← Back
One story - permanent living quarter
145 MILES AVENUE
STATEN ISLAND · Great Kills-Eltingville · BIN 5062452
💬 Discuss this project
1960Year Built
1Stories
A2Building Class
R2Zoning
912 sfGross Floor Area
1Units
One story - permanent living quarter · 4,000 sf lot · 0.23 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralGeneral
Filed — no permit issued14p · 4 filings · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
THINK DESIGN ARCHITECTURE402/02/2023
Building Lifecycle
All (4)Filed (4)
02/02/2023
Filed — Alteration
S00821584-I1
07/01/2022
Filed — Alteration CO
APPLICATION IS FILED FOR THE VERTICAL ENLARGEMENT TO AN EXISTING 1 STORY, 1 FAMILY TO A 2 STORY ALONG WITH INTERIOR RENOVATION. ALL WORK AS PER THE PLANS SUBMITTED HEREWITH.
S00761807-I1
07/01/2022
Filed — Alteration
APPLICATION FILED FOR THE VERTICAL ENLARGEMENT TO AN EXISTING 1 STORY, 1 FAMILY RESIDENCE, TO A 2 STORY. ALONG WITH INTERIOR RENOVATION. ALL WORK AS PER PLANS SUBMITTED HEREWITH.
S00767630-I1
06/30/2022
Filed — Alteration
S00743320-I1
Nothing on file for this building.
1 project · most recent 07/01/2022
Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
07/01/2022——Air Conditioning Systems, Ventilation Systems
Ventilation
1 project · most recent 07/01/2022
Gas Water/Sanitary
FiledStatusContractorScope
07/01/2022——Gas, Water/Sanitary
1 project · most recent 07/01/2022
Wood
FiledStatusContractorScope
07/01/2022——Wood
▾Special Inspection Requirements (DOB NOW) — 23
DateRequirementInspectorRole
07/01/2022HVAC-R and service water piping design and insulation—energy_progress
07/01/2022HVAC-R and service water heating system controls—energy_progress
07/01/2022Fire-Resistant Penetrations and Joints—special
07/01/2022Energy Code Compliance Inspections—progress
07/01/2022HVAC-R and service water heating equipment—energy_progress
06/30/2022Energy Code Compliance Inspections—progress
06/30/2022Fire-Resistance Rated Construction—progress
06/30/2022Structural Wood Frame—progress
06/30/2022Fenestration air leakage—energy_progress
06/30/2022Air barrier — testing —energy_progress
06/30/2022Interior lighting power—energy_progress
06/30/2022Fenestration areas—energy_progress
06/30/2022Air barrier - visual inspection—energy_progress
06/30/2022Insulation placement and R values—energy_progress
06/30/2022Maintenance information—energy_progress
06/30/2022Permanent certificate—energy_progress
06/30/2022Fenestration and door U-factor and product ratings—energy_progress
06/30/2022Structural Stability – Alterations of existing buildings—special
06/30/2022Wood – Prefabricated I-Joists—special
06/30/2022Fire-Resistant Penetrations and Joints—special
06/30/2022Subsurface Investigations (Borings/Test Pits)—special
06/21/2022Mechanical Systems—special
06/21/2022Final—progress
▾Documents — 29 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/24/2026S00743320-I1Request digital key ↗
08/24/2026S00767630-I1Request digital key ↗
08/24/2026S00761807-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸Applications & Permits1
▸BISBPP-5 - Authorization to the Department of Transportation1
10/25/2022540231783Open ↗
▸Zoning, Tax Lot & Property Records3
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026S00761807-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026S00761807-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/13/2026S00761807-I1Open ↗
▸Seals & Professional Certifications6
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/24/2026S00743320-I1Open ↗
08/23/2026S00821584-I1Open ↗
08/13/2026S00761807-I1Open ↗
Showing 3 of 4 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
06/30/2022540231783Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
06/30/2022540231783Open ↗
▸Safety & Tenant Protection1
▸DOB NOWStreet Tree Checklist1
08/13/2026S00761807-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/13/2026S00761807-I1Open ↗
08/13/2026S00767630-I1Open ↗
▸Inspections & Test Reports4
▸BISBPP-9 - Request for Builders Pavement Field Inspection1
06/30/2022540231783Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026S00761807-I1Open ↗
▸DOB NOWSOIL REPORT1
08/13/2026S00761807-I1Open ↗
▸DOB NOWTR4 Plot Diagram1
08/13/2026S00761807-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff1
10/25/2022540231783Open ↗
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
06/30/2022540231783Open ↗
▸Other Documents6
▸BISWAIVER OF CURB1
10/25/2022540231783Open ↗
▸BISBPP: PHOTOS-SIGNED/SEALED BY APPLICANT1
10/17/2022540231783Open ↗
▸DOB NOWPlot Diagram1
08/13/2026S00761807-I1Open ↗
▸DOB NOWProperty Ownership Certification1
08/13/2026S00761807-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/13/2026S00761807-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026S00761807-I1Open ↗