← Back
Two stories - detached, small or mid-size
145-70 4 AVENUE
QUEENS · BIN 4101392
💬 Discuss this project
1950Year Built
2Stories
A1Building Class
R2AZoning
2,370 sfGross Floor Area
1Units
0 Open Violations
Two stories - detached, small or mid-size · 4,100 sf lot · 0.58 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralCivilGeneral
Floor 224p · 1 filing · 20 docs
Floor 123p · 1 filing · 20 docs
Cellar25p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
TRI CITY CONSTRUCTION COR303/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
07/05/2017$592K—Private party → Private party$250/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
FRANK PETRUSO ARCHITECT PC908/07/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
FRANK PETRUSORA AOL COM803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TRI CITY CONSTRUCTION CORGeneral Contractor1807/08/2026
PARAMOUNT PLBG & HTG CORPPlumbing307/08/2026
WATERWORKS PLUMBING MECHPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
FRANK PETRUSO ARCHITECT,P993608/07/2026
Building Lifecycle
All (45)Filed (8)Permit Issued (12)Signed Off (2)Violation (3)Inspection (8)Objection (12)
08/07/2026
Filed — Alteration CO
CONSTRUCT SECOND FLOOR VERTICAL ADDITION, GUT RENOVATION OF EXISTING DWELLING TO INCLUDE NEW KITCHEN AND BATHROOMS.
Q00563311-P6
05/14/2026
Filed — Alteration CO
CONSTRUCT SECOND FLOOR VERTICAL ADDITION, GUT RENOVATION OF EXISTING DWELLING TO INCLUDE NEW KITCHEN AND BATHROOMS.
Q00563311-P5
08/26/2025
Signed off — Alteration
INSTALLATION OF NEW PLUMBING FIXTURES/PIPING AND REMOVAL OF EXISTING PLUMBING FIXTURES/ PIPING.
Q00647418-I1
05/22/2025
Filed — Alteration
INSTALLATION OF NEW PLUMBING FIXTURES/PIPING AND REMOVAL OF EXISTING PLUMBING FIXTURES/ PIPING.
Q00647418-P1
05/06/2025
Permit issued — Plumbing
Q00647418-I1-PL
03/07/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/06/2025
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
01/22/2025
Permit issued — Plumbing
Q00647418-I1-PL
12/11/2024
Objection resolved — Addressed
12/10/2024
Objection raised — Other
11/27/2024
Filed — Alteration CO
CONSTRUCT SECOND FLOOR VERTICAL ADDITION, GUT RENOVATION OF EXISTING DWELLING TO INCLUDE NEW KITCHEN AND BATHROOMS.
Q00563311-P3
11/13/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
11/13/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
10/24/2024
Signed off — Alteration
Q00647341-I1
09/16/2024
Permit issued — Construction Fence
Q00647341-I1-FN
09/16/2024
Permit issued — General Construction
Q00563311-I1-GC-CX
08/02/2023
Permit issued — Foundation
Q00563311-I1-GC-CX
08/02/2023
Permit issued — Construction Fence
Q00647341-I1-FN
04/17/2023
Permit issued — Plumbing
Q00647418-I1-PL
02/16/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
02/16/2023
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
02/16/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/16/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
12/19/2022
Permit issued — Construction Fence
Q00647341-I1-FN
12/09/2022
Permit issued — Foundation
Q00563311-I1-GC-CX
06/14/2022
Permit issued — Plumbing
Q00647418-I1-PL
03/18/2022
Violation issued (ECB, closed)
Construction
01/05/2022
Violation issued (ECB, closed)
Construction
12/15/2021
Filed — Alteration
INSTALLATION OF NEW PLUMBING FIXTURES/PIPING AND REMOVAL OF EXISTING PLUMBING FIXTURES/ PIPING.
Q00647418-I1
12/15/2021
Permit issued — Construction Fence
Q00647341-I1-FN
12/14/2021
Filed — Alteration
Q00647341-I1
12/14/2021
Violation issued (ECB, closed)
Unknown
11/29/2021
Permit issued — Earth Work
Q00563311-I1-GC-CX
11/19/2021
Filed — Alteration CO
CONSTRUCT SECOND FLOOR VERTICAL ADDITION, GUT RENOVATION OF EXISTING DWELLING TO INCLUDE NEW KITCHEN AND BATHROOMS.
Q00563311-P1
09/03/2021
Objection resolved — Addressed
08/25/2021
Objection resolved — Addressed
08/25/2021
Objection resolved — Addressed
08/25/2021
Objection resolved — Addressed
08/16/2021
Objection resolved — Addressed
08/11/2021
Objection raised — Zoning
08/11/2021
Objection raised — Zoning
08/11/2021
Objection raised — Admin
08/11/2021
Objection raised — Scope
08/11/2021
Objection raised — Energy
08/05/2021
Filed — Alteration CO
CONSTRUCT SECOND FLOOR VERTICAL ADDITION, GUT RENOVATION OF EXISTING DWELLING TO INCLUDE NEW KITCHEN AND BATHROOMS.
Q00563311-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offPARAMOUNT PLBG & HTG CORP05/06/2025
DOB NOWPlumbingSigned-offPARAMOUNT PLBG & HTG CORP01/22/2025
DOB NOWConstruction FenceSigned-offTRI CITY CONSTRUCTION COR09/16/2024
DOB NOWGeneral ConstructionPermit IssuedTRI CITY CONSTRUCTION COR09/16/2024
DOB NOWFoundationPermit IssuedTRI CITY CONSTRUCTION COR08/02/2023
DOB NOWConstruction FenceSigned-offTRI CITY CONSTRUCTION COR08/02/2023
DOB NOWPlumbingSigned-offPARAMOUNT PLBG & HTG CORP04/17/2023
DOB NOWConstruction FenceSigned-offTRI CITY CONSTRUCTION COR12/19/2022
DOB NOWFoundationPermit IssuedTRI CITY CONSTRUCTION COR12/09/2022
DOB NOWPlumbingSigned-offWATERWORKS PLUMBING MECH06/14/2022
DOB NOWConstruction FenceSigned-offTRI CITY CONSTRUCTION COR12/15/2021
DOB NOWEarth WorkPermit IssuedTRI CITY CONSTRUCTION COR11/29/2021
1 project · most recent 08/07/2026
Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
08/07/2026Permit IssuedTRI CITY CONSTRUCTION CORAir Conditioning Systems, Heating Systems, Ventilation Systems
Cooling
Trane 4TTR3042E1000NA,4TTR3036N1000BA 30,000 BTU · Condensing Unit ×18
Heating
Navien NCB-240/130H-NG,NCB-240/130H-NG 108,000 BTU · Boiler ×3
Ventilation
Trane TEM4A0C42S41SCA,TEM4A0B36S31SBA 12,000 CFM · Fan Coil Indoor ×3
1 project · most recent 05/20/2022
General Wiring
FiledStatusContractorScope
05/20/2022CompleteJOSEPH WEINSTEIN ELECTRICGeneral Wiring
1 project · most recent 08/07/2026
Wood
FiledStatusContractorScope
08/07/2026Permit IssuedTRI CITY CONSTRUCTION CORWood
1 project · most recent 08/07/2026
Earthwork
FiledStatusContractorScope
08/07/2026Permit IssuedTRI CITY CONSTRUCTION COREarthwork
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
03/07/2025Pass-Final CND-Occupancy InspectionPassView ↗
03/06/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
11/13/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
11/13/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
02/16/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
02/16/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
02/16/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/16/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 107
DateRequirementInspectorRole
08/24/2026HVAC-R and service water heating system controlsFrank Petrusoenergy_progress
08/24/2026Wood – Prefabricated I-JoistsFrank Petrusospecial
08/24/2026Structural Stability – Alterations of existing buildingsFrank Petrusospecial
08/24/2026Fire-Resistant Penetrations and JointsFrank Petrusospecial
08/24/2026Concrete - Cast-In-PlaceFrank Petrusospecial
08/24/2026Mechanical SystemsFrank Petrusospecial
08/24/2026MasonryFrank Petrusospecial
08/24/2026Heating SystemsFrank Petrusospecial
08/24/2026Structural Steel - DetailsFrank Petrusospecial
08/24/2026Structural Wood FrameFrank Petrusoprogress
08/24/2026Fire-Resistance Rated ConstructionFrank Petrusoprogress
08/24/2026Energy Code Compliance InspectionsFrank Petrusoprogress
08/24/2026FinalFrank Petrusoprogress
08/24/2026Footing and FoundationFrank Petrusoprogress
08/24/2026Fenestration and door U-factor and product ratingsFrank Petrusoenergy_progress
08/24/2026Interior lighting powerFrank Petrusoenergy_progress
08/24/2026HVAC-R and service water heating equipmentFrank Petrusoenergy_progress
08/24/2026HVAC-R and service water piping design and insulationFrank Petrusoenergy_progress
08/24/2026Fenestration air leakageFrank Petrusoenergy_progress
08/24/2026Insulation placement and R valuesFrank Petrusoenergy_progress
08/24/2026Air barrier — testing Frank Petrusoenergy_progress
08/05/2026Concrete - Cast-In-PlaceFrank Petrusospecial
08/05/2026HVAC-R and service water heating system controlsFrank Petrusoenergy_progress
08/05/2026Interior lighting powerFrank Petrusoenergy_progress
08/05/2026Fenestration and door U-factor and product ratingsFrank Petrusoenergy_progress
Latest 25 of 107.
▾Documents — 85 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
08/27/2026Q00563311-P6Request digital key ↗
08/27/2026Q00563311-I1Request digital key ↗
08/26/2026Q00647341-I1Request digital key ↗
Showing 3 of 9 on file for this type
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION2
12/09/2025421520385Open ↗
07/05/2017421520385Open ↗
▸Zoning, Tax Lot & Property Records9
▸DOB NOWZD1: DOB Zoning Diagram6
08/16/2026Q00563311-P5Open ↗
08/16/2026Q00563311-P6Open ↗
08/13/2026Q00563311-P4Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWZoning Exhibit form (1-5)2
08/27/2026Q00563311-I1Open ↗
08/16/2026Q00563311-P6Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q00563311-I1Open ↗
▸Seals & Professional Certifications27
▸DOB NOWProgress Inspector Seal & Signature14
09/23/2026Q00563311-P4Open ↗
08/28/2026Q00563311-P1Open ↗
08/28/2026Q00563311-P4Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/16/2026Q00563311-P5Open ↗
08/16/2026Q00563311-P4Open ↗
08/16/2026Q00563311-P3Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/23/2026Q00563311-P4Open ↗
08/28/2026Q00563311-P1Open ↗
08/25/2026Q00563311-I1Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
07/05/2017421520385Open ↗
▸Safety & Tenant Protection2
▸DOB NOWStreet Tree Checklist1
08/16/2026Q00563311-P1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026Q00563311-I1Open ↗
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/16/2026Q00563311-P1Open ↗
08/16/2026Q00563311-P5Open ↗
08/16/2026Q00563311-P4Open ↗
Showing 3 of 6 on file for this type
▸Energy Compliance3
▸DOB NOWEN2: As Built Energy Analysis2
08/13/2026Q00647418-I1Open ↗
08/13/2026Q00563311-I1Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
07/05/2017421520385Open ↗
▸Approvals, Objections & Sign-offs1
▸BISSCHEDULE A - OCCUPANCY / USE1
07/05/2017421520385Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
07/05/2017421520385Open ↗
▸Other Documents25
▸DOB NOWPlot Diagram6
08/16/2026Q00563311-P5Open ↗
08/16/2026Q00563311-P6Open ↗
08/13/2026Q00563311-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSURVEY: INITIAL6
08/16/2026Q00563311-P5Open ↗
08/16/2026Q00563311-P6Open ↗
08/13/2026Q00563311-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone6
08/16/2026Q00563311-P5Open ↗
08/16/2026Q00563311-P6Open ↗
08/13/2026Q00563311-P4Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSite Survey: Initial5
08/16/2026Q00563311-P5Open ↗
08/16/2026Q00563311-P6Open ↗
08/13/2026Q00563311-P4Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q00563311-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026Q00563311-I1Open ↗