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026M01382362-I1Open ↗