← Back
BuildNYC
Miscellaneous asylum / home
1455 FULTON AVENUE
BRONX · BIN 2115893
💬 Discuss this project
1995Year Built
4Stories
N9Building Class
R7-1Zoning
—Gross Floor Area
41Units
17 Active Violations 16 unresolved · 1 paperwork only 14 likely answered ▸FDNY Report ↗
Miscellaneous asylum / home · Owner of record: Community Action Forhuman Services · 1.51 FAR built · Flood zone X
Locations of Work
StructuralMechanical
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofFor Human Services, NC1 filing · 5 docs
Floor 4Community Action For Human Services1 filing · 19 docs
Floor 3Community Action For Human Services1 filing · 19 docs
Floor 2Community Action For Human Services1 filing · 19 docs
Floor 1Community Action For Human Services5p · 2 filings · 19 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Cahs810/16/2026
Commercial Action for Human Services403/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Napach Design Group310/15/2026
Conapac Services, Dba103/04/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Framework Consultants203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Aujla ElectricElectrical103/22/2026
ProanglecorpScaffold104/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Napach Architectu2945310/15/2026
Building Lifecycle
All (86)Filed (4)Permit Issued (1)Signed Off (1)Violation (60)Special Inspection (20)
10/15/2026
Filed — Alteration
NTERIOR ALTERATIONS WITH COSMETIC WORK AND EXTERIOR REPAIR/REPLACEMENT OF EXISTING STOREFRONT SYSTEM.NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
X01416415-P1
10/06/2026
Special inspection requirement — Lighting in dwelling units
JOEL NAPACH
10/06/2026
Special inspection requirement — Lighting controls
JOEL NAPACH
10/06/2026
Special inspection requirement — Interior lighting power
JOEL NAPACH
10/06/2026
Special inspection requirement — Fenestration air leakage
JOEL NAPACH
10/06/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOEL NAPACH
10/06/2026
Special inspection requirement — Energy Code Compliance Inspections
JOEL NAPACH
10/06/2026
Special inspection requirement — Final
JOEL NAPACH
10/06/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
JOEL NAPACH
07/10/2026
Filed — Alteration
NTERIOR ALTERATIONS WITH COSMETIC WORK AND EXTERIOR REPAIR/REPLACEMENT OF EXISTING STOREFRONT SYSTEM.NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
X01416415-I1
06/23/2026
Special inspection requirement — Interior lighting power
JOEL NAPACH
06/16/2026
Special inspection requirement — Lighting in dwelling units
JOEL NAPACH
06/16/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOEL NAPACH
06/16/2026
Special inspection requirement — Energy Code Compliance Inspections
JOEL NAPACH
06/16/2026
Special inspection requirement — Fenestration air leakage
JOEL NAPACH
06/16/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
JOEL NAPACH
06/16/2026
Special inspection requirement — Lighting controls
JOEL NAPACH
06/12/2026
Special inspection requirement — Final
JOEL NAPACH
04/30/2026
Violation issued (HPD, closed)
A
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/06/2025
Signed off — Alteration
INSTALLATION OF SIDEWALK SHED AS SHOWN ON DRAWINGS. NO CHANGE IN USE EGRESS OR OCCUPANCY. WE SHALL COMPLY WITH CHAPTER 33 OF 2022B.C
X01182037-I1
06/05/2025
Violation issued (HPD, closed)
A
03/05/2025
Permit issued — Sidewalk Shed
X01182037-I1-SH
03/04/2025
Filed — Alteration
INSTALLATION OF SIDEWALK SHED AS SHOWN ON DRAWINGS. NO CHANGE IN USE EGRESS OR OCCUPANCY. WE SHALL COMPLY WITH CHAPTER 33 OF 2022B.C
X01182037-I1
12/05/2024
Filed — Alteration
X01149689-I1
12/04/2024
Special inspection requirement — Insulation placement and R values
12/04/2024
Special inspection requirement — Energy Code Compliance Inspections
JOEL NAPACH
12/04/2024
Special inspection requirement — Tenant Protection Plan Compliance
JOEL NAPACH
12/04/2024
Special inspection requirement — Final
JOEL NAPACH
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/02/2024
Violation issued (ECB, closed)
Boilers
08/02/2024
Violation issued (ECB, closed)
Boilers
04/18/2024
Violation issued (HPD, open)
A
04/18/2024
Violation issued (HPD, closed)
C
04/18/2024
Violation issued (HPD, open)
B
02/27/2024
Violation issued (FDNY_NOV, closed)
02/27/2024
Violation issued (FDNY_NOV, closed)
02/27/2024
Violation issued (FDNY_NOV, closed)
10/11/2023
Violation issued (HPD, open)
A
10/11/2023
Violation issued (HPD, closed)
B
10/11/2023
Violation issued (HPD, open)
A
10/11/2023
Violation issued (HPD, open)
B
10/11/2023
Violation issued (HPD, open)
A
10/11/2023
Violation issued (HPD, closed)
A
10/11/2023
Violation issued (HPD, open)
B
10/11/2023
Violation issued (HPD, open)
B
07/22/2023
Violation issued (HPD, open)
B
07/22/2023
Violation issued (HPD, open)
B
07/22/2023
Violation issued (HPD, open)
A
07/13/2023
Violation issued (HPD, closed)
B
07/13/2023
Violation issued (HPD, closed)
B
07/13/2023
Violation issued (HPD, closed)
C
07/13/2023
Violation issued (HPD, closed)
B
07/05/2023
Violation issued (HPD, closed)
B
07/05/2023
Violation issued (HPD, open)
A
07/05/2023
Violation issued (HPD, closed)
C
07/05/2023
Violation issued (HPD, closed)
C
07/05/2023
Violation issued (HPD, closed)
A
Latest 60 of 86 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedSigned-offProanglecorp03/05/2025
BISCCISSUEDGalaxy-Volmar06/10/1997
BISBLISSUEDDanica Plumbing & Heating05/28/1997
BISPLISSUEDDanica Plumbing & Heating12/30/1996
BISFPISSUEDFire Command Co08/29/1996
BIS—ISSUEDGalaxy - Volmar03/14/1996
BISEQISSUEDGalaxy - Volmar03/14/1996
BIS—ISSUEDGalaxy - Volmar10/06/1995
BISEQISSUEDGalaxy - Volmar09/27/1995
1 project · most recent 05/05/2025
FiledStatusContractorScope
05/05/2025Permit IssuedAujla Electric—
▾Special Inspection Requirements (DOB NOW) — 20
DateRequirementInspectorRole
10/06/2026Lighting in dwelling unitsJOEL NAPACHenergy_progress
10/06/2026Lighting controlsJOEL NAPACHenergy_progress
10/06/2026Interior lighting powerJOEL NAPACHenergy_progress
10/06/2026Fenestration air leakageJOEL NAPACHenergy_progress
10/06/2026Fire-Resistant Penetrations and JointsJOEL NAPACHspecial
10/06/2026Energy Code Compliance InspectionsJOEL NAPACHprogress
10/06/2026FinalJOEL NAPACHprogress
10/06/2026Fenestration and door U-factor and product ratingsJOEL NAPACHenergy_progress
06/23/2026Interior lighting powerJOEL NAPACHenergy_progress
06/16/2026Lighting in dwelling unitsJOEL NAPACHenergy_progress
06/16/2026Fire-Resistant Penetrations and JointsJOEL NAPACHspecial
06/16/2026Energy Code Compliance InspectionsJOEL NAPACHprogress
06/16/2026Fenestration air leakageJOEL NAPACHenergy_progress
06/16/2026Fenestration and door U-factor and product ratingsJOEL NAPACHenergy_progress
06/16/2026Lighting controlsJOEL NAPACHenergy_progress
06/12/2026FinalJOEL NAPACHprogress
12/04/2024Insulation placement and R values—energy_progress
12/04/2024Energy Code Compliance InspectionsJOEL NAPACHprogress
12/04/2024Tenant Protection Plan ComplianceJOEL NAPACHspecial
12/04/2024FinalJOEL NAPACHprogress
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Community Action For Human ServicesOfficeFloors 1–4
Project X01416415 Alteration · Plan Examiner Review · 07/10/2026
For Human Services, NCCommunity FacilityRoof
Project X01149689 Alteration · Approved · 12/05/2024
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 30 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/20/2026X01149689-I1Request digital key ↗
08/20/2026X01182037-I1Request digital key ↗
08/16/2026X01416415-I1Request digital key ↗
▸Seals & Professional Certifications23
▸DOB NOWProgress Inspector Seal & Signature16
10/17/2026X01416415-P1Open ↗
10/17/2026X01416415-P1Open ↗
10/17/2026X01416415-P1Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
10/17/2026X01416415-P1Open ↗
08/16/2026X01416415-I1Open ↗
08/13/2026X01149689-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
10/17/2026X01416415-P1Open ↗
08/29/2026X01416415-I1Open ↗
08/27/2026X01149689-I1Open ↗
▸Approvals, Objections & Sign-offs4
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter4
10/17/2026X01416415-P1Open ↗
08/16/2026X01416415-I1Open ↗
08/13/2026X01182037-I1Open ↗
Showing 3 of 4 on file for this type