145 EAST 32ND STREET
MANHATTAN · BIN 1018476
💬 Discuss this project
1927Year Built
13Stories
O3Building Class
R8BZoning
101,283 sfGross Floor Area
5Units
LL97 Covered7 Active Violations 4 unresolved · 3 paperwork only 12 likely answered 8 old, status unconfirmed ▸FISP: UNSAFE
Office only, 7-19 stories · Owner of record: 175 Varick Street · 8,646 sf lot · 11.71 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Floor 12Meyer Equities LLC3p · 1 filing · 3 docs
Floor 11
Floor 10Meyer Equities LLC8p · 2 filings · 20 docs
Floor 9
Floor 8NYU Langone Health64p · 3 filings · 20 docs
Floor 7NYU Langone Health4p · 1 filing · 13 docs
Floor 6Meyer Equities LLC2p · 1 filing · 6 docs
Floor 5NYU Langone Health29p · 1 filing · 9 docs
Floor 4
Floor 3
Floor 2NYU Langone Health41p · 3 filings · 19 docs
Floor 1Hydrogen FitnessUnder Construction2p · 2 filings · 20 docs
MezzanineHydrogen Fitness1 filing · 19 docs
CellarHydrogen FitnessUnder Construction10p · 4 filings · 20 docs
Site & exteriorHeavy duty sidewalk shedUnder Construction7p · 1 filing · 2 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
175 Varick7003/22/2026
Meyer Equities5510/17/2026
145 East 32nd Street1203/21/2026
175 Varrick Street603/21/2026
145 E 32 ST603/21/2026
205-15 Lex Associates303/21/2026
Lexington Development Group203/21/2026
145 E 32nd St Limited Partnersh203/21/2026
Firest Service Williams103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
New York Design Arhictects203/21/2026
Burnham Nationwide203/21/2026
Outsource Consultants1403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Phase 3 InteriorsGeneral Contractor507/08/2026
Empire General ContractingGeneral Contractor307/08/2026
JC National Air Conditionspecialty_contractor207/08/2026
Colgate RestorationScaffold210/17/2026
Colgate Restorationspecialty_contractor104/09/2026
Alliance PlumbingPlumbing107/08/2026
New York Standard MechanicalPlumbing107/08/2026
Unipipe P & HFire Protection107/08/2026
Eia ElectricElectrical103/21/2026
United Plumbing MechanicalFire Protection107/08/2026
P.L. Electrical ContractingElectrical103/21/2026
Jim ElectricElectrical103/21/2026
Brosna ConstructionGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
EP Inspections and Commis7079310/01/2026
CDG Architects LLC /Dba1327308/28/2026
Z & T Engineering591108/21/2026
Wong Architect1272406/18/2026
Alan Margolin & Associates423710/17/2024
Aks Architectural & Engineering1957104/28/2021
Building Lifecycle
All (152)Filed (22)Permit Issued (16)Signed Off (5)Facade (FISP) (12)Violation (60)Inspection (5)Objection (2)Special Inspection (30)
10/16/2026
Permit issued — Sidewalk Shed
M01404590-I1-SH
10/01/2026
Filed — Alteration
Sprinkler modifications as per submitted drawings. No change to use egress or occupancy
M01198146-P2
09/01/2026
Signed off — Alteration
M01416975-I1
08/28/2026
Filed — Alteration
Modifications to existing HVAC system for the space, new HVAC equipment.
M01441812-S3
08/28/2026
Filed — Alteration
Modifications to existing HVAC system for the space, new HVAC equipment.
M01441812-S2
08/28/2026
Special inspection requirement — Maintenance information
Yongho Kim
08/21/2026
Filed — Alteration
Modifications to existing HVAC system for the space, new HVAC equipment.
M01441812-I1
08/21/2026
Filed — Alteration
Modifications to existing HVAC system for the space, new HVAC equipment.
M01441812-S4
08/20/2026
Special inspection requirement — Post-installed Anchors
EVAN PARGANOS
08/20/2026
Special inspection requirement — Sprinkler Systems
EVAN PARGANOS
08/18/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Yongho Kim
08/18/2026
Special inspection requirement — Energy Code Compliance Inspections
Yongho Kim
08/18/2026
Special inspection requirement — Lighting controls
Yongho Kim
08/18/2026
Special inspection requirement — Interior lighting power
Yongho Kim
08/05/2026
Special inspection requirement — Structural Steel - Details
Fei Zeng
08/05/2026
Special inspection requirement — HVAC-R and service water heating system controls
Yongho Kim
08/05/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Fei Zeng
08/05/2026
Special inspection requirement — Final
Fei Zeng
08/05/2026
Special inspection requirement — Concrete - Cast-In-Place
Fei Zeng
08/05/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Yongho Kim
08/05/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Yongho Kim
08/05/2026
Special inspection requirement — Structural Steel - Welding
Fei Zeng
08/05/2026
Special inspection requirement — HVAC-R and service water heating equipment
Yongho Kim
08/05/2026
Special inspection requirement — Structural Steel - High Strength Bolting
Fei Zeng
08/05/2026
Special inspection requirement — Sprinkler Systems
Yongho Kim
08/05/2026
Special inspection requirement — Final
Yongho Kim
08/03/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/16/2026
Filed — Alteration
Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M01404590-I1
07/16/2026
Permit issued — Sidewalk Shed
M01404590-I1-SH
07/06/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
07/02/2026
Inspection — Pass-Final SP - Up to 3 Requested Floors
Pass
View inspection ↗
06/23/2026
Permit issued — General Construction
M01416975-I1-GC
06/18/2026
Filed — Alteration
M01416975-I1
06/17/2026
Permit issued — General Construction
M01411420-I1-GC
06/17/2026
Special inspection requirement — Sprinkler Systems
EVAN PARGANOS
06/17/2026
Special inspection requirement — Post-installed Anchors
EVAN PARGANOS
06/16/2026
Filed — Alteration
Sprinkler modifications as per submitted drawings. No change to use egress or occupancy
M01198146-P1
06/11/2026
Cycle 10 facade report submitted
06/11/2026
Cycle 10 facade report signed — UNSAFE
06/10/2026
Filed — Alteration
REMOVAL OF INTERIOR NON LOAD-BEARING PARTITIONS FOR CELLAR AND GROUND FLOOR COMMERCIAL SPACES AS PER PLANS FILED HEREWITH.
M01411420-I1
06/03/2026
Special inspection requirement — Final
Laurence Jones
06/01/2026
Special inspection requirement — Sprinkler Systems
EVAN PARGANOS
06/01/2026
Special inspection requirement — Post-installed Anchors
EVAN PARGANOS
05/15/2026
Permit issued — Sprinklers
M01198146-I1-EW-SP
04/27/2026
Cycle 10 facade inspection completed
02/06/2026
Signed off — Alteration
Installation of interior non-bearing partitions and related finishes as per plans filed herewith. No change in use, egress, or occupancy under this application.
M01217691-I1
01/30/2026
Permit issued — General Construction
M01217691-I1-GC
05/21/2025
Filed — Alteration
Installation of interior non-bearing partitions and related finishes as per plans filed herewith. No change in use, egress, or occupancy under this application.
M01217691-I1
04/28/2025
Filed — Alteration
Sprinkler modifications as per submitted drawings. No change to use egress or occupancy
M01198146-I1
03/05/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
02/26/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
12/03/2024
Permit issued — Plumbing
M01067997-S2-PL
11/12/2024
Permit issued — Mechanical Systems
M01067997-S1-MS
11/07/2024
Permit issued — General Construction
M01067997-I1-GC
10/18/2024
Signed off — Alteration
non bearing partitions and finishes removal. New non bearing partitions and finishes on 10th fl. no change in use, egress or occupancy.
M00991672-I1
10/17/2024
Filed — Alteration
NYU GROSSMAN SCHOOL - 8TH FLOOR RECONFIGURATION - MECHANICAL MODIFICATIONS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01067997-S1
10/17/2024
Filed — Alteration
NYU GROSSMAN SCHOOL - 8TH FLOOR RECONFIGURATION - MECHANICAL MODIFICATIONS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01067997-S2
10/08/2024
Filed — Alteration
NYU GROSSMAN SCHOOL - 8TH FLOOR RECONFIGURATION - MECHANICAL MODIFICATIONS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01067997-I1
09/24/2024
Permit issued — Sprinklers
M00851625-I1-EW-SP
06/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
Latest 60 of 152 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedColgate Restoration10/16/2026
DOB NOWSidewalk ShedPermit IssuedColgate Restoration07/16/2026
DOB NOWGeneral ConstructionSigned-offPhase 3 Interiors06/23/2026
DOB NOWGeneral ConstructionPermit IssuedPhase 3 Interiors06/17/2026
DOB NOWSprinklersPermit IssuedUnipipe P & H05/15/2026
DOB NOWGeneral ConstructionSigned-offColgate Restoration01/30/2026
DOB NOWPlumbingPermit IssuedCardoza Plumbing Wmbe12/03/2024
DOB NOWMechanical SystemsPermit IssuedEmpire General Contracting11/12/2024
DOB NOWGeneral ConstructionPermit IssuedEmpire General Contracting11/07/2024
DOB NOWSprinklersPermit IssuedUnited Plumbing Mechanical09/24/2024
DOB NOWMechanical SystemsPermit IssuedBrosna Construction06/04/2024
DOB NOWGeneral ConstructionSigned-offPhase 3 Interiors01/29/2024
DOB NOWGeneral ConstructionSigned-offPhase 3 Interiors05/31/2023
DOB NOWMechanical SystemsPermit IssuedJC National Air Condition04/14/2022
DOB NOWMechanical SystemsPermit IssuedJC National Air Condition05/12/2021
DOB NOWPlumbingSigned-offNew York Standard Mechanical11/12/2020
BISMHISSUEDJC National Air Condition02/20/2019
BISMHISSUEDJC National Air Condition12/21/2017
BISMHISSUEDMichael Gangi Plum & Heating03/22/2016
BISSPISSUEDMichael Gangi P&H Cont03/22/2016
BISOTISSUEDMichael Gangi Plum & Heating03/22/2016
BISPLISSUEDMichael Gangi P&H Contracting03/22/2016
BISMHISSUEDDonnelly Mechanical10/27/2015
BISSPISSUEDMichael Gangi P&H Cont08/11/2015
BISMHISSUEDMichael Gangi Plum & Heating10/10/2014
BISPLISSUEDMichael Gangi P&H Contracting10/07/2014
BISSPISSUEDMichael Gangi P&H Cont10/07/2014
BISSPISSUEDMichael Gangi P&H Cont06/12/2013
BISPLISSUEDMichael Gangi P&H Contracting06/12/2013
BISMHISSUEDMichael Gangi Plum & Heating06/12/2013
BISMHISSUEDDonnelly Mechanical04/26/2013
BISSPISSUEDPar Fire Protection03/12/2012
BISSPISSUEDPar Fire Protection02/22/2012
BISFSISSUEDAce Atlas09/28/2011
BISSPISSUEDMichael Gangi P&H Cont09/23/2011
BISPLISSUEDMichael Gangi P&H Contracting09/23/2011
BISMHISSUEDL & M Air07/21/2011
BISOTISSUEDSkyline Restoration07/12/2011
BISSPISSUEDMichael Gangi P&H Cont04/08/2011
BISEQISSUEDEverest Scaffolding03/02/2011
+ 26 more permits on file
3 projects · most recent 08/28/2026
Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
08/28/2026——Air Conditioning Systems, Heating Systems, Ventilation Systems
Cooling
Lg ZRNU053SJSA 283 CFM · Vrf Indoor ×8
ZRNU283TAAA 855 CFM · Ahu ×8
ZRNU483TAAA 1,158 CFM · Vrf Indoor ×5
ZRNU243TAAA 813 CFM · Vrf Outdoor ×4
ZRNU363TAAA 988 CFM · Ahu ×4
ZRNU183TAAA 735 CFM · Vrf Indoor ×2
ZRNU093SJSA 275 CFM · Ahu ×1
ZRNU123SJSA 300 CFM · Ahu ×1
ZRNU123TRAA 307 CFM · Vrf Indoor ×1
ZRNU183L2GA 530 CFM · Vrf Indoor ×1
ZRUM121BTE6 119,000 BTU · Condensing Unit ×1
ZRUM144BTE6 144,000 BTU · Condensing Unit ×1
Greenheck SQ-98-VG 450 CFM · Exhaust Fan ×1
Heating
Berner AE08-F-1072E 38,214 BTU · Air Curtain ×1
Ventilation
Greenheck CSP-A390-VG 100 CFM · Exhaust Fan ×1
CSP-A510-VG 360 CFM · Exhaust Fan ×1
SP-A250 180 CFM · Exhaust Fan ×1
SP-LP0810W 80 CFM · Exhaust Fan ×1
SQ-120-VG 900 BTU · Exhaust Fan ×1
Lg ARVU123ZFA2 1,180 CFM · Vrf Indoor ×2
ARVU093ZFA2 810 CFM · Vrf Indoor ×1
Indeeco QUA 57 kW · Electric Heater ×1
05/23/2024Permit IssuedBrosna ConstructionAir Conditioning Systems
Cooling
— Carrier 50XCA 300,000 BTU · Condensing Unit ×4
MITSUBISIHI TUHYP2403BN40A 240,000 BTU · Condensing Unit ×2
TRANE UCCAG14A0F0RZ012 240,000 BTU · Condensing Unit ×2
04/28/2021Permit IssuedJC National Air ConditionAir Conditioning Systems
Cooling
Johnson Controls DSV240C 250,000 BTU · Chiller ×1
3 projects · most recent 10/01/2026
Sprinkler System
FiledStatusContractorScope
10/01/2026Permit IssuedUnipipe P & H8 heads
08/28/2026——Sprinkler System
11/30/2023Permit IssuedUnited Plumbing Mechanical1 heads
2 projects · most recent 08/28/2026
Water/Sanitary
FiledStatusContractorScope
08/28/2026——Water/Sanitary
10/17/2024Permit IssuedAlliance PlumbingWater/Sanitary
1 project · most recent 05/19/2026
FiledStatusContractorScope
05/19/2026Permit IssuedHigh Quality Electric of NYC—
1 project · most recent 08/28/2026
Steel Concrete
FiledStatusContractorScope
08/28/2026——Steel, Concrete
1 project · most recent 07/16/2026
Sidewalk Shed
FiledStatusContractorScope
07/16/2026Permit IssuedColgate RestorationSidewalk Shed
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
08/03/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/06/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
07/02/2026Pass-Final SP - Up to 3 Requested FloorsPassView ↗
03/05/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
02/26/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 61
DateRequirementInspectorRole
08/28/2026Maintenance informationYongho Kimenergy_progress
08/20/2026Sprinkler SystemsEVAN PARGANOSspecial
08/20/2026Post-installed AnchorsEVAN PARGANOSspecial
08/18/2026Interior lighting powerYongho Kimenergy_progress
08/18/2026Lighting controlsYongho Kimenergy_progress
08/18/2026Fire-Resistant Penetrations and JointsYongho Kimspecial
08/18/2026Energy Code Compliance InspectionsYongho Kimprogress
08/05/2026HVAC-R and service water heating equipmentYongho Kimenergy_progress
08/05/2026HVAC-R and service water heating system controlsYongho Kimenergy_progress
08/05/2026HVAC-R and service water piping design and insulationYongho Kimenergy_progress
08/05/2026Structural Steel - DetailsFei Zengspecial
08/05/2026Concrete - Cast-In-PlaceFei Zengspecial
08/05/2026Structural Steel - High Strength BoltingFei Zengspecial
08/05/2026Sprinkler SystemsYongho Kimspecial
08/05/2026FinalFei Zengprogress
08/05/2026Structural Steel - WeldingFei Zengspecial
08/05/2026Fire-Resistant Penetrations and JointsYongho Kimspecial
08/05/2026FinalYongho Kimprogress
08/05/2026Structural Stability – Alterations of existing buildingsFei Zengspecial
06/17/2026Post-installed AnchorsEVAN PARGANOSspecial
06/17/2026Sprinkler SystemsEVAN PARGANOSspecial
06/03/2026FinalLaurence Jonesprogress
06/01/2026Sprinkler SystemsEVAN PARGANOSspecial
06/01/2026Post-installed AnchorsEVAN PARGANOSspecial
06/18/2024Post-installed AnchorsYoung Suhspecial
Latest 25 of 61.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Hydrogen FitnessFitness / RecreationCellar, Floor 1, Mezzanine
Project M01441812 Alteration · Approved · 08/21/2026
NYU Langone HealthMedical / HealthcareFloors 2, 5, 7, 8
Project M01067997 Alteration · Permit Entire · 10/08/2024
Project M00851618 Alteration · Permit Entire · 11/30/2023
Project M00851625 Alteration · Permit Entire · 11/30/2023
Project M00397962 Alteration · LOC Issued · 11/09/2020
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 481 on file (BIS + DOB NOW)
▸Plans & Drawings21
▸DOB NOWPlans/Sketch20
09/03/2026M00493518-I1Request digital key ↗
08/31/2026M00880553-I1Request digital key ↗
08/28/2026M00851625-I1Request digital key ↗
Showing 3 of 20 on file for this type
▸DOB NOWPlans/Sketch - Plumbing1
09/04/2026M00397962-I1Request digital key ↗
▸Applications & Permits75
▸BISPLAN / WORK APPROVAL APPLICATION44
09/03/2025102135707Open ↗
01/23/2025102135707Open ↗
10/04/2024102135707Open ↗
Showing 3 of 44 on file for this type
▸BISWORK PERMIT APPLICATION31
02/20/2019123683763Open ↗
12/22/2017123165485Open ↗
11/11/2015122190798Open ↗
Showing 3 of 31 on file for this type
▸Seals & Professional Certifications150
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION49
02/20/2019123683763Open ↗
02/20/2019123683763Open ↗
12/22/2017123165485Open ↗
Showing 3 of 49 on file for this type
▸DOB NOWProgress Inspector Seal & Signature25
09/23/2026M01441812-I1Open ↗
09/23/2026M01441812-I1Open ↗
09/23/2026M01441812-S2Open ↗
Showing 3 of 25 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature23
09/10/2026M01441812-S3Open ↗
09/10/2026M01441812-S2Open ↗
08/31/2026M00880553-I1Open ↗
Showing 3 of 23 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST18
02/20/2019123683763Open ↗
12/22/2017123165485Open ↗
11/11/2015122190798Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature18
10/05/2026M01198146-P2Open ↗
10/05/2026M01198146-P2Open ↗
09/23/2026M01441812-S3Open ↗
Showing 3 of 18 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM13
10/04/2011120832439Open ↗
07/25/2011120777766Open ↗
04/14/2011120651071Open ↗
Showing 3 of 13 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
02/20/2019123683763Open ↗
12/22/2017123165485Open ↗
11/11/2015122190798Open ↗
▸BISProfessional and Owner Certification (POC3)1
08/28/2015122488290Open ↗
▸Trade Schedules & Equipment54
▸BISSELF-CERT PLUMBING NOTICE18
12/10/2012120270848Open ↗
03/22/2012120567270Open ↗
05/25/2011120567289Open ↗
Showing 3 of 18 on file for this type
▸BISSCHEDULE B - PLUMBING12
06/20/2012120567270Open ↗
04/20/2011120567289Open ↗
04/19/2011120567289Open ↗
Showing 3 of 12 on file for this type
▸BISEQUIPMENT USE PERMITS8
07/01/2022123165485Open ↗
07/01/2022123165485Open ↗
04/26/2016122190798Open ↗
Showing 3 of 8 on file for this type
▸BISSPRINKLER INSP REPORT : FP-856
12/10/2012120270848Open ↗
03/23/2011120567270Open ↗
Showing 2 of 6 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT5
07/01/2022123165485Open ↗
04/26/2016122190798Open ↗
07/24/2013121583802Open ↗
Showing 3 of 5 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA3
09/05/2018122429871Open ↗
04/18/2016122021409Open ↗
04/30/2013120567396Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
10/04/2011120832439Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
08/28/2015122488290Open ↗
▸Safety & Tenant Protection1
▸BISSTREET TREE CHECKLIST1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos50
▸DOB NOWDEP ACP-5: Asbestos Assessment Report24
09/10/2026M01441812-S3Open ↗
09/10/2026M01441812-S2Open ↗
08/31/2026M00880553-I1Open ↗
Showing 3 of 24 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'13
10/04/2011120832439Open ↗
07/25/2011120777766Open ↗
04/14/2011120651071Open ↗
Showing 3 of 13 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)7
02/20/2019123683763Open ↗
12/22/2017123165485Open ↗
11/11/2015122190798Open ↗
Showing 3 of 7 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Energy Compliance18
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS6
02/20/2019123683763Open ↗
12/22/2017123165485Open ↗
05/03/2016122190798Open ↗
Showing 3 of 6 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS5
07/01/2022123165485Open ↗
05/03/2016122190798Open ↗
11/28/2011120832439Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: ENERGY4
10/04/2011120777766Open ↗
10/04/2011120832439Open ↗
07/25/2011120777766Open ↗
Showing 3 of 4 on file for this type
▸BISTR8: Energy Code Progress Inspections1
09/20/2013121583802Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
07/01/2022123165485Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026M00493518-I1Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY2
07/01/2022123165485Open ↗
07/01/2022123165485Open ↗
▸Approvals, Objections & Sign-offs37
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST15
11/29/2018122429871Open ↗
10/21/2016120021118Open ↗
10/21/2016110469822Open ↗
Showing 3 of 15 on file for this type
▸BISADMINISTRATIVE OBJECTIONS14
05/02/2013121583802Open ↗
10/04/2011120832439Open ↗
07/25/2011120777766Open ↗
Showing 3 of 14 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION4
05/04/2016122190798Open ↗
09/23/2013121583802Open ↗
Showing 2 of 4 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE4
09/03/2025102135707Open ↗
01/23/2025102135707Open ↗
10/11/2024102135707Open ↗
Showing 3 of 4 on file for this type
▸Cost, Insurance & Ownership47
▸BISCOST AFFIDAVIT47
07/01/2022123165485Open ↗
02/20/2019123683763Open ↗
11/29/2018122429871Open ↗
Showing 3 of 47 on file for this type
▸Filing & Intake Forms22
▸BISEFILING COVER SHEET14
02/20/2019123683763Open ↗
12/22/2017123165485Open ↗
11/11/2015122190798Open ↗
Showing 3 of 14 on file for this type
▸BISADDITIONAL INFORMATION5
08/01/2024102135707Open ↗
08/21/2012120567270Open ↗
01/06/2012120651071Open ↗
Showing 3 of 5 on file for this type
▸BISeFiling Job Application Cover Sheet2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISBOROUGH INTAKE FORM1
11/29/2018122429871Open ↗
▸Other Documents4
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION3
11/28/2011120832439Open ↗
Showing 1 of 3 on file for this type
▸BISSupporting Document: Fee Exempt1
10/25/2011120777766Open ↗