← Back
Two family frame
145-43 20 AVENUE
QUEENS · BIN 4104809
💬 Discuss this project
2024Year Built
2.5Stories
B2Building Class
R3AZoning
4,909 sfGross Floor Area
2Units
0 Open ViolationsFDNY Report ↗
Two family frame · 6,248 sf lot · 0.79 FAR built · Flood zone X
Locations of Work
ArchitectureStructural
Roof1p · 1 filing · 3 docs
Floor 226p · 1 filing · 20 docs
Floor 126p · 1 filing · 20 docs
Cellar28p · 1 filing · 20 docs
1 job · most recent 06/24/2026
Associated Ducts and Piping Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
06/24/2026Signed-offHY DESIGN & DEVELOPMENT LAssociated Ducts and Piping, Heating Systems
Heating
A.O. Smith GCR-40 200 36,000 BTU · Water Heater ×4
Williamson GWA-100-N-T 100,000 BTU · Boiler ×4
Ducts & Piping
Delta Breeze SLIM50 50 CFM · Exhaust Fan ×16
Air King EB30BL 130 CFM · Kitchen Exhaust ×4
1 job · most recent 06/24/2026
Sprinkler System
FiledStatusContractorScope
06/24/2026Signed-offPARAMOUNT SERVICES, LLCSprinkler System
1 job · most recent 06/24/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
06/24/2026Signed-offROCK E SMALL PLBG&HTG INCGas, Storm, Water/Sanitary
2 jobs · most recent 06/26/2025
General Wiring
FiledStatusContractorScope
06/26/2025CompletePOWER SURGE ELECTRIC, INC—
09/23/2024CompleteKJK ELECTRIC INCGeneral Wiring
1 job · most recent 06/24/2026
Steel Masonry Wood
FiledStatusContractorScope
06/24/2026Signed-offROCK E SMALL PLBG&HTG INCSteel, Masonry, Wood
1 job · most recent 06/24/2026
Fence
FiledStatusContractorScope
06/24/2026Signed-offROCK E SMALL PLBG&HTG INCFence
1 job · most recent 06/24/2026
Earthwork
FiledStatusContractorScope
06/24/2026Signed-offHY DESIGN & DEVELOPMENT LEarthwork
Building Lifecycle
All (90)Filed (11)Permit Issued (10)Signed Off (6)Violation (2)Inspection (9)Objection (22)Special Inspection (30)
08/21/2026
Signed off — New Building
PROPOSE A NEW TWO STORY WITH TWO FAMILY HOUSE. OBTAIN NEW C OF O.
Q00942546-I1
08/03/2026
Special inspection requirement — Structural Wood Frame
BRIAN ILL
08/03/2026
Special inspection requirement — Lighting controls
BRIAN ILL
08/03/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
BRIAN ILL
08/03/2026
Special inspection requirement — Footing and Foundation
BRIAN ILL
08/03/2026
Special inspection requirement — Metering
BRIAN ILL
08/03/2026
Special inspection requirement — Fenestration air leakage
BRIAN ILL
08/03/2026
Special inspection requirement — Subgrade Inspections
XIAOHONG ZHAO
08/03/2026
Special inspection requirement — Structural Steel - High Strength Bolting
XIAOHONG ZHAO
08/03/2026
Special inspection requirement — Masonry
BRIAN ILL
08/03/2026
Special inspection requirement — Energy Code Compliance Inspections
BRIAN ILL
08/03/2026
Special inspection requirement — HVAC-R and service water heating equipment
BRIAN ILL
08/03/2026
Special inspection requirement — HVAC-R and service water heating system controls
BRIAN ILL
08/03/2026
Special inspection requirement — Air barrier - visual inspection
BRIAN ILL
08/03/2026
Special inspection requirement — Permanent certificate
BRIAN ILL
08/03/2026
Special inspection requirement — Heating Systems
BRIAN ILL
08/03/2026
Special inspection requirement — Mechanical Systems
BRIAN ILL
08/03/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
XIAOHONG ZHAO
08/03/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
TONY ONYEAGORO
08/03/2026
Special inspection requirement — Structural Steel - Details
BRIAN ILL
08/03/2026
Special inspection requirement — Chimneys and vents
BRIAN ILL
08/03/2026
Special inspection requirement — Structural Steel - Welding
BRIAN ILL
08/03/2026
Special inspection requirement — Concrete - Cast-In-Place
BRIAN ILL
08/03/2026
Special inspection requirement — Fire-Resistance Rated Construction
BRIAN ILL
08/03/2026
Special inspection requirement — Final
BRIAN ILL
08/03/2026
Special inspection requirement — Electric vehicle service equipment requirements
BRIAN ILL
08/03/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
BRIAN ILL
08/03/2026
Special inspection requirement — Duct leakage testing, insulation and design
BRIAN ILL
08/03/2026
Special inspection requirement — Fenestration areas
BRIAN ILL
08/03/2026
Special inspection requirement — Insulation placement and R values
BRIAN ILL
08/03/2026
Special inspection requirement — Exterior lighting power
BRIAN ILL
06/24/2026
Filed — New Building
PROPOSE A NEW TWO STORY WITH TWO FAMILY HOUSE. OBTAIN NEW C OF O.
Q00942546-P5
02/04/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
01/12/2026
Signed off — New Building
PROPOSE A NEW TWO STORY WITH TWO FAMILY HOUSE. OBTAIN NEW C OF O.
Q00942546-S3
01/12/2026
Signed off — New Building
PROPOSE A NEW TWO STORY WITH TWO FAMILY HOUSE. OBTAIN NEW C OF O.
Q00942546-S2
12/15/2025
Filed — New Building
PROPOSE A NEW TWO STORY WITH TWO FAMILY HOUSE. OBTAIN NEW C OF O.
Q00942546-P4
12/03/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
11/28/2025
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
11/19/2025
Signed off — New Building
PROPOSE A NEW TWO STORY WITH TWO FAMILY HOUSE. OBTAIN NEW C OF O.
Q00942546-S1
11/17/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
11/13/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
11/07/2025
Permit issued — Sprinklers
Q00942546-S3-PL
11/07/2025
Permit issued — Curb Cut
Q00942546-S2-CC
07/07/2025
Signed off — Alteration
Q01104711-I1
04/24/2025
Permit issued — Structural
Q00942546-I1-GC-CX
04/22/2025
Violation issued (ECB, closed)
Construction
04/08/2025
Permit issued — Construction Fence
Q00942546-S1-FN
12/20/2024
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
10/11/2024
Filed — New Building
PROPOSE A NEW TWO STORY WITH TWO FAMILY HOUSE. OBTAIN NEW C OF O.
Q00942546-S5
09/05/2024
Permit issued — Solar
Q01104711-I1-SL
09/03/2024
Filed — Alteration
Q01104711-I1
08/30/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
08/30/2024
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
08/30/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/28/2024
Violation issued (ECB, closed)
Construction
08/16/2024
Filed — New Building
PROPOSE A NEW TWO STORY WITH TWO FAMILY HOUSE. OBTAIN NEW C OF O.
Q00942546-P2
07/09/2024
Permit issued — Plumbing
Q00942546-S3-EW-SP
07/02/2024
Permit issued — Sprinklers
Q00942546-S3-PL
06/06/2024
Objection raised — Admin
06/06/2024
Objection resolved — Addressed
Latest 60 of 90 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
HY DESIGN & DEVELOPMENT L103/22/2026
DESIGN & DEVELOPMENT L103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
07/20/2023$1.3M—— → —— not available
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
HIRISE CONTRACTING GROUP, INC906/24/2026
SYNERGIC DESIGN ARCHITECTS109/03/2024
AMERILAND BROOK LLC109/06/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AMERILAND BROOK LLC1603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
HY DESIGN & DEVELOPMENT LLC.General Contractor1007/08/2026
POWER SURGE ELECTRIC, INCElectrical203/22/2026
ACCORD POWER INCGeneral Contractor203/21/2026
ROCK E SMALL PLBG&HTG INCPlumbing207/08/2026
VILLAGE P & H NY INCFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AMERILAND BROOK LLC1506406/24/2026
BRIAN ILL DEVELOPMENT LLC1402206/24/2026
HIRISE CONTRACTING GROUP,8228412/15/2025
SYNERGIC DESIGN LLC8561109/03/2024
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersSigned-offROCK E SMALL PLBG&HTG INC11/07/2025
DOB NOWCurb CutSigned-offFANG YE11/07/2025
DOB NOWStructuralPermit IssuedFANG YE04/24/2025
DOB NOWConstruction FenceSigned-offFANG YE04/08/2025
DOB NOWSolarSigned-offACCORD POWER INC09/05/2024
DOB NOWPlumbingSigned-offVILLAGE P & H NY INC07/09/2024
DOB NOWSprinklersSigned-offROCK E SMALL PLBG&HTG INC07/02/2024
DOB NOWGeneral ConstructionPermit IssuedFANG YE05/17/2024
DOB NOWFull DemolitionSigned-offFANG YE04/24/2024
DOB NOWConstruction FenceSigned-offFANG YE03/25/2024
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
02/04/2026Pass-Final CND-Occupancy InspectionPassView ↗
12/03/2025Pass-Final CND-Occupancy InspectionPassView ↗
11/28/2025Pass-Final Curb Cut Non-Directive 14PassView ↗
11/17/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
11/13/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
12/20/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
08/30/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
08/30/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
08/30/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
08/03/2026HVAC-R and service water piping design and insulationBRIAN ILLenergy_progress
08/03/2026Fenestration and door U-factor and product ratingsBRIAN ILLenergy_progress
08/03/2026Ventilation and air distribution systemBRIAN ILLenergy_progress
08/03/2026Interior lighting powerBRIAN ILLenergy_progress
08/03/2026Air barrier — testing BRIAN ILLenergy_progress
08/03/2026Maintenance informationBRIAN ILLenergy_progress
08/03/2026Exterior lighting powerBRIAN ILLenergy_progress
08/03/2026Lighting controlsBRIAN ILLenergy_progress
08/03/2026Fenestration air leakageBRIAN ILLenergy_progress
08/03/2026Permanent certificateBRIAN ILLenergy_progress
08/03/2026Insulation placement and R valuesBRIAN ILLenergy_progress
08/03/2026Air barrier - visual inspectionBRIAN ILLenergy_progress
08/03/2026Fenestration areasBRIAN ILLenergy_progress
08/03/2026Duct leakage testing, insulation and designBRIAN ILLenergy_progress
08/03/2026MeteringBRIAN ILLenergy_progress
08/03/2026HVAC-R and service water heating system controlsBRIAN ILLenergy_progress
08/03/2026Electric vehicle service equipment requirementsBRIAN ILLenergy_progress
08/03/2026HVAC-R and service water heating equipmentBRIAN ILLenergy_progress
08/03/2026FinalBRIAN ILLprogress
08/03/2026Fire-Resistance Rated ConstructionBRIAN ILLprogress
08/03/2026Structural Wood FrameBRIAN ILLprogress
08/03/2026Footing and FoundationBRIAN ILLprogress
08/03/2026Energy Code Compliance InspectionsBRIAN ILLprogress
08/03/2026Concrete - Cast-In-PlaceBRIAN ILLspecial
08/03/2026Structural Steel - WeldingBRIAN ILLspecial
Latest 25 of 150.
▾Documents — 111 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch11
08/24/2026Q00928994-I1Request digital key ↗
08/24/2026Q00942546-P4Request digital key ↗
08/24/2026Q00942546-S5Request digital key ↗
Showing 3 of 11 on file for this type
▸Applications & Permits2
▸BISBPP-5 - Authorization to the Department of Transportation1
12/05/2024440821327Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
12/05/2024440821327Open ↗
▸Zoning, Tax Lot & Property Records8
▸DOB NOWZD1: DOB Zoning Diagram4
08/24/2026Q00942546-P5Open ↗
08/24/2026Q00942546-I1Open ↗
08/24/2026Q00942546-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWZoning Exhibit form (1-5)3
08/24/2026Q00942546-P5Open ↗
08/24/2026Q00942546-I1Open ↗
08/13/2026Q00942546-P4Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/24/2026Q00942546-I1Open ↗
▸Seals & Professional Certifications46
▸DOB NOWSpecial Inspector Seal & Signature18
09/23/2026Q00942546-P5Open ↗
09/23/2026Q00942546-P5Open ↗
09/23/2026Q00942546-P5Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWProgress Inspector Seal & Signature15
09/23/2026Q00942546-P5Open ↗
09/01/2026Q00942546-S3Open ↗
09/01/2026Q00942546-S3Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature11
08/24/2026Q00928994-I1Open ↗
08/24/2026Q00942546-P5Open ↗
08/24/2026Q00942546-P1Open ↗
Showing 3 of 11 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
12/05/2024440821327Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
12/05/2024440821327Open ↗
▸Trade Schedules & Equipment7
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)3
08/24/2026Q00942546-P1Open ↗
08/24/2026Q00942546-I1Open ↗
08/13/2026Q00942546-P4Open ↗
▸DOB NOWWater Cut-Off1
08/13/2026Q00928994-I1Open ↗
▸DOB NOWSewer Cut-Off1
08/13/2026Q00928994-I1Open ↗
▸DOB NOWElectric Cut-Off1
08/13/2026Q00928994-I1Open ↗
▸DOB NOWGas Cut-Off1
08/13/2026Q00928994-I1Open ↗
▸Safety & Tenant Protection8
▸DOB NOWStreet Tree Checklist4
08/24/2026Q00942546-P5Open ↗
08/24/2026Q00942546-P1Open ↗
08/24/2026Q00942546-I1Open ↗
Showing 3 of 4 on file for this type
▸BISSTREET TREE CHECKLIST1
12/05/2024440821327Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026Q00942546-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/24/2026Q00942546-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/24/2026Q00942546-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/24/2026Q00928994-I1Open ↗
▸DOB NOWRodent Control1
08/13/2026Q00928994-I1Open ↗
▸Inspections & Test Reports5
▸DOB NOWSOIL REPORT4
08/24/2026Q00942546-P5Open ↗
08/24/2026Q00942546-P1Open ↗
08/24/2026Q00942546-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026Q00942546-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026Q01104711-I1Open ↗
▸Filing & Intake Forms2
▸BISEFILING JOB APPLICATION COVER SHEET1
12/05/2024440821327Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
12/05/2024440821327Open ↗
▸Other Documents19
▸DOB NOWProperty Ownership Certification5
08/24/2026Q00928994-I1Open ↗
08/24/2026Q00942546-P5Open ↗
08/24/2026Q00942546-P1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSite Survey: Initial4
08/24/2026Q00942546-P5Open ↗
08/24/2026Q00942546-P1Open ↗
08/24/2026Q00942546-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone4
08/24/2026Q00942546-P5Open ↗
08/24/2026Q00942546-P1Open ↗
08/24/2026Q00942546-I1Open ↗
Showing 3 of 4 on file for this type
▸BISBPP - SUPPORTING DOCUMENTATION1
12/05/2024440821327Open ↗
▸DOB NOWCommunity Board Notification1
08/13/2026Q00928994-I1Open ↗
▸DOB NOWStructure Photographs1
08/13/2026Q00928994-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q00942546-I1Open ↗
▸DOB NOWFull Demo: 10-Day Notice1
08/13/2026Q00928994-I1Open ↗
▸DOB NOWFinal Survey1
08/24/2026Q00942546-I1Open ↗