← Back
BROOKLYN
The 1451 59th Street Condominium
1451 59 STREET · Borough Park · BIN 3427443
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
0 Open ViolationsFDNY Report ↗
Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionEquipmentGeneral
Roof34p · 4 filings · 20 docs
Floor 342p · 5 filings · 20 docs
Floor 242p · 5 filings · 20 docs
Floor 141p · 6 filings · 20 docs
Cellar46p · 6 filings · 20 docs
Site & exterior34p · 5 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
1451 59 LLC1903/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/04/2018$1.3M—Private party → 1451 59 LLC— not available
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BSD CONSULTING203/21/2026
AE DESIGN SOLUTION203/21/2026
ERETZ BUILDERS ASSISTANCE.1803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
HI-TOWER CONTRACTORS INCGeneral Contractor1207/08/2026
POWERS BRIDGING & SCAFFOLDINGGeneral Contractor203/21/2026
PLBG P & H INCPlumbing207/08/2026
BRUCHE MECHANICAL NY LLCFire Protection107/08/2026
BEST DEMO INCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
IP CONCRETE TESTING AND I62521112/12/2023
Building Lifecycle
All (126)Filed (13)Permit Issued (13)Signed Off (8)Inspection (8)Objection (54)Special Inspection (30)
11/14/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/11/2024
Signed off — Alteration
INSTALL NEW FIRE SPRINKLER SYSTEM IN THE ENTIRE BUILDING I.A.W. NFPA 13R 2007 EDIT, AS MODIFIED BY NYC BC 2014 APPENDIX Q AS PER PLAN, IN CONJUNCTION W/ NYC DOB NOW JOB #: B00710482. ALSO FOR REFERENCE SEE JOB #: B00765857.
B00766276-I1
03/11/2024
Signed off — Alteration
INSTALLATION OF PIPING AND PLUMBING FIXTURES IN NEW 3-FAMILY RESIDENCE. IN CONJUNCTION WITH NB JOB # B00710482
B00765754-I1
02/28/2024
Signed off — Alteration
INSTALLATION OF NEW MECHANICAL SYSTEMS ASSOCIATED DUCTS AND PIPING, TO NEW 3 STORY 3 FAMILY BUILDING. IN CONJUNCTION WITH NB#B00710482
B00765748-I1
02/07/2024
Special inspection requirement — Lighting in dwelling units
INDARDEO PARBHUNATH
02/07/2024
Special inspection requirement — Air barrier - visual inspection
INDARDEO PARBHUNATH
02/07/2024
Special inspection requirement — Subgrade Inspections
INDARDEO PARBHUNATH
02/07/2024
Special inspection requirement — Exterior lighting power
INDARDEO PARBHUNATH
02/07/2024
Special inspection requirement — Permanent certificate
INDARDEO PARBHUNATH
02/07/2024
Special inspection requirement — Protection of exposed foundation insulation
INDARDEO PARBHUNATH
02/07/2024
Special inspection requirement — Interior lighting power
INDARDEO PARBHUNATH
02/07/2024
Special inspection requirement — Maintenance information
INDARDEO PARBHUNATH
02/07/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
INDARDEO PARBHUNATH
02/07/2024
Special inspection requirement — Metering
INDARDEO PARBHUNATH
02/07/2024
Special inspection requirement — Fenestration areas
INDARDEO PARBHUNATH
02/07/2024
Special inspection requirement — Fenestration air leakage
INDARDEO PARBHUNATH
02/07/2024
Special inspection requirement — Insulation placement and R values
INDARDEO PARBHUNATH
02/07/2024
Special inspection requirement — Fire-Resistance Rated Construction
INDARDEO PARBHUNATH
02/07/2024
Special inspection requirement — Energy Code Compliance Inspections
INDARDEO PARBHUNATH
02/07/2024
Special inspection requirement — Concrete - Cast-In-Place
INDARDEO PARBHUNATH
02/07/2024
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
INDARDEO PARBHUNATH
02/07/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
INDARDEO PARBHUNATH
12/12/2023
Filed — New Building
B00710482-P1
12/12/2023
Special inspection requirement — Insulation placement and R values
INDARDEO PARBHUNATH
12/12/2023
Special inspection requirement — Exterior lighting power
INDARDEO PARBHUNATH
12/12/2023
Special inspection requirement — Metering
INDARDEO PARBHUNATH
12/12/2023
Special inspection requirement — Interior lighting power
INDARDEO PARBHUNATH
12/12/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
INDARDEO PARBHUNATH
12/12/2023
Special inspection requirement — Protection of exposed foundation insulation
INDARDEO PARBHUNATH
12/12/2023
Special inspection requirement — Lighting in dwelling units
INDARDEO PARBHUNATH
12/12/2023
Special inspection requirement — Fenestration areas
INDARDEO PARBHUNATH
12/12/2023
Special inspection requirement — Concrete - Cast-In-Place
INDARDEO PARBHUNATH
12/12/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
INDARDEO PARBHUNATH
12/12/2023
Special inspection requirement — Subgrade Inspections
INDARDEO PARBHUNATH
12/12/2023
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
INDARDEO PARBHUNATH
12/06/2023
Filed — Alteration
INSTALLATION OF NEW MECHANICAL SYSTEMS ASSOCIATED DUCTS AND PIPING, TO NEW 3 STORY 3 FAMILY BUILDING. IN CONJUNCTION WITH NB#B00710482
B00765748-P1
11/28/2023
Signed off — Alteration
PROPOSED NEW CURB CUT IN CONJUNCTION WITH GC #B00710482
B00765795-I1
11/27/2023
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
11/06/2023
Filed — Alteration
INSTALL NEW FIRE SPRINKLER SYSTEM IN THE ENTIRE BUILDING I.A.W. NFPA 13R 2007 EDIT, AS MODIFIED BY NYC BC 2014 APPENDIX Q AS PER PLAN, IN CONJUNCTION W/ NYC DOB NOW JOB #: B00710482. ALSO FOR REFERENCE SEE JOB #: B00765857.
B00766276-P2
10/30/2023
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
10/26/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
09/18/2023
Signed off — Alteration
install new construction fence in conjunction with demo application #322099279
B00622615-I1
09/07/2023
Permit issued — Curb Cut
B00765795-I1-CC
08/07/2023
Signed off — Alteration
B00765857-I1
08/01/2023
Signed off — Alteration
Proposed SOE works include Underpinning, Bracing, Lagging, and Angle of repose. filed in conjunction with GC #B00710482
B00765863-I1
07/25/2023
Objection resolved — Addressed
07/21/2023
Objection raised — Admin
07/19/2023
Signed off — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00800122-I1
07/19/2023
Objection resolved — Addressed
07/19/2023
Objection resolved — Addressed
07/19/2023
Objection resolved — Addressed
07/19/2023
Objection resolved — Addressed
07/11/2023
Objection raised — Inspections
07/11/2023
Objection raised — Scope
07/11/2023
Objection raised — Admin
07/11/2023
Objection raised — Inspections
07/06/2023
Filed — Alteration
INSTALLATION OF PIPING AND PLUMBING FIXTURES IN NEW 3-FAMILY RESIDENCE. IN CONJUNCTION WITH NB JOB # B00710482
B00765754-P1
06/16/2023
Permit issued — Mechanical Systems
B00765748-I1-MS
05/17/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
05/17/2023
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
Latest 60 of 126 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offHI-TOWER CONTRACTORS INC09/07/2023
DOB NOWMechanical SystemsSigned-offHI-TOWER CONTRACTORS INC06/16/2023
DOB NOWGeneral ConstructionPermit IssuedHI-TOWER CONTRACTORS INC04/21/2023
DOB NOWConstruction FenceSigned-offHI-TOWER CONTRACTORS INC04/20/2023
DOB NOWPlumbingSigned-offPLBG P & H INC03/03/2023
DOB NOWSprinklersSigned-offBRUCHE MECHANICAL NY LLC03/03/2023
DOB NOWSidewalk ShedSigned-offPOWERS BRIDGING & SCAFFOL12/23/2022
DOB NOWPlumbingSigned-offPLBG P & H INC12/06/2022
DOB NOWConstruction FenceSigned-offHI-TOWER CONTRACTORS INC10/24/2022
DOB NOWGeneral ConstructionPermit IssuedHI-TOWER CONTRACTORS INC09/02/2022
DOB NOWFoundationSigned-offHI-TOWER CONTRACTORS INC09/01/2022
DOB NOWSupport of ExcavationSigned-offHI-TOWER CONTRACTORS INC08/30/2022
DOB NOWConstruction FenceSigned-offBEST DEMO INC11/23/2021
3 projects · most recent 02/07/2024
General Wiring
FiledStatusContractorScope
02/07/2024CompleteSHTRAL ELECT'L CONT'G CORGeneral Wiring
01/13/2023CompleteOPTIMAL ELECTRIC, INC—
01/06/2022CompleteSHTRAL ELECT'L CONT'G COR—
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
11/14/2024Pass-Final CND-Occupancy InspectionPassView ↗
11/27/2023Pass-Final Curb Cut Non-Directive 14PassView ↗
10/30/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
10/26/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
05/17/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
05/17/2023Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
12/12/2022Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
12/12/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 56
DateRequirementInspectorRole
02/07/2024Lighting in dwelling unitsINDARDEO PARBHUNATHenergy_progress
02/07/2024Air barrier - visual inspectionINDARDEO PARBHUNATHenergy_progress
02/07/2024Subgrade InspectionsINDARDEO PARBHUNATHspecial
02/07/2024Exterior lighting powerINDARDEO PARBHUNATHenergy_progress
02/07/2024Permanent certificateINDARDEO PARBHUNATHenergy_progress
02/07/2024Protection of exposed foundation insulationINDARDEO PARBHUNATHenergy_progress
02/07/2024Interior lighting powerINDARDEO PARBHUNATHenergy_progress
02/07/2024Maintenance informationINDARDEO PARBHUNATHenergy_progress
02/07/2024Fenestration and door U-factor and product ratingsINDARDEO PARBHUNATHenergy_progress
02/07/2024MeteringINDARDEO PARBHUNATHenergy_progress
02/07/2024Fenestration areasINDARDEO PARBHUNATHenergy_progress
02/07/2024Fenestration air leakageINDARDEO PARBHUNATHenergy_progress
02/07/2024Insulation placement and R valuesINDARDEO PARBHUNATHenergy_progress
02/07/2024Fire-Resistance Rated ConstructionINDARDEO PARBHUNATHprogress
02/07/2024Energy Code Compliance InspectionsINDARDEO PARBHUNATHprogress
02/07/2024Concrete - Cast-In-PlaceINDARDEO PARBHUNATHspecial
02/07/2024Subsurface Investigations (Borings/Test Pits)INDARDEO PARBHUNATHspecial
02/07/2024Fire-Resistant Penetrations and JointsINDARDEO PARBHUNATHspecial
12/12/2023Insulation placement and R valuesINDARDEO PARBHUNATHenergy_progress
12/12/2023Exterior lighting powerINDARDEO PARBHUNATHenergy_progress
12/12/2023MeteringINDARDEO PARBHUNATHenergy_progress
12/12/2023Interior lighting powerINDARDEO PARBHUNATHenergy_progress
12/12/2023Fenestration and door U-factor and product ratingsINDARDEO PARBHUNATHenergy_progress
12/12/2023Protection of exposed foundation insulationINDARDEO PARBHUNATHenergy_progress
12/12/2023Lighting in dwelling unitsINDARDEO PARBHUNATHenergy_progress
Latest 25 of 56.
▾Documents — 113 on file (BIS + DOB NOW)
▸Plans & Drawings13
▸DOB NOWPlans/Sketch13
08/29/2026B00765857-I1Request digital key ↗
08/28/2026B00766276-P2Request digital key ↗
08/28/2026B00766276-I1Request digital key ↗
Showing 3 of 13 on file for this type
▸Applications & Permits3
▸BISPLAN / WORK APPROVAL APPLICATION3
11/12/2024322119532Open ↗
11/12/2024322119532Open ↗
10/30/2024322119532Open ↗
▸Zoning, Tax Lot & Property Records5
▸DOB NOWZD1: DOB Zoning Diagram2
08/13/2026B00710482-I1Open ↗
08/13/2026B00710482-P1Open ↗
▸DOB NOWZoning Exhibit form (1-5)2
08/13/2026B00710482-P1Open ↗
08/13/2026B00710482-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B00710482-I1Open ↗
▸Seals & Professional Certifications68
▸DOB NOWProgress Inspector Seal & Signature38
09/01/2026B00765754-I1Open ↗
09/01/2026B00765754-I1Open ↗
09/01/2026B00765754-I1Open ↗
Showing 3 of 38 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature17
09/01/2026B00765754-I1Open ↗
09/01/2026B00765754-I1Open ↗
08/30/2026B00765748-P1Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature13
08/29/2026B00765857-I1Open ↗
08/28/2026B00766276-P2Open ↗
08/28/2026B00766276-I1Open ↗
Showing 3 of 13 on file for this type
▸Trade Schedules & Equipment2
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)2
08/13/2026B00710482-I1Open ↗
08/13/2026B00710482-P1Open ↗
▸Safety & Tenant Protection5
▸DOB NOWStreet Tree Checklist2
08/26/2026B00710482-I1Open ↗
08/26/2026B00710482-P1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B00710482-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026B00710482-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026B00710482-I1Open ↗
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis2
08/13/2026B00710482-I1Open ↗
08/13/2026B00765754-I1Open ↗
▸Inspections & Test Reports5
▸DOB NOWSOIL REPORT3
08/13/2026B00765857-I1Open ↗
08/13/2026B00710482-I1Open ↗
08/13/2026B00710482-P1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram2
08/13/2026B00765857-I1Open ↗
08/13/2026B00710482-I1Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
10/30/2024322119532Open ↗
▸Other Documents9
▸DOB NOWSite Survey: Initial2
08/13/2026B00710482-P1Open ↗
08/13/2026B00710482-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026B00710482-P1Open ↗
08/13/2026B00710482-I1Open ↗
▸DOB NOWAdjoining Owners Notification2
08/13/2026B00765857-I1Open ↗
08/13/2026B00765863-I1Open ↗
▸DOB NOWProperty Ownership Certification2
08/26/2026B00710482-I1Open ↗
08/26/2026B00710482-P1Open ↗
▸DOB NOWFinal Survey1
08/13/2026B00710482-I1Open ↗