← Back
BuildNYC
Two stories - detached, small or mid-size
145-21 GLASSBORO AVENUE
QUEENS · South Jamaica · BIN 4258138
💬 Discuss this project
1930Year Built
2.5Stories
A1Building Class
R4Zoning
1,674 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 3,000 sf lot · 0.56 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingCivil
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofUnder Construction1p · 1 filing · 20 docs
AtticUnder Construction1p · 1 filing · 20 docs
Floor 2Under Construction1p · 1 filing · 20 docs
Floor 1Construct new curbcutUnder Construction1p · 2 filings · 20 docs
CellarPlumbing and sprinkler workUnder Construction5p · 3 filings · 20 docs
Site & exteriorInstallation of construction fence for two family houseUnder Construction3p · 2 filings · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Architectural Concept708/07/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Architectual Concept1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Abg Construction NYGeneral Contractor407/08/2026
Abg Construction NYScaffold104/09/2026
Doug's Plumbing & Heating ServicePlumbing110/30/2026
LG Elite PlumbingPlumbing110/31/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Architectural Concept3642308/07/2026
Triangle Inspection & Tes7495101/02/2025
Building Lifecycle
10/30/2026
Permit issued — Plumbing
Q36168780-I1-PL
10/29/2026
Permit issued — Plumbing
Q01150609-I1-PL
08/07/2026
Filed — New Building
Prososed (2) story + cellar and attic, two-family house with one open parking space in the driveway as per drawings herewith filed.
Q01150603-P1
07/23/2026
Special inspection requirement — HVAC-R and service water heating system controls
MUZAFFAR JAMAL
07/23/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
MUZAFFAR JAMAL
53 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedLG Elite Plumbing10/30/2026
DOB NOWPlumbingPermit IssuedDoug's Plumbing & Heating Service10/29/2026
DOB NOWEarth WorkPermit IssuedAbg Construction NY05/22/2026
DOB NOWMechanical SystemsPermit IssuedAbg Construction NY04/27/2026
DOB NOWConstruction FencePermit IssuedAbg Construction NY02/10/2026
DOB NOWFull DemolitionSigned-offAbg Construction NY02/05/2026
1 project · most recent 08/07/2026
Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScope
08/07/2026Permit IssuedAbg Construction NYAir Conditioning Systems, Heating Systems, Ventilation Systems
1 project · most recent 05/19/2026
Storm
FiledStatusContractorScope
05/19/2026Permit IssuedDoug's Plumbing & Heating ServiceStorm
1 project · most recent 10/21/2026
General Wiring
FiledStatusContractorScope
10/21/2026Permit IssuedElectrical Services & Cons GPGeneral Wiring
1 project · most recent 08/07/2026
Steel Wood
FiledStatusContractorScope
08/07/2026Permit IssuedAbg Construction NYSteel, Wood
▾Special Inspection Requirements (DOB NOW) — 64
DateRequirementInspectorRole
07/23/2026Maintenance informationMUZAFFAR JAMALenergy_progress
07/23/2026Concrete - Cast-In-PlaceMUZAFFAR JAMALspecial
07/23/2026Excavations - Sheeting, Shoring, and BracingMUZAFFAR JAMALspecial
07/23/2026Fire-Resistant Penetrations and JointsMUZAFFAR JAMALspecial
07/23/2026MasonryMUZAFFAR JAMALspecial
07/23/2026Mechanical SystemsMUZAFFAR JAMALspecial
07/23/2026Structural Cold-Formed SteelMUZAFFAR JAMALspecial
07/23/2026Structural Steel - DetailsMUZAFFAR JAMALspecial
07/23/2026Subgrade InspectionsMUZAFFAR JAMALspecial
07/23/2026Energy Code Compliance InspectionsMUZAFFAR JAMALprogress
07/23/2026FinalSyed Naqviprogress
07/23/2026Fire-Resistance Rated ConstructionMUZAFFAR JAMALprogress
07/23/2026Footing and FoundationMUZAFFAR JAMALprogress
07/23/2026Fenestration areasMUZAFFAR JAMALenergy_progress
07/23/2026Insulation placement and R valuesMUZAFFAR JAMALenergy_progress
07/23/2026Interior lighting powerMUZAFFAR JAMALenergy_progress
07/23/2026HVAC-R and service water heating equipmentMUZAFFAR JAMALenergy_progress
07/23/2026HVAC-R and service water heating system controlsMUZAFFAR JAMALenergy_progress
07/23/2026Permanent certificateMUZAFFAR JAMALenergy_progress
07/23/2026Air barrier - visual inspectionMUZAFFAR JAMALenergy_progress
07/23/2026Ventilation and air distribution systemMUZAFFAR JAMALenergy_progress
07/23/2026HVAC-R and service water piping design and insulationMUZAFFAR JAMALenergy_progress
07/23/2026Duct leakage testing, insulation and designMUZAFFAR JAMALenergy_progress
07/23/2026MeteringMUZAFFAR JAMALenergy_progress
07/23/2026Electric vehicle service equipment requirementsMUZAFFAR JAMALenergy_progress
Latest 25 of 64.
61 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account