← Back
Two stories - detached, small or mid-size
145-49 115 AVENUE
QUEENS · BIN 4259381
💬 Discuss this project
1925Year Built
2.5Stories
A1Building Class
R3AZoning
1,568 sfGross Floor Area
1Units
Rent Stabilized19 Open Violations ▸FDNY Report ↗
Two stories - detached, small or mid-size · Owner of record: 145-49 195TH AVE CORP. · 2,500 sf lot · 0.63 FAR built · Flood zone X
Locations of Work
StructuralPlumbing
Floor 27p · 2 filings · 20 docs
Floor 16p · 1 filing · 20 docs
Cellar8p · 2 filings · 20 docs
1 job · most recent 04/10/2026
Gas Water/Sanitary
FiledStatusContractorScope
04/10/2026Signed-offM & M PIPING AND HEATINGGas, Water/Sanitary
1 job · most recent 09/05/2025
General Wiring
FiledStatusContractorScope
09/05/2025CompleteINFINITI ELECTRIC CORPGeneral Wiring
1 job · most recent 03/03/2026
Wood
FiledStatusContractorScope
03/03/2026Permit IssuedTASLIM CONSTRUCTION INCWood
Building Lifecycle
All (66)Filed (5)Permit Issued (2)Signed Off (1)Violation (26)Inspection (7)Objection (10)Special Inspection (15)
08/28/2026
Signed off — Alteration
Convert one (1) to two (2) family dwelling unit with related plumbing work. Install new 3-fixture bathroom in cellar and new kitchen in 2nd floor and replace existing plumbing fixtures.
Q01290883-I1
07/29/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/11/2026
Objection resolved — Addressed
06/11/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
KARTIK CHANDA
06/11/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
KARTIK CHANDA
06/11/2026
Special inspection requirement — Energy Code Compliance Inspections
KARTIK CHANDA
06/11/2026
Special inspection requirement — Final
KARTIK CHANDA
06/11/2026
Special inspection requirement — Electric vehicle service equipment requirements
KARTIK CHANDA
06/11/2026
Special inspection requirement — Insulation placement and R values
KARTIK CHANDA
06/11/2026
Special inspection requirement — Fenestration areas
KARTIK CHANDA
06/11/2026
Special inspection requirement — Air barrier - visual inspection
KARTIK CHANDA
06/11/2026
Special inspection requirement — Fenestration air leakage
KARTIK CHANDA
06/11/2026
Special inspection requirement — Interior lighting power
KARTIK CHANDA
06/11/2026
Special inspection requirement — Metering
KARTIK CHANDA
06/11/2026
Special inspection requirement — Permanent certificate
KARTIK CHANDA
06/11/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
KARTIK CHANDA
05/03/2026
Objection resolved — Addressed
05/03/2026
Objection resolved — Addressed
05/03/2026
Objection resolved — Addressed
05/03/2026
Objection resolved — Addressed
04/20/2026
Objection raised — Cost
04/19/2026
Objection raised — Zoning
04/19/2026
Objection raised — Admin
04/19/2026
Objection raised — Other
04/19/2026
Objection raised — Mechanical
04/14/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
KARTIK CHANDA
04/10/2026
Filed — Alteration
Convert one (1) to two (2) family dwelling unit with related plumbing work. Install new 3-fixture bathroom in cellar and new kitchen in 2nd floor and replace existing plumbing fixtures.
Q01290883-P2
04/10/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
KARTIK CHANDA
03/17/2026
Filed — Alteration
Convert one (1) to two (2) family dwelling unit with related plumbing work. Install new 3-fixture bathroom in cellar and new kitchen in 2nd floor and replace existing plumbing fixtures.
Q01290883-P1
03/03/2026
Filed — Alteration CO
CONVERSION FROM 1 FAMILY TO 2 FAMILY, STRENGTHEN STRUCTURAL SUPPORT AND INTERIOR RENOVATION AS PER PLAN.
Q01156765-P1
02/18/2026
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
01/23/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/25/2025
Violation issued (HPD, open)
I
10/29/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
10/29/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/29/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
10/15/2025
Permit issued — Plumbing
Q01290883-I1-PL
09/24/2025
Filed — Alteration
Convert one (1) to two (2) family dwelling unit with related plumbing work. Install new 3-fixture bathroom in cellar and new kitchen in 2nd floor and replace existing plumbing fixtures.
Q01290883-I1
08/12/2025
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
08/04/2025
Permit issued — Structural
Q01156765-I1-GC-CX
01/09/2025
Filed — Alteration CO
CONVERSION FROM 1 FAMILY TO 2 FAMILY, STRENGTHEN STRUCTURAL SUPPORT AND INTERIOR RENOVATION AS PER PLAN.
Q01156765-I1
12/05/2024
Violation issued (HPD, open)
I
11/30/2023
Violation issued (HPD, open)
I
11/18/2022
Violation issued (HPD, open)
I
09/14/2022
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/17/2022
Violation issued (HPD, open)
I
10/13/2021
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
07/02/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/02/2021
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
07/01/2021
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/21/2021
Violation issued (HPD, open)
I
11/08/2019
Violation issued (HPD, open)
I
07/16/2019
Violation issued (DOB, closed)
V%-DOB VIOLATION
11/01/2018
Violation issued (HPD, closed)
I
03/28/2016
Violation issued (HPD, closed)
C
03/22/2016
Violation issued (HPD, open)
I
01/06/2016
Violation issued (HPD, open)
C
01/06/2016
Violation issued (HPD, open)
C
12/18/2015
Violation issued (HPD, open)
C
12/04/2015
Violation issued (HPD, open)
B
Latest 60 of 66 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
TASLIM CONSTRUCTION1208/29/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
03/06/2024$200K—Private party → 145-49 195TH AVE CORP.$128/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CHANDA ENGINEERING CONSULTANT PC304/10/2026
SAFIYA CONSULTANTS INC203/03/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TASLIM CONSTRUCTION INCGeneral Contractor203/21/2026
M & M PIPING AND HEATINGPlumbing106/28/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CHANDA ENG. CONSULTANT PC6842504/10/2026
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offM & M PIPING AND HEATING10/15/2025
DOB NOWStructuralPermit IssuedTASLIM CONSTRUCTION INC08/04/2025
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
07/29/2026Pass-Final CND-Occupancy InspectionPassView ↗
02/18/2026Fail-Final CND-Occupancy InspectionFailView ↗
01/23/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/29/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
10/29/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/29/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
08/12/2025Pass-Final Curb Cut Non-Directive 14PassView ↗
▾Special Inspection Requirements (DOB NOW) — 15
DateRequirementInspectorRole
06/11/2026Fire-Resistant Penetrations and JointsKARTIK CHANDAspecial
06/11/2026Structural Stability – Alterations of existing buildingsKARTIK CHANDAspecial
06/11/2026Energy Code Compliance InspectionsKARTIK CHANDAprogress
06/11/2026FinalKARTIK CHANDAprogress
06/11/2026Electric vehicle service equipment requirementsKARTIK CHANDAenergy_progress
06/11/2026Insulation placement and R valuesKARTIK CHANDAenergy_progress
06/11/2026Fenestration areasKARTIK CHANDAenergy_progress
06/11/2026Air barrier - visual inspectionKARTIK CHANDAenergy_progress
06/11/2026Fenestration air leakageKARTIK CHANDAenergy_progress
06/11/2026Interior lighting powerKARTIK CHANDAenergy_progress
06/11/2026MeteringKARTIK CHANDAenergy_progress
06/11/2026Permanent certificateKARTIK CHANDAenergy_progress
06/11/2026Fenestration and door U-factor and product ratingsKARTIK CHANDAenergy_progress
04/14/2026Fire-Resistant Penetrations and JointsKARTIK CHANDAspecial
04/10/2026Fire-Resistant Penetrations and JointsKARTIK CHANDAspecial
▾Documents — 37 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/17/2026Q01156765-I1Request digital key ↗
08/17/2026Q01290883-P1Request digital key ↗
08/17/2026Q01290883-P2Request digital key ↗
Showing 3 of 5 on file for this type
▸Zoning, Tax Lot & Property Records2
▸DOB NOWHouse Number Verification: TOPO Stamp2
08/13/2026Q01156765-P1Open ↗
08/13/2026Q01156765-I1Open ↗
▸Seals & Professional Certifications20
▸DOB NOWProgress Inspector Seal & Signature11
08/22/2026Q01156765-I1Open ↗
08/22/2026Q01156765-I1Open ↗
08/22/2026Q01156765-I1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/17/2026Q01156765-I1Open ↗
08/17/2026Q01156765-P1Open ↗
08/17/2026Q01290883-P2Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
08/25/2026Q01290883-P2Open ↗
08/22/2026Q01156765-I1Open ↗
08/22/2026Q01156765-I1Open ↗
Showing 3 of 4 on file for this type
▸Safety & Tenant Protection3
▸DOB NOWStreet Tree Checklist2
08/17/2026Q01156765-I1Open ↗
08/15/2026Q01156765-P1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026Q01156765-I1Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/17/2026Q01156765-I1Open ↗
08/17/2026Q01290883-P2Open ↗
08/17/2026Q01290883-P1Open ↗
Showing 3 of 5 on file for this type
▸Other Documents2
▸DOB NOWProperty Ownership Certification2
08/17/2026Q01156765-I1Open ↗
08/15/2026Q01156765-P1Open ↗