← Back
One story - permanent living quarter
145-40 175 STREET
💬 Discuss this project
1960Year Built
1Stories
A2Building Class
R3-2Zoning
874 sfGross Floor Area
1Units
One story - permanent living quarter · 3,995 sf lot · 0.22 FAR built · Flood zone X500
Locations of Work
ArchitectureStructural
Roof2p · 1 filing · 13 docs
Cellar4p · 1 filing · 13 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PETER CHO ARCHITECTS, PLLC305/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
JOSEPH WEINSTEIN ELECTRICElectrical103/22/2026
Building Lifecycle
All (55)Filed (3)Objection (22)Special Inspection (30)
08/17/2026
Objection resolved — Resolved
08/17/2026
Objection resolved — Resolved
08/17/2026
Objection resolved — Resolved
08/17/2026
Objection resolved — Resolved
08/17/2026
Objection resolved — Resolved
08/17/2026
Objection resolved — Resolved
08/17/2026
Objection resolved — Resolved
08/17/2026
Objection resolved — Resolved
08/17/2026
Objection resolved — Resolved
06/29/2026
Objection raised — Scope
06/29/2026
Objection resolved — Resolved
06/29/2026
Objection resolved — Resolved
06/26/2026
Objection raised — Other
06/26/2026
Objection raised — Scope
06/26/2026
Objection raised — Zoning
06/26/2026
Objection raised — Zoning
06/26/2026
Objection raised — Scope
06/26/2026
Objection raised — Zoning
06/26/2026
Objection raised — Cost
06/26/2026
Objection raised — Zoning
06/26/2026
Objection raised — Structural
06/26/2026
Objection raised — Energy
05/21/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
Q01395524-I1
05/21/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
Q01395524-S1
05/21/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
Q01395524-S2
05/19/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
05/19/2026
Special inspection requirement — Maintenance information
05/19/2026
Special inspection requirement — HVAC-R and service water heating equipment
05/19/2026
Special inspection requirement — HVAC-R and service water heating system controls
05/19/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
05/19/2026
Special inspection requirement — Energy Code Compliance Inspections
05/19/2026
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
05/19/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
05/18/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
05/18/2026
Special inspection requirement — Air barrier — testing
05/18/2026
Special inspection requirement — Air barrier - visual inspection
05/18/2026
Special inspection requirement — Fenestration air leakage
05/18/2026
Special inspection requirement — Fenestration areas
05/18/2026
Special inspection requirement — HVAC-R and service water heating system controls
05/18/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
05/18/2026
Special inspection requirement — HVAC-R and service water heating equipment
05/18/2026
Special inspection requirement — Permanent certificate
05/18/2026
Special inspection requirement — Insulation placement and R values
05/18/2026
Special inspection requirement — Ventilation and air distribution system
04/30/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
04/30/2026
Special inspection requirement — Subgrade Inspections
04/30/2026
Special inspection requirement — Interior lighting power
04/30/2026
Special inspection requirement — Structural Steel - High Strength Bolting
04/30/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
04/30/2026
Special inspection requirement — Electric vehicle service equipment requirements
04/30/2026
Special inspection requirement — Concrete - Cast-In-Place
04/30/2026
Special inspection requirement — Masonry
04/30/2026
Special inspection requirement — Heating Systems
04/30/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
04/30/2026
Special inspection requirement — Maintenance information
Nothing on file for this building.
1 project · most recent 07/20/2022
General Wiring
FiledStatusContractorScope
07/20/2022Permit IssuedJOSEPH WEINSTEIN ELECTRICGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 41
DateRequirementInspectorRole
05/19/2026Fire-Resistant Penetrations and Joints—special
05/19/2026Maintenance information—energy_progress
05/19/2026HVAC-R and service water heating equipment—energy_progress
05/19/2026HVAC-R and service water heating system controls—energy_progress
05/19/2026HVAC-R and service water piping design and insulation—energy_progress
05/19/2026Energy Code Compliance Inspections—progress
05/19/2026Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities—special
05/19/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation—special
05/18/2026HVAC-R and service water piping design and insulation—energy_progress
05/18/2026Air barrier — testing —energy_progress
05/18/2026Air barrier - visual inspection—energy_progress
05/18/2026Fenestration air leakage—energy_progress
05/18/2026Fenestration areas—energy_progress
05/18/2026HVAC-R and service water heating system controls—energy_progress
05/18/2026Fenestration and door U-factor and product ratings—energy_progress
05/18/2026HVAC-R and service water heating equipment—energy_progress
05/18/2026Permanent certificate—energy_progress
05/18/2026Insulation placement and R values—energy_progress
05/18/2026Ventilation and air distribution system—energy_progress
04/30/2026Subsurface Investigations (Borings/Test Pits)—special
04/30/2026Subgrade Inspections—special
04/30/2026Interior lighting power—energy_progress
04/30/2026Structural Steel - High Strength Bolting—special
04/30/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation—special
04/30/2026Electric vehicle service equipment requirements—energy_progress
Latest 25 of 41.
▾Documents — 13 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/16/2026Q01395524-S1Request digital key ↗
08/15/2026Q01395524-S2Request digital key ↗
08/14/2026Q01395524-I1Request digital key ↗
▸Zoning, Tax Lot & Property Records1
▸DOB NOWZD1: DOB Zoning Diagram1
08/14/2026Q01395524-I1Open ↗
▸Seals & Professional Certifications3
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/16/2026Q01395524-S2Open ↗
08/16/2026Q01395524-S1Open ↗
08/16/2026Q01395524-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/15/2026Q01395524-S2Open ↗
08/14/2026Q01395524-I1Open ↗
▸Inspections & Test Reports1
▸DOB NOWSOIL REPORT1
08/14/2026Q01395524-I1Open ↗
▸Other Documents3
▸DOB NOWProperty Ownership Certification1
08/14/2026Q01395524-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/14/2026Q01395524-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/14/2026Q01395524-I1Open ↗