Whole building & multi-floor projectsMuseum of Broadway2 filings
Minor partition work at 1st floor, change of use from current use groups to proposed Use group 3A on Cellar, 1st 2nd and 3rd.
On file for this project
22 documents · 6 drawing sheets
FIRESTOP ALL FLOOR, CEILING, AND WALL PENESTRATION CREATED BY SPRINKLER SYSTEM. NO CHANGE IN USE, EGRESS, AND OCCUPANCY.
On file for this project
16 documents · 1 drawing sheet
RoofAini Assets LLC1p · 2 filings · 4 docs
ArchitectureElectricalFire ProtectionMechanical
Issued Permit Scope
Antenna · General Construction · Sprinklers · Standpipe
Modification to existing VERIZON site. Install 2 antennas, replace 4 antennas and 6 RRH units, and replace 2 cabinets and install 1 cabinet on existing platform on the roof.
On file for this project
3 documents · 1 drawing sheet
Installation of Verizon antenna sectors, GPS antennas, and platform with related equipment. All in conformance with TPPN 5/98. No change in use, egress, or occupancy.
On file for this project
3 documents · 1 drawing sheet
PenthouseEffy Group4p · 3 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe
INTERIOR RENOVATION FOR OFFICE SPACE
On file for this project
12 documents · 1 drawing sheet
FILED HEREWIITH FOR PLUMBING WORK TYPE IN CONJUNCTION WITH APPLICATION NO. M00908586. NO CHANGE TO USE, OCCUPANCY, OR EGRESS.
On file for this project
9 documents · 2 drawing sheets
INSTALL NEW AIR CONDITIONING SYSTEM ON THE 11TH, 12TH AND PENTHOUSE LEVEL. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION
On file for this project
17 documents · 1 drawing sheet
Floor 12Effy Group9p · 3 filings · 20 docs
ArchitectureFire ProtectionGeneralMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe
INTERIOR RENOVATION FOR OFFICE SPACE
On file for this project
12 documents · 4 drawing sheets
FILED HEREWIITH FOR PLUMBING WORK TYPE IN CONJUNCTION WITH APPLICATION NO. M00908586. NO CHANGE TO USE, OCCUPANCY, OR EGRESS.
On file for this project
9 documents · 4 drawing sheets
INSTALL NEW AIR CONDITIONING SYSTEM ON THE 11TH, 12TH AND PENTHOUSE LEVEL. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION
On file for this project
17 documents · 1 drawing sheet
Floor 11Effy Group8p · 5 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe
FILE HEREWITH MECHANICAL WORK AS PER PLAN AT EXISTING COMMERCIAL BUILDING @ 10TH FLOOR AND 11TH FLOOR. NO CHANGE TO USE,EGRESS OR OCCUPANCY.
On file for this project
6 documents · 1 drawing sheet
PROPOSE INTERIOR FIT OUT OF EXISTING COMMERCIAL SPACE, WORK INVOLVING PARTITION AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
On file for this project
37 documents · 4 drawing sheets
HEREWITH FILING THE PLUMBING WORK TYPE IN CONJUNCTION WITH JOB #M00679067. NO CHANGE IN USE, EGRESS, AND OCCUPANCY.
On file for this project
18 documents · 1 drawing sheet
Latest 3 of 5 filings on this floor.
Floor 10Effy Group8p · 4 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe
FILE HEREWITH MECHANICAL WORK AS PER PLAN AT EXISTING COMMERCIAL BUILDING @ 10TH FLOOR AND 11TH FLOOR. NO CHANGE TO USE,EGRESS OR OCCUPANCY.
On file for this project
6 documents · 1 drawing sheet
PROPOSE INTERIOR FIT OUT OF EXISTING COMMERCIAL SPACE, WORK INVOLVING PARTITION AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
On file for this project
37 documents · 5 drawing sheets
HEREWITH FILING THE PLUMBING WORK TYPE IN CONJUNCTION WITH JOB #M00679067. NO CHANGE IN USE, EGRESS, AND OCCUPANCY.
On file for this project
18 documents · 1 drawing sheet
Latest 3 of 4 filings on this floor.
Floor 9Effy Group, WWUnder Construction4p · 4 filings · 3 docs
ArchitectureDMElectricalFire ProtectionGeneralMechanical
Issued Permit Scope
General Construction · Mechanical Systems · Sprinklers · Standpipe
FILING FOR INTERIOR RENOVATION FOR THE BUILT-OUT OF NEW OFFICE SPACE ON THE 9TH FLOOR. WORK TO INCLUDE AND NOT LIMITED TO PARTITIONS, DOORS, & FINISHES. NO CHANGE TO USE, OCCUPANCY, OR EGRESS.
On file for this project
3 documents · 3 drawing sheets
Interior demolition of non-structural partition and finishes. No change in use, egress and occupancy.
On file for this project
5 documents · 1 drawing sheet
General construction work as shown on plans.
On file for this project
3 documents
Latest 3 of 4 filings on this floor.
Floor 8Effy Group, WeWork19p · 3 filings · 20 docs
ArchitectureDMElectricalFire ProtectionGeneralPlumbing
Issued Permit Scope
General Construction · Plumbing · Sprinklers · Standpipe
PROPOSED INTERIOR FIT OUT OF EXISTING COMMERCIAL SPACE FROM 7TH TO 8TH FLOOR, WORK INVOLVING INTERIOR PARTITION, PLUMBING & MECHANICAL WORK AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY
On file for this project
26 documents · 15 drawing sheets
Interior demolition of non-structural partition and finishes. No change in use, egress and occupancy.
On file for this project
5 documents · 1 drawing sheet
Proposed Tenant Modification for 1 hour stair enclosure to existing non-egress convenience stair at 7th and 8th floors. No change to egress, use, or occupancy.
On file for this project
3 documents · 3 drawing sheets
Floor 7Effy Group, WeWork17p · 3 filings · 20 docs
ArchitectureDMElectricalFire ProtectionGeneralPlumbing
Issued Permit Scope
General Construction · Plumbing · Sprinklers · Standpipe
PROPOSED INTERIOR FIT OUT OF EXISTING COMMERCIAL SPACE FROM 7TH TO 8TH FLOOR, WORK INVOLVING INTERIOR PARTITION, PLUMBING & MECHANICAL WORK AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY
On file for this project
26 documents · 16 drawing sheets
Interior demolition of non-structural partition and finishes. No change in use, egress and occupancy.
On file for this project
5 documents · 1 drawing sheet
Proposed Tenant Modification for 1 hour stair enclosure to existing non-egress convenience stair at 7th and 8th floors. No change to egress, use, or occupancy.
On file for this project
3 documents
Floor 6550 Stewart Acquisition LLC9p · 4 filings
ArchitectureDMFire ProtectionGeneralMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe
PROPOSE INTERIOR FIT OUT OF EXISTING COMMERCIAL SPACE, WORK INVOLVING PARTITION AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
On file for this project
37 documents · 5 drawing sheets
HEREWITH FILING THE PLUMBING WORK TYPE IN CONJUNCTION WITH JOB #M00679067. NO CHANGE IN USE, EGRESS, AND OCCUPANCY.
On file for this project
18 documents · 2 drawing sheets
INTERIOR DEMOLITION OF EXISTING COMMERCIAL SPACE, WORK ON FLOOR 6, 10 AND 11 ONLY. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
On file for this project
12 documents · 1 drawing sheet
Latest 3 of 4 filings on this floor.
Floor 5550 Stewart Acquisition LLC9p · 2 filings
ArchitectureElectricalFire ProtectionGeneralPlumbing
Issued Permit Scope
General Construction · Plumbing · Sprinklers · Standpipe
PROPOSE INTERIOR FIT OUT OF EXISTING COMMERCIAL SPACE, WORK INVOLVING PARTITION AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
On file for this project
37 documents · 8 drawing sheets
HEREWITH FILING THE PLUMBING WORK TYPE IN CONJUNCTION WITH JOB #M00679067. NO CHANGE IN USE, EGRESS, AND OCCUPANCY.
On file for this project
18 documents · 1 drawing sheet
Floor 4
Floor 3Museum of Broadway20p · 13 filings
ArchitectureDMFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
Interior renovation of existing cellar, 1st to 3rd floor. Remove partition and finishing to create white box for tenant fit-out. Install new stair from cellar to 1st floor. No change in egress, occupancy and use.
On file for this project
7 documents · 1 drawing sheet
This Alteration application is being filed for the mechanical work duct work humidifiers, electric wall heaters and air curtain. on floors Cellar, 001 to 003 floors. There are no change in use, egress or occupancy.
On file for this project
15 documents · 2 drawing sheets
Interior partition work on cellar, 1st, 2nd and 3rd floors. Install new convenience stair between 3rd and 2nd floor. No change to use, occupancy of egress under this application.
On file for this project
12 documents · 6 drawing sheets
Latest 3 of 13 filings on this floor.
Floor 2Museum of Broadway19p · 11 filings
ArchitectureDMFire ProtectionGeneralMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers
Interior renovation of existing cellar, 1st to 3rd floor. Remove partition and finishing to create white box for tenant fit-out. Install new stair from cellar to 1st floor. No change in egress, occupancy and use.
On file for this project
7 documents · 2 drawing sheets
This Alteration application is being filed for the mechanical work duct work humidifiers, electric wall heaters and air curtain. on floors Cellar, 001 to 003 floors. There are no change in use, egress or occupancy.
On file for this project
15 documents · 2 drawing sheets
Interior partition work on cellar, 1st, 2nd and 3rd floors. Install new convenience stair between 3rd and 2nd floor. No change to use, occupancy of egress under this application.
On file for this project
12 documents · 4 drawing sheets
Latest 3 of 11 filings on this floor.
Floor 1Museum of Broadway23p · 11 filings
ArchitectureDMFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
Interior renovation of existing cellar, 1st to 3rd floor. Remove partition and finishing to create white box for tenant fit-out. Install new stair from cellar to 1st floor. No change in egress, occupancy and use.
On file for this project
7 documents · 3 drawing sheets
This Alteration application is being filed for the mechanical work duct work humidifiers, electric wall heaters and air curtain. on floors Cellar, 001 to 003 floors. There are no change in use, egress or occupancy.
On file for this project
15 documents · 2 drawing sheets
Interior partition work on cellar, 1st, 2nd and 3rd floors. Install new convenience stair between 3rd and 2nd floor. No change to use, occupancy of egress under this application.
On file for this project
12 documents · 8 drawing sheets
Latest 3 of 11 filings on this floor.
CellarMuseum of Broadway20p · 12 filings
ArchitectureDMFire ProtectionGeneralMechanicalPlumbing
Issued Permit Scope
Boiler Equipment · General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe
Interior renovation of existing cellar, 1st to 3rd floor. Remove partition and finishing to create white box for tenant fit-out. Install new stair from cellar to 1st floor. No change in egress, occupancy and use.
On file for this project
7 documents · 3 drawing sheets
This Alteration application is being filed for the mechanical work duct work humidifiers, electric wall heaters and air curtain. on floors Cellar, 001 to 003 floors. There are no change in use, egress or occupancy.
On file for this project
15 documents · 2 drawing sheets
Interior partition work on cellar, 1st, 2nd and 3rd floors. Install new convenience stair between 3rd and 2nd floor. No change to use, occupancy of egress under this application.
On file for this project
12 documents · 5 drawing sheets
Latest 3 of 12 filings on this floor.
BasementAini Assets LLC1p · 1 filing · 3 docs
Mechanical
Installation of Verizon antenna sectors, GPS antennas, and platform with related equipment. All in conformance with TPPN 5/98. No change in use, egress, or occupancy.
On file for this project
3 documents · 1 drawing sheet
Site & exterior550 Stewart Acquisition LLCUnder Construction4 filings · 4 docs
ElectricalEquipmentFire ProtectionGeneralStructural
Issued Permit Scope
Construction Fence · Sidewalk Shed · Sprinklers · Standpipe · Supported Scaffold
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
On file for this project
2 documents · 3 drawing sheets
Construction fence at storefront within 3ft from building.
On file for this project
3 documents · 1 drawing sheet
INSTALLATON OF HEAVYDUTY SIDEWALK SHED FOR REMEDIAL REPAIRS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE 2014 NYC BUILDING CODE.
On file for this project
2 documents · 6 drawing sheets
Latest 3 of 4 filings on this floor.