ECB06/22/2026FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. AT TIME OF INSPECTION OBSERVED AT INCIDENT AT 1ST FLOOR COMMERCIAL SPACE (SABA'S PIZZA) PIZZA OVEN EXPLOSION AT BASE WITH MINIMAL CHARRED, 2 WORKERS INJURE$12K due
HPD07/26/2024§ 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES AT DOOR LEADING TO BASEMENT AT PUBLIC HALL, 1st STORY
ECB05/28/2020AC 28-201.1 EO MO 102 FAILURE TO COMPLY WITH MAYOR;S EXECUTIVE ORDER 103 NOTED: @THE TIME OF INSPECITON OBSERVED @GROUND FLOOR "JUBILEE SMOKE & VAPE INC".REM: COMPLY WITH MAYOR'S EXECUTIVE ORDER 103$5 due
HPD07/25/2019§ 27-2005 ADM CODE REPLACE WITH NEW THE MISSING NON PADLOCKABLE SLIDE BOLT OR HOOK AND EYE AT ROOF BULKHEAD DOOR
HPD07/25/2019§ 27-2005, 2007 ADM CODE REMOVE THE ILLEGAL FASTENING LOCKABLE DOOR KNOB ASSEMBLY ON DOOR TO ROOM WITH EGRESS WINDOW LOCATED AT APT 4S, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH
HPD06/20/2019§ 27-2005, 2007 ADM CODE ARRANGE AND MAKE SELF-CLOSING THE DOORS .... IN THE ENTRANCE LOCATED AT APT 4S, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH
DOB05/15/2014VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT
HPD08/30/1999§ 27-2005, 2007 ADM CODE ARRANGE AND MAKE SELF-CLOSING THE DOORS BULKHEAD TO ROOF.
HPD09/19/1988§ 27-2005 ADM CODE REFIT DOOR BOILER ROOM CELLAR.
HPD09/12/1988§ 27-2005 ADM CODE REPLACE WITH NEW THE MISSING CHAIN DOOR GUARD ENTRANCE TO 3 STY NORTH APT 3N. LOCATED AT APT 3N
HPD09/12/1988D26-10.01, 10.05 ADM CODE ARRANGE AND MAKE SELF-CLOSING THE DOORS BULKHEAD TO ROOF.
HPD03/14/1985D26-17.10 ADM CODE POST NOTICE, IN FORM APPROVED BY THE DEPARTMENT, STATING THE NAME AND LOCATION OF THE PERSON DESIGNATED BY THE OWNER TO HAVE KEY TO BUILDING'S HEATING SYSTEM 1ST STY PUBLIC HALL NEAR MAILBOXES AND AT DOOR TO BOILER ROOM.
ECB08/03/2010FAILURE TO MAINTAIN BLDG IN CODE COMPLIANT MANNER.DEFECT NOTED:BLDG HAVING SLOPING STAIRS TRENDS APPR 2" FROM 3RD FLR TO ROOF BULKHEAD OF MAIN STAIRCASE.REMEDY: OBTAIN ENGINEERING REPOST FOR STAIRS STRUCTURE STNothing owed — awaiting certificate of correction
ECB09/09/2008FAILURE TO PROVIDE APPROVED/ACCPETED PLANS AT JOB SITE AT TIME OF INSPNO PLANS ON SITE TO CHECK FOR COMPLIANCE TO TPPN 5/98. STOP ALL WORK. REMEDY: PROVIDE APPROVED PLANS.Nothing owed — awaiting certificate of correction