← Back
Two stories - detached, small or mid-size
145 BODINE STREET
STATEN ISLAND · BIN 5005444
💬 Discuss this project
1899Year Built
2.5Stories
A1Building Class
R3AZoning
1,350 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 4,212 sf lot · 0.32 FAR built · Flood zone X
Locations of Work
Architecture
Permit Issued — active, not yet Signed-off
Floor 1Under Construction2p · 1 filing · 9 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SOLE PROPRIETOR209/09/2025
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CHARLES-WILLIAMS CONSTRUCGeneral Contractor504/09/2026
ALL PRO PLBG & HTG INCPlumbing107/08/2026
Building Lifecycle
All (9)Filed (2)Permit Issued (4)Special Inspection (3)
02/02/2026
Permit issued — General Construction
S01164078-I1-GC
10/06/2025
Permit issued — Plumbing
S01164078-S1-PL
09/09/2025
Filed — Alteration
INSTALL NEW FULL BATHROOM ON FIRST FLOOR. INCLUDES INSTALLATION OF TOILET, LAVATORY & SHOWER WITH ASSOCIATED SANITARY DRAINAGE / VENTING AND DOMESTIC WATER PIPING.NO CHANGE IN USE, OCCUPANCY OR EGRESS.
S01164078-S1
09/08/2025
Special inspection requirement — Energy Code Compliance Inspections
KRISTEN ABRUZZESE
09/08/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
KRISTEN ABRUZZESE
05/14/2025
Permit issued — General Construction
S01164078-I1-GC
03/27/2025
Permit issued — General Construction
S01164078-I1-GC
03/19/2025
Filed — Alteration
INSTALL NEW FULL BATHROOM ON FIRST FLOOR. INCLUDES INSTALLATION OF TOILET, LAVATORY & SHOWER WITH ASSOCIATED SANITARY DRAINAGE / VENTING AND DOMESTIC WATER PIPING.NO CHANGE IN USE, OCCUPANCY OR EGRESS.
S01164078-I1
01/08/2025
Special inspection requirement — Final
KRISTEN ABRUZZESE
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedCHARLES-WILLIAMS CONSTRUC02/02/2026
DOB NOWPlumbingPermit IssuedALL PRO PLBG & HTG INC10/06/2025
DOB NOWGeneral ConstructionPermit IssuedCHARLES-WILLIAMS CONSTRUC05/14/2025
DOB NOWGeneral ConstructionPermit IssuedCHARLES-WILLIAMS CONSTRUC03/27/2025
1 project · most recent 09/09/2025
Water/Sanitary
FiledStatusContractorScope
09/09/2025Permit IssuedALL PRO PLBG & HTG INCWater/Sanitary
▾Special Inspection Requirements (DOB NOW) — 3
DateRequirementInspectorRole
09/08/2025Energy Code Compliance InspectionsKRISTEN ABRUZZESEprogress
09/08/2025HVAC-R and service water piping design and insulationKRISTEN ABRUZZESEenergy_progress
01/08/2025FinalKRISTEN ABRUZZESEprogress
▾Documents — 9 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/19/2026S01164078-S1Request digital key ↗
08/19/2026S01164078-I1Request digital key ↗
▸Seals & Professional Certifications5
▸DOB NOWProgress Inspector Seal & Signature3
08/28/2026S01164078-S1Open ↗
08/28/2026S01164078-S1Open ↗
08/23/2026S01164078-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/13/2026S01164078-I1Open ↗
08/13/2026S01164078-S1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/13/2026S01164078-S1Open ↗
08/13/2026S01164078-I1Open ↗