← Back
Three families
145-28 34 AVENUE
QUEENS · Murray Hill-Broadway Flushing · BIN 4113035
💬 Discuss this project
1965Year Built
3Stories
C0Building Class
R7-1Zoning
2,995 sfGross Floor Area
3Units
Three families · 1,900 sf lot · 1.58 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Floor 34p · 2 filings · 8 docs
Floor 24p · 2 filings · 8 docs
Floor 14p · 2 filings · 8 docs
Cellar4p · 2 filings · 8 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
10/06/2022$1.6M—— → —$518/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
HPL ENGINEERING P.C.211/30/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JM CONSULTANT STUDIO403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NY BUILDING ASSOCIATES INGeneral Contractor203/21/2026
CATMAN PLUMBING INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HPL ENGINEERING PC5613211/30/2022
Building Lifecycle
All (8)Filed (2)Permit Issued (1)Signed Off (2)Inspection (1)Special Inspection (2)
07/26/2023
Signed off — Alteration
MINOR RENOVATION ON CELLAR, 1ST, 2ND & 3RD FLOOR, PATCH AND RENEW THE COSMETIC WORK. PLUMBING WORK TO BE FILED UNDER DOBNow APPLICATION#: Q08047006. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
Q08047005-I1
07/24/2023
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
07/05/2023
Signed off — Alteration
FILE PLUMBING WORK IN-CONJUNCTION WITH DOBNow GENERAL CONSTRUCTION JOB#: Q08047005. INSTALL NEW HWH & BOILER, REPLACE KITCHEN & BATHROOM. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
Q08047006-I1
12/02/2022
Permit issued — General Construction
Q08047005-I1-GC
11/30/2022
Filed — Alteration
MINOR RENOVATION ON CELLAR, 1ST, 2ND & 3RD FLOOR, PATCH AND RENEW THE COSMETIC WORK. PLUMBING WORK TO BE FILED UNDER DOBNow APPLICATION#: Q08047006. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
Q08047005-I1
11/30/2022
Filed — Alteration
FILE PLUMBING WORK IN-CONJUNCTION WITH DOBNow GENERAL CONSTRUCTION JOB#: Q08047005. INSTALL NEW HWH & BOILER, REPLACE KITCHEN & BATHROOM. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
Q08047006-I1
11/30/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Fran Huang
11/30/2022
Special inspection requirement — Energy Code Compliance Inspections
Fran Huang
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offNY BUILDING ASSOCIATES IN12/02/2022
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
07/24/2023Pass-Final General Construction Non-Directive 14PassView ↗
▾Special Inspection Requirements (DOB NOW) — 2
DateRequirementInspectorRole
11/30/2022Fire-Resistant Penetrations and JointsFran Huangspecial
11/30/2022Energy Code Compliance InspectionsFran Huangprogress
▾Documents — 8 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/25/2026Q08047005-I1Request digital key ↗
08/25/2026Q08047006-I1Request digital key ↗
▸Seals & Professional Certifications4
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/25/2026Q08047005-I1Open ↗
08/25/2026Q08047006-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/26/2026Q08047006-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/26/2026Q08047006-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/25/2026Q08047005-I1Open ↗
08/25/2026Q08047006-I1Open ↗