Two family frame
145
QUEENS · BIN 4623696
💬 Discuss this project
2022Year Built
2Stories
B2Building Class
R3-2Zoning
2,382 sfGross Floor Area
2Units
Two family frame · 4,000 sf lot · 0.6 FAR built · Flood zone X500
Locations of Work
ArchitecturePlumbing
Floor 215p · 1 filing · 20 docs
Floor 114p · 1 filing · 20 docs
Cellar15p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
MYRTLE DEVELOPMENT2007/08/2026
NYC 21 LLC103/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
11/03/2022$1.3M—NYC 21 LLC → Private party$560/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PIROOZ ENGINEERING, P.C.710/05/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ROYAL T E1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NCR CONSTRUCTION INCGeneral Contractor507/08/2026
METROPOLITAN ELEC OF NY IElectrical103/22/2026
BT'S PLUMBING AND HEATINGPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PIROOZ ENGINEERING P.C7177510/05/2022
TRIANGLE INSPECTION & TES7495208/03/2022
Building Lifecycle
All (64)Filed (7)Permit Issued (4)Signed Off (3)Inspection (12)Objection (8)Special Inspection (30)
12/15/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
10/12/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
PIROOZ SOLTANIZADEH
10/12/2022
Special inspection requirement — Concrete - Cast-In-Place
PIROOZ SOLTANIZADEH
10/12/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
PIROOZ SOLTANIZADEH
10/12/2022
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
PIROOZ SOLTANIZADEH
10/12/2022
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
PIROOZ SOLTANIZADEH
10/12/2022
Special inspection requirement — Metering
PIROOZ SOLTANIZADEH
10/12/2022
Special inspection requirement — Fire-Resistance Rated Construction
PIROOZ SOLTANIZADEH
10/12/2022
Special inspection requirement — Energy Code Compliance Inspections
PIROOZ SOLTANIZADEH
10/12/2022
Special inspection requirement — Air barrier - visual inspection
PIROOZ SOLTANIZADEH
10/12/2022
Special inspection requirement — Subgrade Inspections
PIROOZ SOLTANIZADEH
10/12/2022
Special inspection requirement — Chimneys and vents
PIROOZ SOLTANIZADEH
10/12/2022
Special inspection requirement — Fenestration air leakage
PIROOZ SOLTANIZADEH
10/12/2022
Special inspection requirement — Interior lighting power
PIROOZ SOLTANIZADEH
10/12/2022
Special inspection requirement — Masonry
PIROOZ SOLTANIZADEH
10/12/2022
Special inspection requirement — Insulation placement and R values
PIROOZ SOLTANIZADEH
10/12/2022
Special inspection requirement — Electric vehicle service equipment requirements
PIROOZ SOLTANIZADEH
10/12/2022
Special inspection requirement — Air barrier — testing
PIROOZ SOLTANIZADEH
10/12/2022
Special inspection requirement — Permanent certificate
PIROOZ SOLTANIZADEH
10/12/2022
Special inspection requirement — Fenestration and door U-factor and product ratings
PIROOZ SOLTANIZADEH
10/12/2022
Special inspection requirement — Fenestration areas
PIROOZ SOLTANIZADEH
10/12/2022
Special inspection requirement — Maintenance information
PIROOZ SOLTANIZADEH
10/05/2022
Filed — New Building
PPROPOSE NEW 2 STORY, TWO FAMILY DWELLING FRAME BUILDING WITH CELLAR.
Q00517519-P2
10/05/2022
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
PIROOZ SOLTANIZADEH
10/05/2022
Special inspection requirement — Masonry
PIROOZ SOLTANIZADEH
10/05/2022
Special inspection requirement — Subgrade Inspections
PIROOZ SOLTANIZADEH
10/05/2022
Special inspection requirement — Concrete - Cast-In-Place
PIROOZ SOLTANIZADEH
10/05/2022
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
PIROOZ SOLTANIZADEH
10/05/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
PIROOZ SOLTANIZADEH
10/05/2022
Special inspection requirement — Energy Code Compliance Inspections
PIROOZ SOLTANIZADEH
10/05/2022
Special inspection requirement — Chimneys and vents
PIROOZ SOLTANIZADEH
10/05/2022
Special inspection requirement — Fire-Resistance Rated Construction
PIROOZ SOLTANIZADEH
09/28/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/09/2022
Signed off — Alteration
PLUMBING JOB FILED IN CONJUNCTION WITH NEW BUILDING APPLICATION # Q00517519
Q00576013-I1
08/29/2022
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
08/29/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
08/26/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/19/2022
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
08/16/2022
Signed off — Alteration
Q00655660-I1
08/15/2022
Signed off — Alteration
CURB CUT APPLICATION FILED IN CONJUNCTION WITH NB JOB # Q00517519
Q00576026-I1
08/15/2022
Inspection — Pass-Final Fence Non-Directive 14
Pass
View inspection ↗
08/11/2022
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
08/09/2022
Objection raised — Scope
08/09/2022
Objection resolved — Addressed
08/04/2022
Permit issued — Curb Cut
Q00576026-I1-CC
08/03/2022
Filed — Alteration
PLUMBING JOB FILED IN CONJUNCTION WITH NEW BUILDING APPLICATION # Q00517519
Q00576013-P1
08/02/2022
Filed — New Building
PPROPOSE NEW 2 STORY, TWO FAMILY DWELLING FRAME BUILDING WITH CELLAR.
Q00517519-P1
06/29/2022
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
05/20/2022
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
05/05/2022
Permit issued — Plumbing
Q00576013-I1-PL
03/17/2022
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
03/17/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/28/2022
Permit issued — General Construction
Q00517519-I1-GC
01/08/2022
Filed — Alteration
PLUMBING JOB FILED IN CONJUNCTION WITH NEW BUILDING APPLICATION # Q00517519
Q00576013-I1
01/05/2022
Permit issued — Construction Fence
Q00655660-I1-FN
01/01/2022
Filed — Alteration
Q00655660-I1
01/01/2022
Filed — Alteration
CURB CUT APPLICATION FILED IN CONJUNCTION WITH NB JOB # Q00517519
Q00576026-I1
08/20/2021
Objection raised — Inspections
08/20/2021
Objection resolved — Addressed
08/18/2021
Objection raised — Energy
Latest 60 of 64 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offNCR CONSTRUCTION INC08/04/2022
DOB NOWPlumbingSigned-offBT'S PLUMBING AND HEATING05/05/2022
DOB NOWGeneral ConstructionPermit IssuedNCR CONSTRUCTION INC01/28/2022
DOB NOWConstruction FenceSigned-offNCR CONSTRUCTION INC01/05/2022
1 project · most recent 04/28/2022
General Wiring
FiledStatusContractorScope
04/28/2022CompleteMETROPOLITAN ELEC OF NY IGeneral Wiring
▾Field Inspections (DOB CAP) — 12
DateTypeResultReport
12/15/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/28/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/29/2022Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
08/29/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/26/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/19/2022Pass-Final CND-Occupancy InspectionPassView ↗
08/15/2022Pass-Final Fence Non-Directive 14PassView ↗
08/11/2022Pass-Final Curb Cut Non-Directive 14PassView ↗
06/29/2022Fail-Final PL - Up to 3 Requested FloorsFailView ↗
05/20/2022Pass-Final PL - Up to 9 Requested FloorsPassView ↗
03/17/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
03/17/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 70
DateRequirementInspectorRole
10/12/2022Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationPIROOZ SOLTANIZADEHspecial
10/12/2022Subgrade InspectionsPIROOZ SOLTANIZADEHspecial
10/12/2022Chimneys and ventsPIROOZ SOLTANIZADEHspecial
10/12/2022Fire-Resistant Penetrations and JointsPIROOZ SOLTANIZADEHspecial
10/12/2022Concrete - Cast-In-PlacePIROOZ SOLTANIZADEHspecial
10/12/2022MasonryPIROOZ SOLTANIZADEHspecial
10/12/2022Excavations - Sheeting, Shoring, and BracingPIROOZ SOLTANIZADEHspecial
10/12/2022Fire-Resistance Rated ConstructionPIROOZ SOLTANIZADEHprogress
10/12/2022Energy Code Compliance InspectionsPIROOZ SOLTANIZADEHprogress
10/12/2022Air barrier - visual inspectionPIROOZ SOLTANIZADEHenergy_progress
10/12/2022Maintenance informationPIROOZ SOLTANIZADEHenergy_progress
10/12/2022MeteringPIROOZ SOLTANIZADEHenergy_progress
10/12/2022Interior lighting powerPIROOZ SOLTANIZADEHenergy_progress
10/12/2022Fenestration air leakagePIROOZ SOLTANIZADEHenergy_progress
10/12/2022HVAC-R and service water piping design and insulationPIROOZ SOLTANIZADEHenergy_progress
10/12/2022Insulation placement and R valuesPIROOZ SOLTANIZADEHenergy_progress
10/12/2022Electric vehicle service equipment requirementsPIROOZ SOLTANIZADEHenergy_progress
10/12/2022Air barrier — testing PIROOZ SOLTANIZADEHenergy_progress
10/12/2022Permanent certificatePIROOZ SOLTANIZADEHenergy_progress
10/12/2022Fenestration and door U-factor and product ratingsPIROOZ SOLTANIZADEHenergy_progress
10/12/2022Fenestration areasPIROOZ SOLTANIZADEHenergy_progress
10/05/2022Interior lighting powerPIROOZ SOLTANIZADEHenergy_progress
10/05/2022Chimneys and ventsPIROOZ SOLTANIZADEHspecial
10/05/2022Concrete - Cast-In-PlacePIROOZ SOLTANIZADEHspecial
10/05/2022Excavations - Sheeting, Shoring, and BracingPIROOZ SOLTANIZADEHspecial
Latest 25 of 70.
▾Documents — 66 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/26/2026Q00655660-I1Request digital key ↗
08/26/2026Q00576026-I1Request digital key ↗
08/26/2026Q00576013-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸Applications & Permits3
▸BISPLAN / WORK APPROVAL APPLICATION2
11/04/2021440692993Open ↗
10/23/2021440692993Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation1
07/09/2022440692993Open ↗
▸Zoning, Tax Lot & Property Records4
▸DOB NOWZD1: DOB Zoning Diagram3
08/13/2026Q00517519-P2Open ↗
08/13/2026Q00517519-P1Open ↗
08/13/2026Q00517519-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q00517519-I1Open ↗
▸Seals & Professional Certifications28
▸DOB NOWProgress Inspector Seal & Signature11
09/22/2026Q00576013-P1Open ↗
09/22/2026Q00576013-P1Open ↗
09/01/2026Q00517519-P2Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
09/22/2026Q00576013-P1Open ↗
09/22/2026Q00576013-P1Open ↗
09/01/2026Q00517519-P2Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/26/2026Q00655660-I1Open ↗
08/26/2026Q00576026-I1Open ↗
08/26/2026Q00576013-I1Open ↗
Showing 3 of 7 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
10/23/2021440692993Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
10/23/2021440692993Open ↗
▸Trade Schedules & Equipment4
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)3
08/13/2026Q00517519-P2Open ↗
08/13/2026Q00517519-I1Open ↗
08/13/2026Q00517519-P1Open ↗
▸DOB NOWStandpipe Alarms Drawings1
08/15/2026Q00517519-I1—
▸Safety & Tenant Protection8
▸DOB NOWStreet Tree Checklist3
08/13/2026Q00517519-I1Open ↗
08/13/2026Q00517519-P2Open ↗
08/13/2026Q00517519-P1Open ↗
▸BISSTREET TREES SITE PLAN1
08/17/2022440692993Open ↗
▸BISSTREET TREE CHECKLIST1
02/17/2022440692993Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026Q00517519-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026Q00517519-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026Q00517519-I1Open ↗
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026Q00517519-I1Open ↗
08/13/2026Q00576013-I1Open ↗
▸Approvals, Objections & Sign-offs2
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff1
08/23/2022440692993Open ↗
▸BISDOB APPROVAL FOR NEW CC1
02/17/2022440692993Open ↗
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
10/23/2021440692993Open ↗
▸Other Documents7
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/13/2026Q00517519-P1Open ↗
08/13/2026Q00517519-I1Open ↗
08/13/2026Q00517519-P2Open ↗
▸DOB NOWSite Survey: Initial2
08/13/2026Q00517519-P1Open ↗
08/13/2026Q00517519-P2Open ↗
▸BISBPP: PHOTOS-SIGNED/SEALED BY APPLICANT1
02/17/2022440692993Open ↗
▸DOB NOWFinal Survey1
08/13/2026Q00517519-I1Open ↗