← Back
Condo, residential tower (mixed-use, multi-family elevator) [derived]
145 WEST 27 STREET
MANHATTAN · BIN 1015064
💬 Discuss this project
1902Year Built
6Stories
RMBuilding Class
M1-8A/R11Zoning
23,760 sfGross Floor Area
11Units
Rent Stabilized27 Open Violations 26 unresolved · 1 paperwork only ▸
Condo, residential tower (mixed-use, multi-family elevator) [derived] · Owner of record: 147 WEST 27TH ST CONDOMINUM · 4,699 sf lot · 5.06 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalFire ProtectionOther
Roof4p · 1 filing · 20 docs
Floor 67p · 1 filing · 20 docs
Floor 5
Floor 4
Floor 3
Floor 21p · 1 filing · 10 docs
Floor 113p · 1 filing · 20 docs
1 job · most recent 01/20/2025
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
01/20/2025Permit IssuedRENOVATION WITH PASSION IAir Conditioning Systems
Cooling
Fujitsu AOU60RLAVM 60,000 BTU · Vrf Outdoor ×1
1 job · most recent 01/20/2025
Sprinkler System
FiledStatusContractorScope
01/20/2025Signed-offORBIT SPRINKLER CORPSprinkler System
1 job · most recent 01/20/2025
Water/Sanitary
FiledStatusContractorScope
01/20/2025Signed-offPROCORE MECHANICAL CORPWater/Sanitary
9 jobs · most recent 08/13/2026
General Wiring
FiledStatusContractorScope
08/13/2026Permit IssuedJAM ELECTRICAL CORPGeneral Wiring
12/16/2025Permit IssuedLINA ELECTRIC, CORPGeneral Wiring
07/03/2025CompleteJOSEPH WEINSTEIN ELECTRICGeneral Wiring
08/26/2024Permit IssuedMARTINEZ ELECTRICAL CONTGeneral Wiring
02/28/2024CompleteDENMAR ELECTRIC CORPGeneral Wiring
07/13/2023CompleteACCURATE ELEC'L CORP.General Wiring
08/22/2022CompleteADAM ELECL CONTRNG LLCGeneral Wiring
12/10/2021CompleteGILSTON BROTHERS ELECT'L12 meters
11/02/2021CompleteLINA ELECTRIC, CORP—
Building Lifecycle
All (172)Filed (15)Permit Issued (12)Signed Off (9)Violation (60)Inspection (14)Objection (32)Special Inspection (30)
09/01/2026
Violation issued (HPD, open)
B
09/01/2026
Violation issued (HPD, open)
B
06/23/2026
Signed off — Alteration
M01144955-I1
06/17/2026
Permit issued — General Construction
M01144955-I1-GC
03/31/2026
Violation issued (HPD, open)
B
03/31/2026
Violation issued (HPD, open)
B
03/17/2025
Signed off — Alteration
MINOR PLUMBING WORK AT EXISTING STORE, ALL AS PER PLAN.
M00962888-I1
03/13/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
01/28/2025
Special inspection requirement — Tenant Protection Plan Compliance
jon libasci
01/28/2025
Special inspection requirement — Fire-Resistance Rated Construction
jon libasci
01/20/2025
Filed — Alteration
MINOR PLUMBING WORK AT EXISTING STORE, ALL AS PER PLAN.
M00962888-P1
01/15/2025
Special inspection requirement — Tenant Protection Plan Compliance
01/14/2025
Special inspection requirement — Fire-Resistance Rated Construction
jon libasci
01/08/2025
Violation issued (ECB, open)
Construction
12/16/2024
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
11/27/2024
Signed off — Alteration
MINOR PLUMBING WORK AT EXISTING STORE, ALL AS PER PLAN.
M00962888-S2
11/27/2024
Signed off — Alteration
MINOR PLUMBING WORK AT EXISTING STORE, ALL AS PER PLAN.
M00962888-S1
11/22/2024
Filed — Alteration
M01144955-I1
09/18/2024
Signed off — Alteration
INSTALL STEEL BEAMS TO REINFORCE EXISTING 1ST FLOOR REAR ROOF. INSTALL WALL BRACKET FOR HVAC.
M01008347-I1
09/11/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
09/06/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
09/06/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
07/09/2024
Permit issued — Structural
M01008347-I1-ST
07/09/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
05/18/2024
Violation issued (HPD, open)
B
05/09/2024
Signed off — Alteration
NEW SPLIT AC UNIT SYSTEMS, NEW EXHAUST SYSTEM FOR BATHROOM, NEW EXHAUST SYSTEM FOR LAUNDRY ROOM
M00626635-S2
05/02/2024
Signed off — Alteration
NEW SPLIT AC UNIT SYSTEMS, NEW EXHAUST SYSTEM FOR BATHROOM, NEW EXHAUST SYSTEM FOR LAUNDRY ROOM
M00626635-S3
05/01/2024
Signed off — Alteration
NEW SPLIT AC UNIT SYSTEMS, NEW EXHAUST SYSTEM FOR BATHROOM, NEW EXHAUST SYSTEM FOR LAUNDRY ROOM
M00626635-S1
04/11/2024
Filed — Alteration
INSTALL STEEL BEAMS TO REINFORCE EXISTING 1ST FLOOR REAR ROOF. INSTALL WALL BRACKET FOR HVAC.
M01008347-I1
04/11/2024
Special inspection requirement — Tenant Protection Plan Compliance
jon libasci
04/09/2024
Special inspection requirement — Post-installed Anchors
Harry Hong
04/09/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Harry Hong
04/09/2024
Special inspection requirement — Structural Steel - Details
Harry Hong
04/09/2024
Special inspection requirement — Structural Steel - High Strength Bolting
Harry Hong
04/09/2024
Special inspection requirement — Structural Steel - Welding
Harry Hong
04/05/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
03/11/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
03/01/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/20/2024
Special inspection requirement — Final
Harry Hong
01/05/2024
Permit issued — Mechanical Systems
M00962888-S3-MS
01/04/2024
Permit issued — Sprinklers
M00962888-S2-EW-SP
01/02/2024
Permit issued — Plumbing
M00962888-S1-PL
12/15/2023
Signed off — Alteration
NEW SPLIT AC UNIT SYSTEMS, NEW EXHAUST SYSTEM FOR BATHROOM, NEW EXHAUST SYSTEM FOR LAUNDRY ROOM
M00626635-I1
12/14/2023
Permit issued — General Construction
M00962888-I1-GC
12/12/2023
Filed — Alteration
MINOR PLUMBING WORK AT EXISTING STORE, ALL AS PER PLAN.
M00962888-S2
12/12/2023
Filed — Alteration
MINOR PLUMBING WORK AT EXISTING STORE, ALL AS PER PLAN.
M00962888-S1
12/12/2023
Filed — Alteration
MINOR PLUMBING WORK AT EXISTING STORE, ALL AS PER PLAN.
M00962888-S3
12/12/2023
Special inspection requirement — Tenant Protection Plan Compliance
Robert Concessi
12/12/2023
Special inspection requirement — Tenant Protection Plan Compliance
Robert Concessi
12/12/2023
Special inspection requirement — Tenant Protection Plan Compliance
Robert Concessi
12/06/2023
Special inspection requirement — Mechanical Systems
Robert Concessi
12/06/2023
Special inspection requirement — Sprinkler Systems
Robert Concessi
12/06/2023
Special inspection requirement — Final
Robert Concessi
12/04/2023
Objection resolved — Addressed
11/29/2023
Objection resolved — Addressed
11/20/2023
Objection raised — Scope
11/20/2023
Objection raised — Scope
11/15/2023
Filed — Alteration
MINOR PLUMBING WORK AT EXISTING STORE, ALL AS PER PLAN.
M00962888-I1
10/01/2023
Violation issued (HPD, open)
A
10/01/2023
Violation issued (HPD, closed)
B
Latest 60 of 172 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
147 W 27TH CONDOMIMUM C/O103/22/2026
147 WEST 27TH ST CONDOMIN1303/22/2026
147 WEST 27 STREET CONDOM403/22/2026
147 W 27TH ST CONDOMINIUM103/22/2026
145 W 27 ST CONDO203/22/2026
145 WEST 27TH ST CONDOMINIUM703/22/2026
19 W 36 ST HOLDING COR403/22/2026
19 W 36ST HOLDING CO103/22/2026
19 WEST 36 ST HOLDING303/22/2026
19 W. 36 ST HOLDING CO103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
LUKE LICALZI, P.E., P.C.201/20/2025
AG ENGINEERING PLLC111/22/2024
H2 CONSULTING PE PC104/11/2024
CONCESSI ENGINEERING, P.C.312/12/2023
JACK GREEN ASSOCIATES607/11/2023
RAWLINS DESIGN INC.210/21/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
GRS CONSULTING SERVICES1003/21/2026
M W EXPEDITING203/21/2026
CODE1603/21/2026
H2 CONSULTING PE PC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
RENOVATION WITH PASSION IGeneral Contractor707/08/2026
KIMCO PAINTING AND CONSTRGeneral Contractor407/08/2026
CCM DESIGN & CONSULTING *General Contractor207/08/2026
LUPO, CIROElectrical103/21/2026
MEGA PLBG CORPFire Protection107/08/2026
ORBIT SPRINKLER CORPFire Protection107/08/2026
J&D MAINTENANCE CORPGeneral Contractor106/28/2026
EH PLUMBING & HEATING CORPlumbing107/08/2026
EMIL KRSLOVICElectrical103/21/2026
PROCORE MECHANICAL CORPPlumbing107/08/2026
GOHDE, AUGUSTElectrical103/21/2026
JOSEPH WEINSTEIN ELECTRICElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MOHAMMAD AHEAD - PROFESSI9286111/22/2024
H2 CONSULTING PE PC835104/11/2024
JON LIBASCI3068204/11/2024
CONCESSI ENGINEERING, P.C540312/12/2023
JACK GREEN ASSOCIATES422807/11/2023
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offJ&D MAINTENANCE CORP06/17/2026
DOB NOWStructuralSigned-offRENOVATION WITH PASSION I07/09/2024
DOB NOWMechanical SystemsPermit IssuedRENOVATION WITH PASSION I01/05/2024
DOB NOWSprinklersSigned-offORBIT SPRINKLER CORP01/04/2024
DOB NOWPlumbingSigned-offPROCORE MECHANICAL CORP01/02/2024
DOB NOWGeneral ConstructionSigned-offRENOVATION WITH PASSION I12/14/2023
DOB NOWGeneral ConstructionSigned-offKIMCO PAINTING AND CONSTR10/21/2022
DOB NOWMechanical SystemsSigned-offKIMCO PAINTING AND CONSTR10/21/2022
DOB NOWSprinklersSigned-offREAL PLUMBING CORP09/28/2022
DOB NOWPlumbingSigned-offEH PLUMBING & HEATING COR06/09/2022
DOB NOWGeneral ConstructionSigned-offCCM DESIGN & CONSULTING *05/04/2022
DOB NOWMechanical SystemsSigned-offCCM DESIGN & CONSULTING *04/27/2022
BISOTISSUEDSOKOL BUILDING & RENOVATI12/22/2008
BISPLISSUEDTMS PLMBG & HTG CORP12/10/2008
BISOTISSUEDSOKOL BUILDING & RENOVATION CORP09/12/2008
BISMHISSUEDSOKOL BUILDING & RENOVATION CORP09/12/2008
BISMHISSUEDU.A CONSTRUCTION CORP08/01/2006
BISOTISSUEDNEWMARK & CO RE INC11/30/2005
BISFPISSUEDB AND J FIRE INC/FIREMASTER06/12/2002
BISFPISSUEDIDEAL FIRE CONTROL INC11/27/1992
BISOTISSUEDA INTERNATIONAL LTD09/24/1992
▾Field Inspections (DOB CAP) — 14
DateTypeResultReport
03/13/2025Pass-Final General Construction Non-Directive 14PassView ↗
12/16/2024Fail-Final General Construction Non-Directive 14FailView ↗
09/11/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
09/06/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
09/06/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
07/09/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/05/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
03/11/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
03/01/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/14/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
02/10/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
01/27/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
09/15/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
09/15/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 40
DateRequirementInspectorRole
01/28/2025Tenant Protection Plan Compliancejon libascispecial
01/28/2025Fire-Resistance Rated Constructionjon libasciprogress
01/15/2025Tenant Protection Plan Compliance—special
01/14/2025Fire-Resistance Rated Constructionjon libasciprogress
04/11/2024Tenant Protection Plan Compliancejon libascispecial
04/09/2024Post-installed AnchorsHarry Hongspecial
04/09/2024Structural Stability – Alterations of existing buildingsHarry Hongspecial
04/09/2024Structural Steel - DetailsHarry Hongspecial
04/09/2024Structural Steel - High Strength BoltingHarry Hongspecial
04/09/2024Structural Steel - WeldingHarry Hongspecial
02/20/2024FinalHarry Hongprogress
12/12/2023Tenant Protection Plan ComplianceRobert Concessispecial
12/12/2023Tenant Protection Plan ComplianceRobert Concessispecial
12/12/2023Tenant Protection Plan ComplianceRobert Concessispecial
12/06/2023Mechanical SystemsRobert Concessispecial
12/06/2023Sprinkler SystemsRobert Concessispecial
12/06/2023FinalRobert Concessiprogress
06/29/2023HVAC-R and service water heating equipmentJACK GREENenergy_progress
06/29/2023Maintenance informationJACK GREENenergy_progress
06/29/2023HVAC-R and service water piping design and insulationJACK GREENenergy_progress
06/29/2023Mechanical SystemsJACK GREENspecial
06/29/2023Energy Code Compliance InspectionsJACK GREENprogress
06/29/2023FinalJACK GREENprogress
06/29/2023Shutoff dampersJACK GREENenergy_progress
06/29/2023HVAC-R and service water heating system controlsJACK GREENenergy_progress
Latest 25 of 40.
▾Documents — 123 on file (BIS + DOB NOW)
▸Plans & Drawings15
▸DOB NOWPlans/Sketch15
09/02/2026M00626635-P4Request digital key ↗
09/02/2026M00626635-S1Request digital key ↗
09/02/2026M00626635-P1Request digital key ↗
Showing 3 of 15 on file for this type
▸Applications & Permits16
▸BISPLAN / WORK APPROVAL APPLICATION11
06/10/2025124055388Open ↗
05/21/2025100495206Open ↗
05/21/2025102785121Open ↗
Showing 3 of 11 on file for this type
▸BISWORK PERMIT APPLICATION5
12/22/2008110340998Open ↗
12/22/2008110340998Open ↗
12/10/2008110340998Open ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications56
▸DOB NOWProgress Inspector Seal & Signature18
09/01/2026M00962888-P1Open ↗
09/01/2026M00962888-S3Open ↗
08/31/2026M00626635-P4Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature17
09/01/2026M00962888-S3Open ↗
09/01/2026M00962888-S3Open ↗
09/01/2026M00626635-S1Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature15
09/02/2026M00626635-S1Open ↗
09/02/2026M00626635-S2Open ↗
09/02/2026M00626635-S3Open ↗
Showing 3 of 15 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
09/15/2008110340970Open ↗
09/11/2008110340998Open ↗
09/11/2008110340998Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
09/11/2008110340998Open ↗
09/11/2008110340998Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
09/11/2008110340998Open ↗
▸Trade Schedules & Equipment5
▸BISSELF-CERT PLUMBING NOTICE3
01/20/2009110340998Open ↗
01/20/2009110340998Open ↗
12/18/2008110340998Open ↗
▸BISSCHEDULE B - PLUMBING2
09/15/2008110340970Open ↗
09/11/2008110340998Open ↗
▸Environmental & Asbestos18
▸DOB NOWDEP ACP-5: Asbestos Assessment Report15
09/02/2026M00626635-S1Open ↗
08/28/2026M00962888-I1Open ↗
08/27/2026M01008347-I1Open ↗
Showing 3 of 15 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'3
09/15/2008110340970Open ↗
09/11/2008110340998Open ↗
09/11/2008110340998Open ↗
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis2
08/13/2026M00626635-I1Open ↗
08/13/2026M00626635-S2Open ↗
▸Approvals, Objections & Sign-offs5
▸BISADMINISTRATIVE OBJECTIONS2
09/15/2008110340970Open ↗
09/11/2008110340998Open ↗
▸BISCONSTRUCTION (OT) SIGNOFF1
01/03/2025104277667Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
01/03/2025104277667Open ↗
▸BISSCHEDULE A - OCCUPANCY / USE1
06/10/2025124055388Open ↗
▸Cost, Insurance & Ownership4
▸BISCOST AFFIDAVIT3
09/15/2008110340970Open ↗
09/11/2008110340998Open ↗
09/11/2008110340998Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
01/03/2025104277667Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
06/10/2025124055388Open ↗
▸Other Documents1
▸BISPLOT DIAGRAM1
06/10/2025124055388Open ↗