Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof21p · 2 filings · 20 docs
ArchitectureDMFire ProtectionStructural
Issued Permit Scope
General Construction · Sprinklers
PROVIDE AN 8'-0 HIGH TEMPORARY WOOD CONSTRUCTION FENCE TO BE REMOVED ONLY AFTER COMPLETION OF ALL WORK
On file for this project
34 documents · 7 drawing sheets
INSTALL NEW SPRINKLER SYSTEM AT ENTIRE BUILDING, INCLUDING FIRE DEPARTMENT CONNECTION (SIAMESE CONNECTION) AT FRONT WALL.
On file for this project
50 documents · 3 drawing sheets
Bulkhead2p · 1 filing · 20 docs
Architecture
INSTALL NEW SPRINKLER SYSTEM AT ENTIRE BUILDING, INCLUDING FIRE DEPARTMENT CONNECTION (SIAMESE CONNECTION) AT FRONT WALL.
On file for this project
50 documents · 2 drawing sheets
Floor 325p · 2 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction · Plumbing · Sprinklers
PROVIDE AN 8'-0 HIGH TEMPORARY WOOD CONSTRUCTION FENCE TO BE REMOVED ONLY AFTER COMPLETION OF ALL WORK
On file for this project
34 documents · 2 drawing sheets
INSTALL NEW SPRINKLER SYSTEM AT ENTIRE BUILDING, INCLUDING FIRE DEPARTMENT CONNECTION (SIAMESE CONNECTION) AT FRONT WALL.
On file for this project
50 documents · 1 drawing sheet
Floor 222p · 2 filings · 20 docs
ArchitectureFire ProtectionPlumbing
Issued Permit Scope
General Construction · Plumbing · Sprinklers
PROVIDE AN 8'-0 HIGH TEMPORARY WOOD CONSTRUCTION FENCE TO BE REMOVED ONLY AFTER COMPLETION OF ALL WORK
On file for this project
34 documents
INSTALL NEW SPRINKLER SYSTEM AT ENTIRE BUILDING, INCLUDING FIRE DEPARTMENT CONNECTION (SIAMESE CONNECTION) AT FRONT WALL.
On file for this project
50 documents
Floor 1Unit 124p · 2 filings · 20 docs
ArchitectureFire ProtectionPlumbing
Issued Permit Scope
General Construction · Plumbing · Sprinklers
PROVIDE AN 8'-0 HIGH TEMPORARY WOOD CONSTRUCTION FENCE TO BE REMOVED ONLY AFTER COMPLETION OF ALL WORK
On file for this project
34 documents
INSTALL NEW SPRINKLER SYSTEM AT ENTIRE BUILDING, INCLUDING FIRE DEPARTMENT CONNECTION (SIAMESE CONNECTION) AT FRONT WALL.
On file for this project
50 documents · 2 drawing sheets
Cellar33p · 2 filings · 20 docs
ArchitectureDMFire ProtectionPlumbingStructural
Issued Permit Scope
General Construction · Plumbing · Sprinklers
PROVIDE AN 8'-0 HIGH TEMPORARY WOOD CONSTRUCTION FENCE TO BE REMOVED ONLY AFTER COMPLETION OF ALL WORK
On file for this project
34 documents · 8 drawing sheets
INSTALL NEW SPRINKLER SYSTEM AT ENTIRE BUILDING, INCLUDING FIRE DEPARTMENT CONNECTION (SIAMESE CONNECTION) AT FRONT WALL.
On file for this project
50 documents · 3 drawing sheets
Basement13p · 1 filing · 20 docs
ArchitectureFire Protection
Issued Permit Scope
General Construction · Sprinklers
INSTALL NEW SPRINKLER SYSTEM AT ENTIRE BUILDING, INCLUDING FIRE DEPARTMENT CONNECTION (SIAMESE CONNECTION) AT FRONT WALL.
On file for this project
50 documents · 1 drawing sheet
Sub-Basement15p · 1 filing · 20 docs
ArchitecturePlumbing
Issued Permit Scope
General Construction · Plumbing
PROVIDE AN 8'-0 HIGH TEMPORARY WOOD CONSTRUCTION FENCE TO BE REMOVED ONLY AFTER COMPLETION OF ALL WORK
On file for this project
34 documents
Site & exteriorHeavy duty sidewalk shed32p · 3 filings · 20 docs
ArchitectureDMElectricalEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Construction Fence · Sidewalk Shed · Sprinklers
PROVIDE AN 8'-0 HIGH TEMPORARY WOOD CONSTRUCTION FENCE TO BE REMOVED ONLY AFTER COMPLETION OF ALL WORK
On file for this project
34 documents · 12 drawing sheets
INSTALL NEW SPRINKLER SYSTEM AT ENTIRE BUILDING, INCLUDING FIRE DEPARTMENT CONNECTION (SIAMESE CONNECTION) AT FRONT WALL.
On file for this project
50 documents · 12 drawing sheets
INSTALLATION OF HEAVY-DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE.
On file for this project
4 documents · 7 drawing sheets