← Back
BRONX
Artsbridge Senior Housing Condominium
1450 PLIMPTON AVENUE · BIN 2129309
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
6 Open Violations 4 unresolved · 2 paperwork only ▸
Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionGeneralOther
Roof34p · 5 filings · 20 docs
Floor 37p · 1 filing · 20 docs
Floor 253p · 6 filings · 20 docs
Floor 156p · 8 filings · 20 docs
Cellar56p · 9 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
HIGHBRIDGE COMMUNITY DEVELOPMENT CO2903/22/2026
ARTSBRIDGE HOUSING DEVELOPMENT F203/22/2026
ARTSBRIDGE HDFC203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SAKY YAKAS504/01/2025
SHENOY ENGINEERING, P.C.1308/25/2023
KENNY & KHAN ARCHITECTS PC307/25/2023
BITOPI CONSULTANTS LLC207/17/2023
LEVIN ENGINEERING PLLC105/04/2023
WSP203/29/2023
DIBARI ENGINEERING, P.C.102/15/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JMV ASSOCIATES3603/21/2026
A1 EXPEDITING SERVICE CORP.603/21/2026
SOL BUILDING CONSULTING SERVICES L203/21/2026
AK CONSULTING SERVICES403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
INNOVAX-PILLAR INCGeneral Contractor1807/08/2026
ACS SYSTEM ASSOCIATES INC.General Contractor803/21/2026
E.F.G. GENERAL CONTRACTINGeneral Contractor603/21/2026
STEEL CONSTRUCTION LLCGeneral Contractor303/21/2026
A & F FIRE PROTECTION COFire Protection307/08/2026
ANESIS SERVICES CORPFire Protection207/08/2026
RENNON CONSTRUCTION CORPGeneral Contractor203/21/2026
MAR-SAL PLBG & HTG, INCPlumbing107/08/2026
JOE PARZIALE PLUMBING COPlumbing107/08/2026
MULTI-PHASE ELEC'L SVCSElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
FUTURE TECH CONSULTANTS O5891708/25/2023
VIBRANALYSIS INC., DBA VT6864202/15/2023
SITE SAFETY LLC8555111/08/2022
Building Lifecycle
All (140)Filed (27)Permit Issued (23)Signed Off (10)Violation (17)Inspection (19)Objection (14)Special Inspection (30)
04/09/2026
Violation issued (ECB, open)
Construction
04/09/2026
Violation issued (ECB, open)
Construction
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/16/2025
Special inspection requirement — Tenant Protection Plan Compliance
KHALID ALGENDE
04/04/2025
Violation issued (HPD, closed)
C
04/01/2025
Filed — Alteration CO
X08010845-P3
03/28/2025
Special inspection requirement — Tenant Protection Plan Compliance
03/18/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
08/08/2024
Violation issued (HPD, open)
B
08/08/2024
Violation issued (HPD, open)
B
08/08/2024
Violation issued (HPD, open)
C
08/08/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/03/2024
Signed off — Alteration
Provide new HVAC system for heating, cooling and ventilation of SCA spaces, including indoor DOAS, air cooled chiller, pumps, split ACs, Unit ventilators, Fan coils and electric boiler. Lighting work.
X08048078-I1
05/02/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/19/2024
Permit issued — Mechanical Systems
X08048078-I1-MS
04/17/2024
Violation issued (HPD, closed)
A
03/13/2024
Permit issued — General Construction
X08048078-I1-MS
11/15/2023
Violation issued (HPD, closed)
I
10/17/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
10/16/2023
Signed off — Alteration
Interior partition work on cellar & first floor to reconfigure existing storage, office & mechanical rooms; reconstruction of existing corridor on first floor.. This is filed in conjunction with ALT CO X00756684-I1.
X07994793-I1
10/05/2023
Signed off — Alteration
X486 - 3K: STRUCTURAL MODIFICATIONS TO ACCOMMODATE ARCHITECTURAL AND MEP IMPROVEMENTS.
X08021274-I1
10/03/2023
Signed off — Alteration
INSTALLATION OF NEW ELECTRIC BOILER PLANT.
X00907074-I1
10/03/2023
Signed off — Alteration
Minor modification of existing combined sprinkler/standpipe system; Disconnect existing branch line from future tenant zone & reconnect in base building zonE. There is no change to number of existing sprinkler heads under this application.
X00827601-I1
09/28/2023
Permit issued — General Construction
X08010845-I1-GC
09/26/2023
Signed off — Alteration
X486 - 3K: Alteration of sprinkler layout within SCA spaces on cellar, first and second floor to suit the new layout.
X08021665-I1
09/13/2023
Signed off — Alteration
X486 - 3K: SELECTIVE DEMOLITION; SITE IMPROVEMENTS; CONCRETE WORK; MASONRY WORK; STRUCTURAL WORK; METAL WORK; ROUGH AND FINISH CARPENTRY AND CUSTOM CASEWORK; ROOFING WORK; DOOR AND HARDWARE WORK; STOREFRONT AND WINDOW WORK; FINISHES.
X08021234-I1
09/13/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
09/13/2023
Inspection — Certified Sprinkler - SP - Roughing
Certified
View inspection ↗
09/13/2023
Inspection — Certified StandPipe - SD - Fire StandPipe - SD - Roughing
Certified
View inspection ↗
09/13/2023
Inspection — Certified StandPipe-SD-Piping-Hydrostatic Test
Certified
View inspection ↗
09/08/2023
Signed off — Alteration
INSTALLATION OF NEW SIDEWALK SHED AT 1450 PLIMPTON AVE, BRONX AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
X00887116-I1
09/08/2023
Signed off — Alteration
Installation of a Temporary Core Sprinkler Protection with 15 sprinkler heads. As per plans filed herewith, no change to use, occupancy or egress.
X00861866-I1
08/28/2023
Signed off — Alteration
X346-3K: Provide new cold water, hot water, hot water return, waste, and vent distribution to new plumbing fixtures. Installation of non-gas water heater.
X08021661-I1
08/26/2023
Special inspection requirement — Sprinkler Systems
Michael Marchese
08/26/2023
Special inspection requirement — Standpipe Systems
Michael Marchese
08/25/2023
Filed — Alteration
X486 - 3K: Alteration of sprinkler layout within SCA spaces on cellar, first and second floor to suit the new layout.
X08021665-P2
08/25/2023
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
08/24/2023
Special inspection requirement — Sprinkler Systems
Michael Marchese
08/24/2023
Special inspection requirement — Standpipe Systems
Michael Marchese
08/15/2023
Filed — Alteration
INSTALLATION OF NEW ELECTRIC BOILER PLANT.
X00907074-P1
08/15/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Michael Marchese
08/15/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Michael Marchese
08/15/2023
Special inspection requirement — HVAC-R and service water heating equipment
Michael Marchese
08/15/2023
Special inspection requirement — Tenant Protection Plan Compliance
Michael Marchese
08/15/2023
Special inspection requirement — Post-installed Anchors
Michael Marchese
08/15/2023
Special inspection requirement — Heating Systems
Michael Marchese
08/15/2023
Special inspection requirement — HVAC-R and service water heating system controls
Michael Marchese
08/15/2023
Special inspection requirement — Maintenance information
Michael Marchese
08/10/2023
Filed — Alteration CO
X08010845-P2
08/09/2023
Permit issued — Boiler Equipment
X00907074-I1-BE
08/06/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
08/06/2023
Inspection — Certified Sprinkler - SP - Roughing
Certified
View inspection ↗
08/04/2023
Permit issued — Sprinklers
X00861866-I1-EW-SP
07/26/2023
Filed — Alteration
Provide new HVAC system for heating, cooling and ventilation of SCA spaces, including indoor DOAS, air cooled chiller, pumps, split ACs, Unit ventilators, Fan coils and electric boiler. Lighting work.
X08048078-P4
07/26/2023
Filed — Alteration
X486 - 3K: Alteration of sprinkler layout within SCA spaces on cellar, first and second floor to suit the new layout.
X08021665-P1
07/26/2023
Special inspection requirement — Lighting controls
Michael Marchese
07/26/2023
Special inspection requirement — Shutoff dampers
Michael Marchese
07/26/2023
Special inspection requirement — Maintenance information
Michael Marchese
07/26/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Michael Marchese
07/26/2023
Special inspection requirement — Electrical motors and elevators
Michael Marchese
Latest 60 of 140 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offACS SYSTEM ASSOCIATES INC.04/19/2024
DOB NOWGeneral ConstructionSigned-offACS SYSTEM ASSOCIATES INC.03/13/2024
DOB NOWGeneral ConstructionPermit IssuedE.F.G. GENERAL CONTRACTIN09/28/2023
DOB NOWBoiler EquipmentSigned-offJOE PARZIALE PLUMBING CO08/09/2023
DOB NOWSprinklersSigned-offADVANCED AUTO SPR.CO.,INC08/04/2023
DOB NOWSidewalk ShedSigned-offSTEEL CONSTRUCTION LLC06/24/2023
DOB NOWSidewalk ShedSigned-offRENNON CONSTRUCTION CORP06/11/2023
DOB NOWGeneral ConstructionSigned-offINNOVAX-PILLAR INC06/02/2023
DOB NOWStandpipeSigned-offTHOMAS FAY05/05/2023
DOB NOWStandpipeSigned-offTHOMAS FAY05/04/2023
DOB NOWMechanical SystemsPermit IssuedINNOVAX-PILLAR INC04/27/2023
DOB NOWGeneral ConstructionSigned-offINNOVAX-PILLAR INC04/27/2023
DOB NOWStructuralSigned-offINNOVAX-PILLAR INC04/27/2023
DOB NOWStructuralSigned-offINNOVAX-PILLAR INC04/13/2023
DOB NOWPlumbingSigned-offMAR-SAL PLBG & HTG, INC03/31/2023
DOB NOWStandpipeSigned-offADVANCED AUTO SPR.CO.,INC03/10/2023
DOB NOWSprinklersSigned-offADVANCED AUTO SPR.CO.,INC03/10/2023
DOB NOWMechanical SystemsSigned-offINNOVAX-PILLAR INC03/03/2023
DOB NOWMechanical SystemsSigned-offACS SYSTEM ASSOCIATES INC.03/03/2023
DOB NOWGeneral ConstructionPermit IssuedINNOVAX-PILLAR INC03/03/2023
DOB NOWGeneral ConstructionPermit IssuedACS SYSTEM ASSOCIATES INC.03/03/2023
DOB NOWGeneral ConstructionSigned-offINNOVAX-PILLAR INC02/24/2023
DOB NOWGeneral ConstructionSigned-offE.F.G. GENERAL CONTRACTIN09/06/2022
1 job · most recent 11/18/2022
Air Conditioning Systems Cooling Towers Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
11/18/2022Permit IssuedINNOVAX-PILLAR INCAir Conditioning Systems, Cooling Towers, Heating Systems, Ventilation Systems
Cooling
Mitsubishi Electric PLA-A12EA7 & PUY-A12NKA7 450 CFM · Split System ×8
BSQ-240 450 CFM · Vrf Outdoor ×2
PKA-A36KA7 & PUY-A36NKA7 188 CFM · Split System ×2
SPLIT HEAT PUMP 320 CFM · Heat Pump Outdoor ×2
Heating
Lochinvar BW2081090C 90 kW · Boiler ×2
Ventilation
Greenheck BSQ-240 8,000 CFM · Exhaust Fan ×4
G-100HP-VG 470 CFM · Exhaust Fan ×2
G-103HP-VG 800 CFM · Exhaust Fan ×2
GB-161HP 1,250 CFM · Exhaust Fan ×2
Petra PAH-100 8,250 CFM · Doas ×2
Cooling Tower
Aermec NYCB00500FAJ900 60 tons · Air Cooled Chiller ×2
4 jobs · most recent 04/12/2024
General Wiring
FiledStatusContractorScope
04/12/2024CompleteMULTI-PHASE ELEC'L SVCSGeneral Wiring
03/19/2024CompleteMULTI-PHASE ELEC'L SVCS1 new_meters
06/23/2023CompleteAUJLA ELECTRIC CORP—
03/06/2023CompleteMULTI-PHASE ELEC'L SVCS—
▾Field Inspections (DOB CAP) — 19
DateTypeResultReport
03/18/2025Pass-Final CND-Occupancy InspectionPassView ↗
08/08/2024Pass-Final CND-Occupancy InspectionPassView ↗
10/17/2023Pass-Final CND-Occupancy InspectionPassView ↗
09/13/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
09/13/2023Certified Sprinkler - SP - RoughingCertifiedView ↗
09/13/2023Certified StandPipe - SD - Fire StandPipe - SD - RoughingCertifiedView ↗
09/13/2023Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
08/25/2023Pass-Final Boiler Equipment InspectionPassView ↗
08/06/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
08/06/2023Certified Sprinkler - SP - RoughingCertifiedView ↗
06/21/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/02/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/19/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/19/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
05/16/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
05/16/2023Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
05/11/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
05/11/2023Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
04/28/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 137
DateRequirementInspectorRole
04/16/2025Tenant Protection Plan ComplianceKHALID ALGENDEspecial
03/28/2025Tenant Protection Plan Compliance—special
08/26/2023Standpipe SystemsMichael Marchesespecial
08/26/2023Sprinkler SystemsMichael Marchesespecial
08/24/2023Sprinkler SystemsMichael Marchesespecial
08/24/2023Standpipe SystemsMichael Marchesespecial
08/15/2023HVAC-R and service water piping design and insulationMichael Marcheseenergy_progress
08/15/2023HVAC-R and service water heating system controlsMichael Marcheseenergy_progress
08/15/2023Heating SystemsMichael Marchesespecial
08/15/2023HVAC-R and service water heating equipmentMichael Marcheseenergy_progress
08/15/2023Maintenance informationMichael Marcheseenergy_progress
08/15/2023Fire-Resistant Penetrations and JointsMichael Marchesespecial
08/15/2023Tenant Protection Plan ComplianceMichael Marchesespecial
08/15/2023Post-installed AnchorsMichael Marchesespecial
07/26/2023Shutoff dampersMichael Marcheseenergy_progress
07/26/2023Sprinkler SystemsMichael Marchesespecial
07/26/2023Standpipe SystemsMichael Marchesespecial
07/26/2023Post-installed AnchorsMichael Marchesespecial
07/26/2023Exterior lighting powerMichael Marcheseenergy_progress
07/26/2023HVAC-R and service water piping design and insulationMichael Marcheseenergy_progress
07/26/2023Interior lighting powerMichael Marcheseenergy_progress
07/26/2023HVAC-R and service water heating equipmentMichael Marcheseenergy_progress
07/26/2023Fire-Resistant Penetrations and JointsMichael Marchesespecial
07/26/2023Heating SystemsMichael Marchesespecial
07/26/2023Mechanical SystemsMichael Marchesespecial
Latest 25 of 137.
▾Documents — 149 on file (BIS + DOB NOW)
▸Plans & Drawings27
▸DOB NOWPlans/Sketch27
08/24/2026X07994793-I1Request digital key ↗
08/23/2026X08021234-P1Request digital key ↗
08/23/2026X08021234-P2Request digital key ↗
Showing 3 of 27 on file for this type
▸Applications & Permits1
▸BISPLAN / WORK APPROVAL APPLICATION1
05/21/2021220737889Open ↗
▸Zoning, Tax Lot & Property Records5
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
06/30/2021220737889Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
06/30/2021220737889Open ↗
▸BISADDRESS: NEW HOUSE NUMBER APPROVED1
06/30/2021220737889Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
06/30/2021220737889Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026X08010845-I1Open ↗
▸Seals & Professional Certifications64
▸DOB NOWDPL-1: Design Professional Seal & Signature27
08/24/2026X07994793-I1Open ↗
08/23/2026X08021234-I1Open ↗
08/23/2026X08021234-P1Open ↗
Showing 3 of 27 on file for this type
▸DOB NOWProgress Inspector Seal & Signature20
09/23/2026X00907074-I1Open ↗
08/31/2026X07994793-I1Open ↗
08/28/2026X08021234-P2Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature17
09/23/2026X00907074-I1Open ↗
09/23/2026X00907074-I1Open ↗
09/02/2026X00861866-I1Open ↗
Showing 3 of 17 on file for this type
▸Safety & Tenant Protection7
▸DOB NOWStreet Tree Checklist4
08/22/2026X08010845-P3Open ↗
08/22/2026X08010845-P2Open ↗
08/22/2026X08010845-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026X08010845-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026X08010845-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026X08010845-I1Open ↗
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form6
08/23/2026X08021234-I1Open ↗
08/23/2026X08021274-I1Open ↗
08/23/2026X08048078-I1Open ↗
Showing 3 of 6 on file for this type
▸Energy Compliance1
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026X08048078-I1Open ↗
▸Approvals, Objections & Sign-offs31
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter27
08/23/2026X00887116-I1Open ↗
08/22/2026X08010845-P3Open ↗
08/22/2026X08010845-I1Open ↗
Showing 3 of 27 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION3
06/30/2021220737889Open ↗
06/30/2021220737889Open ↗
06/30/2021220737889Open ↗
▸DOB NOWDEP Variance (V5) letter1
08/13/2026X08048078-I1Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
05/21/2021220737889Open ↗
▸Other Documents6
▸DOB NOWProperty Ownership Certification4
08/22/2026X08010845-P2Open ↗
08/22/2026X08010845-P3Open ↗
08/22/2026X08010845-I1Open ↗
Showing 3 of 4 on file for this type
▸BISPLOT DIAGRAM1
06/30/2021220737889Open ↗
▸DOB NOWFinal Survey1