← Back
Two stories - detached, small or mid-size
145 BEACH 139 STREET
💬 Discuss this project
1930Year Built
2Stories
A1Building Class
R2Zoning
3,386 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · Owner of record: 145 BEACH 139 LLC · 6,000 sf lot · 0.56 FAR built · Flood zone AE
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionCivilGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction1 filing · 5 docs
Attic8p · 1 filing · 20 docs
Floor 417p · 3 filings · 20 docs
Floor 314p · 3 filings · 20 docs
Floor 217p · 3 filings · 20 docs
Floor 124p · 4 filings · 20 docs
Cellar5p · 1 filing · 20 docs
Basement8p · 1 filing · 20 docs
Site & exterior4p · 3 filings · 20 docs
Filed — no permit issued1 filing
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SUNSET 3544908/29/2026
N103/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
08/07/2019$998K—Private party → 145 BEACH 139 LLC$295/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MOMENTUM SOLAR106/15/2026
VALENTINO POMPEO ARCHITECT, P.C.901/21/2026
ENGINEERING PROFESSIONAL SERVICE P.202/11/2025
SDG ENGINEERING PC204/13/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
VALENTINO ASSOCIATES203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
VINYL IS FINAL HOME IMPROGeneral Contractor1207/08/2026
SIMPLY STRONG CONSTRUCTGeneral Contractor407/08/2026
J. CAIAZZO PLBG & HTG CORPlumbing307/08/2026
J. CAIAZZO PLBG & HTG CORPFire Protection107/08/2026
BERTOLINI CONTRACTING INCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MXV SIA LLC9281106/15/2026
NORMAN C. LOK818501/21/2026
METRO FIRE CONTROL LLC4538112/01/2021
Building Lifecycle
All (94)Filed (14)Permit Issued (16)Signed Off (5)Inspection (13)Objection (16)Special Inspection (30)
06/24/2026
Permit issued — Solar
Q01417110-I1-SL
06/15/2026
Filed — Alteration
Installation of solar panels, rooftop, grid tied, railed, 20 modules, 8.8 KW
Q01417110-I1
06/15/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Mina Makar
06/15/2026
Special inspection requirement — Final
Mina Makar
06/15/2026
Special inspection requirement — Air barrier - visual inspection
Mina Makar
06/15/2026
Special inspection requirement — Adhesive-Based Solar Pedestal Bonding Systems
Mina Makar
06/15/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Mina Makar
06/15/2026
Special inspection requirement — Energy Code Compliance Inspections
Mina Makar
06/15/2026
Special inspection requirement — Post-installed Anchors
Mina Makar
05/13/2026
Signed off — Alteration
Installation of sprinkler system in conjunction with application Q00483760.
Q00577507-I1
04/29/2026
Signed off — Alteration
Application filed for plumbing and gas fixtures within a modified 4 story, 1 family dwelling
Q00520100-I1
04/01/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/31/2026
Objection resolved — Addressed
03/31/2026
Objection resolved — Addressed
03/31/2026
Special inspection requirement — Ventilation and air distribution system
NORMAN LOK
03/31/2026
Special inspection requirement — Maintenance information
NORMAN LOK
03/31/2026
Special inspection requirement — HVAC-R and service water heating system controls
NORMAN LOK
03/31/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
NORMAN LOK
03/31/2026
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
NORMAN LOK
03/31/2026
Special inspection requirement — Masonry
NORMAN LOK
03/31/2026
Special inspection requirement — Concrete - Cast-In-Place
NORMAN LOK
03/31/2026
Special inspection requirement — Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)
NORMAN LOK
03/31/2026
Special inspection requirement — Mechanical Systems
NORMAN LOK
03/31/2026
Special inspection requirement — Air barrier continuity plan testing
NORMAN LOK
03/31/2026
Special inspection requirement — Lowest Floor Elevation
NORMAN LOK
03/31/2026
Special inspection requirement — Footing and Foundation
NORMAN LOK
03/31/2026
Special inspection requirement — Fenestration air leakage
NORMAN LOK
03/31/2026
Special inspection requirement — Fireplaces
NORMAN LOK
03/31/2026
Special inspection requirement — Permanent certificate
NORMAN LOK
03/31/2026
Special inspection requirement — Protection of exposed foundation insulation
NORMAN LOK
03/31/2026
Special inspection requirement — Lighting in dwelling units
NORMAN LOK
03/31/2026
Special inspection requirement — Fenestration areas
NORMAN LOK
03/31/2026
Special inspection requirement — Metering
NORMAN LOK
03/31/2026
Special inspection requirement — Air barrier — testing
NORMAN LOK
03/31/2026
Special inspection requirement — HVAC-R and service water heating equipment
NORMAN LOK
03/31/2026
Special inspection requirement — Exterior lighting power
NORMAN LOK
03/31/2026
Special inspection requirement — Final
ADITYA DESAI
03/13/2026
Objection resolved — Addressed
02/23/2026
Objection raised — Other
02/17/2026
Signed off — ALT-CO - New Building with Existing Elements to Remain
Application filed for horizontal and vertical enlargement of existing 3 story 1 family dwelling.
Q00483760-S1
02/13/2026
Signed off — Alteration
Q00552317-I1
02/12/2026
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
02/03/2026
Objection resolved — Addressed
02/03/2026
Objection resolved — Addressed
02/01/2026
Objection raised — Other
02/01/2026
Objection raised — Other
02/01/2026
Objection raised — Other
02/01/2026
Objection raised — Other
01/21/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
Application filed for horizontal and vertical enlargement of existing 3 story 1 family dwelling.
Q00483760-P5
01/09/2026
Permit issued — Curb Cut
Q00552317-I1-CC
01/07/2026
Signed off — Alteration
Q00520140-I1
12/29/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
12/11/2025
Objection resolved — Addressed
12/11/2025
Objection resolved — Addressed
11/24/2025
Objection raised — Other
11/24/2025
Objection raised — Site survey detailing building
11/03/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
Application filed for horizontal and vertical enlargement of existing 3 story 1 family dwelling.
Q00483760-P2
10/22/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/08/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/08/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
Latest 60 of 94 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarPermit IssuedMOMENTUM SOLAR06/24/2026
DOB NOWCurb CutSigned-offBERTOLINI CONTRACTING INC01/09/2026
DOB NOWSprinklersSigned-offANTHONY CAIAZZO04/02/2025
DOB NOWPlumbingSigned-offJ. CAIAZZO PLBG & HTG COR04/02/2025
DOB NOWConstruction FenceSigned-offVINYL IS FINAL HOME IMPRO02/24/2025
DOB NOWMechanical SystemsPermit IssuedVINYL IS FINAL HOME IMPRO10/20/2024
DOB NOWPlumbingSigned-offJ. CAIAZZO PLBG & HTG COR08/05/2024
DOB NOWGeneral ConstructionPermit IssuedVINYL IS FINAL HOME IMPRO03/26/2024
DOB NOWConstruction FenceSigned-offVINYL IS FINAL HOME IMPRO03/04/2024
DOB NOWPlumbingSigned-offJ. CAIAZZO PLBG & HTG COR06/09/2023
DOB NOWFoundationSigned-offVINYL IS FINAL HOME IMPRO03/24/2023
DOB NOWGeneral ConstructionPermit IssuedVINYL IS FINAL HOME IMPRO03/06/2023
DOB NOWMechanical SystemsPermit IssuedVINYL IS FINAL HOME IMPRO12/30/2022
DOB NOWConstruction FenceSigned-offVINYL IS FINAL HOME IMPRO12/09/2022
DOB NOWMechanical SystemsPermit IssuedSIMPLY STRONG CONSTRUCT06/15/2022
DOB NOWConstruction FenceSigned-offSIMPLY STRONG CONSTRUCT05/16/2022
1 project · most recent 01/21/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
01/21/2026Permit IssuedVINYL IS FINAL HOME IMPROHeating and Air Conditioning Systems
Heat / Cool
Mitsubishi Electric MXZ-4C36NA3 36,000 BTU · Heat Pump Outdoor ×6
NTXMMX30A132BA 27,600 BTU · Vrf Outdoor ×3
4 projects · most recent 06/15/2026
General Wiring
FiledStatusContractorScope
06/15/2026Permit IssuedISLAND ELECTRIC CORP—
05/08/2025CompleteURBAN TECH ELECTRIC INCGeneral Wiring
03/24/2023CompleteLIMITLESS ELECT RESOURCESGeneral Wiring
06/18/2022CancelledLIMITLESS ELECT RESOURCESGeneral Wiring
1 project · most recent 01/21/2026
FiledStatusContractorScope
01/21/2026Permit IssuedVINYL IS FINAL HOME IMPRO5 scope_items
1 project · most recent 06/15/2026
FiledStatusContractorScope
06/15/2026Permit IssuedMOMENTUM SOLAR20 panels, 8.8 kw, 6,000 roof_area_sqft
▾Field Inspections (DOB CAP) — 13
DateTypeResultReport
04/01/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/12/2026Pass-Final Curb Cut Non-Directive 14PassView ↗
12/29/2025Pass-Final CND-Occupancy InspectionPassView ↗
10/22/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/08/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/08/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/21/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
04/11/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
04/08/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
12/06/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/27/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/16/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
06/15/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 96
DateRequirementInspectorRole
06/15/2026Post-installed AnchorsMina Makarspecial
06/15/2026Adhesive-Based Solar Pedestal Bonding SystemsMina Makarspecial
06/15/2026Fire-Resistant Penetrations and JointsMina Makarspecial
06/15/2026Air barrier - visual inspectionMina Makarenergy_progress
06/15/2026FinalMina Makarprogress
06/15/2026Energy Code Compliance InspectionsMina Makarprogress
06/15/2026Structural Stability – Alterations of existing buildingsMina Makarspecial
03/31/2026Concrete - Cast-In-PlaceNORMAN LOKspecial
03/31/2026Energy Code Compliance InspectionsNORMAN LOKprogress
03/31/2026Fire-Resistance Rated ConstructionNORMAN LOKprogress
03/31/2026FinalADITYA DESAIprogress
03/31/2026Lowest Floor ElevationNORMAN LOKprogress
03/31/2026Footing and FoundationNORMAN LOKprogress
03/31/2026Fenestration air leakageNORMAN LOKenergy_progress
03/31/2026FireplacesNORMAN LOKenergy_progress
03/31/2026Permanent certificateNORMAN LOKenergy_progress
03/31/2026Protection of exposed foundation insulationNORMAN LOKenergy_progress
03/31/2026Lighting in dwelling unitsNORMAN LOKenergy_progress
03/31/2026Fenestration areasNORMAN LOKenergy_progress
03/31/2026MeteringNORMAN LOKenergy_progress
03/31/2026Air barrier — testing NORMAN LOKenergy_progress
03/31/2026HVAC-R and service water heating equipmentNORMAN LOKenergy_progress
03/31/2026Exterior lighting powerNORMAN LOKenergy_progress
03/31/2026Insulation placement and R valuesNORMAN LOKenergy_progress
03/31/2026HVAC-R and service water piping design and insulationNORMAN LOKenergy_progress
Latest 25 of 96.
▾Documents — 156 on file (BIS + DOB NOW)
▸Plans & Drawings12
▸DOB NOWPlans/Sketch12
08/27/2026Q00520140-I1Request digital key ↗
08/27/2026Q00552317-I1Request digital key ↗
08/21/2026Q00520100-I1Request digital key ↗
Showing 3 of 12 on file for this type
▸Zoning, Tax Lot & Property Records4
▸DOB NOWZD1: DOB Zoning Diagram3
08/17/2026Q00483760-I1Open ↗
08/15/2026Q00483760-P5Open ↗
08/14/2026Q00483760-P2Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/17/2026Q00483760-I1Open ↗
▸Seals & Professional Certifications106
▸DOB NOWProgress Inspector Seal & Signature66
08/29/2026Q00483760-P1Open ↗
08/29/2026Q00483760-P1Open ↗
08/29/2026Q00483760-P1Open ↗
Showing 3 of 66 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature28
09/17/2026Q00577507-I1Open ↗
08/29/2026Q00483760-P1Open ↗
08/29/2026Q00483760-P1Open ↗
Showing 3 of 28 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature12
08/27/2026Q00520140-I1Open ↗
08/27/2026Q00552317-I1Open ↗
08/20/2026Q00577507-P1Open ↗
Showing 3 of 12 on file for this type
▸Trade Schedules & Equipment3
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)3
08/17/2026Q00483760-I1Open ↗
08/15/2026Q00483760-P5Open ↗
08/14/2026Q00483760-P2Open ↗
▸Safety & Tenant Protection1
▸DOB NOWStreet Trees Site Plan1
08/17/2026Q00483760-I1Open ↗
▸Environmental & Asbestos10
▸DOB NOWDEP ACP-5: Asbestos Assessment Report10
08/20/2026Q00577507-P1Open ↗
08/20/2026Q00577507-I1Open ↗
08/17/2026Q00483760-P1Open ↗
Showing 3 of 10 on file for this type
▸Energy Compliance3
▸DOB NOWEN2: As Built Energy Analysis.3
08/21/2026Q00520100-I1Open ↗
08/17/2026Q00483760-I1Open ↗
08/13/2026Q00520100-I1Open ↗
▸Inspections & Test Reports4
▸DOB NOWSOIL REPORT2
08/14/2026Q00483760-S1Open ↗
08/13/2026Q00483760-P1Open ↗
▸DOB NOWTR5 Test Report1
08/14/2026Q00483760-S1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/14/2026Q00483760-S1Open ↗
▸Cost, Insurance & Ownership2
▸DOB NOWCertification by Insurance Broker or Agency1
08/17/2026Q00483760-I1Open ↗
▸DOB NOWCertificate of Insurance1
08/17/2026Q00483760-I1Open ↗
▸Other Documents11
▸DOB NOWSite Survey: Initial3
08/17/2026Q00483760-I1Open ↗
08/15/2026Q00483760-P5Open ↗
08/14/2026Q00483760-P2Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/17/2026Q00483760-I1Open ↗
08/15/2026Q00483760-P5Open ↗
08/14/2026Q00483760-P2Open ↗
▸DOB NOWFEMA Elevation Certificate (086-0-33)/Flood Proofing Certificate (086-0-34)2
08/17/2026Q00483760-I1Open ↗
08/13/2026Q00520100-I1Open ↗
▸DOB NOWAdditional Insured Authorizations1
08/17/2026Q00483760-I1Open ↗
▸DOB NOWLowest Floor Elevation Plan1
08/17/2026Q00483760-I1Open ↗
▸DOB NOWFinal Survey1
08/17/2026Q00483760-I1Open ↗