← Back
BROOKLYN
1457 FLATBUSH AVENUE
BROOKLYN · BIN 3427317
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
LL97 Covered0 Open ViolationsFDNY Report ↗
Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingFire Protection
Floor 21p · 1 filing · 20 docs
Floor 19p · 5 filings · 20 docs
Cellar1p · 1 filing · 20 docs
2 jobs · most recent 05/22/2025
General Wiring
FiledStatusContractorScope
05/22/2025CompleteBLZ ELECTRIC INC.General Wiring
02/21/2024CompleteR & T ELECTRICAL CORPGeneral Wiring
Building Lifecycle
All (89)Filed (23)Permit Issued (9)Signed Off (9)Violation (5)Inspection (13)Special Inspection (30)
05/05/2026
Violation issued (HPD, closed)
A
10/22/2025
Violation issued (HPD, closed)
C
10/24/2024
Signed off — Alteration
Modification of existing sprinkler system remove 40 existing heads & install 38 new heads
B01007289-I1
10/24/2024
Signed off — Alteration
B00992061-I1
06/24/2024
Signed off — Alteration
Proposed interior renovation for partial 1st Floor commercial space as per plan. No change in use, egress, or occupancy under this application.
B00945794-I1
06/17/2024
Signed off — Alteration
Proposed interior renovation for partial 1st Floor commercial space as per plan. No change in use, egress, or occupancy under this application.
B00945794-S3
05/24/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
05/21/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
05/21/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
05/13/2024
Signed off — Alteration
Installation of new 1 ton split system unit, installation of ductwork for 3 existing HVAC units, bathroom exhaust fans & ductwork
B01007290-I1
05/06/2024
Signed off — Alteration
Proposed interior renovation for partial 1st Floor commercial space as per plan. No change in use, egress, or occupancy under this application.
B00945794-S2
05/03/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
04/24/2024
Signed off — Alteration
B00992058-I1
04/02/2024
Signed off — Alteration
Proposed interior renovation for partial 1st Floor commercial space as per plan. No change in use, egress, or occupancy under this application.
B00945794-S1
04/02/2024
Permit issued — Mechanical Systems
B01007290-I1-MS
03/15/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Hanli Liu
03/15/2024
Special inspection requirement — Final
Hanli Liu
03/15/2024
Special inspection requirement — Interior lighting power
Hanli Liu
03/15/2024
Special inspection requirement — Energy Code Compliance Inspections
Hanli Liu
03/15/2024
Special inspection requirement — Tenant Protection Plan Compliance
Hanli Liu
03/15/2024
Special inspection requirement — Lighting controls
Hanli Liu
03/13/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
03/13/2024
Inspection — Certified Sprinkler - SP - Roughing
Certified
View inspection ↗
03/07/2024
Permit issued — Sprinklers
B01007289-I1-EW-SP
03/07/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/05/2024
Filed — Alteration
Proposed interior renovation for partial 1st Floor commercial space as per plan. No change in use, egress, or occupancy under this application.
B00945794-P3
03/04/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
03/04/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
03/04/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/02/2024
Special inspection requirement — Lighting controls
Hanli Liu
03/02/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Hanli Liu
03/02/2024
Special inspection requirement — Energy Code Compliance Inspections
Hanli Liu
03/02/2024
Special inspection requirement — Interior lighting power
Hanli Liu
03/02/2024
Special inspection requirement — Final
Hanli Liu
03/02/2024
Special inspection requirement — Tenant Protection Plan Compliance
Hanli Liu
02/26/2024
Filed — Alteration
Modification of existing sprinkler system remove 40 existing heads & install 38 new heads
B01007289-I1
02/26/2024
Filed — Alteration
Installation of new 1 ton split system unit, installation of ductwork for 3 existing HVAC units, bathroom exhaust fans & ductwork
B01007290-I1
02/22/2024
Permit issued — Plumbing
B00992061-I1-PL
02/22/2024
Special inspection requirement — Energy Code Compliance Inspections
Artem Zolotarev
02/22/2024
Special inspection requirement — Maintenance information
Artem Zolotarev
02/22/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Artem Zolotarev
02/22/2024
Special inspection requirement — HVAC-R and service water heating equipment
Artem Zolotarev
02/22/2024
Special inspection requirement — HVAC-R and service water heating system controls
Artem Zolotarev
02/17/2024
Special inspection requirement — Sprinkler Systems
Artem Zolotarev
02/17/2024
Special inspection requirement — Final
Artem Zolotarev
02/17/2024
Special inspection requirement — Mechanical Systems
Artem Zolotarev
02/17/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Rachael Judge
02/17/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Rachael Judge
02/17/2024
Special inspection requirement — Tenant Protection Plan Compliance
Rachael Judge
02/17/2024
Special inspection requirement — Tenant Protection Plan Compliance
Rachael Judge
02/16/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
02/15/2024
Permit issued — General Construction
B00992058-I1-GC
02/09/2024
Filed — Alteration
B00992061-I1
02/09/2024
Filed — Alteration
B00992058-I1
01/29/2024
Special inspection requirement — Interior lighting power
Rachael Judge
01/29/2024
Special inspection requirement — Tenant Protection Plan Compliance
Rachael Judge
01/29/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Rachael Judge
01/29/2024
Special inspection requirement — Energy Code Compliance Inspections
Rachael Judge
01/29/2024
Special inspection requirement — Lighting controls
Rachael Judge
01/17/2024
Special inspection requirement — HVAC-R and service water heating equipment
Liangkai Xia
Latest 60 of 89 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
STREKTE2607/08/2026
FLATBUSH TOWER ONE1003/21/2026
OWNERS REP703/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ADVANCED BUILDERS SERVICES403/21/2026
AE DESIGN SOLUTION1403/21/2026
MODERN BUILDING CONSULTANT703/21/2026
JUDGE ARCHITECTURE PC403/21/2026
RIZZO GROUP203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BUILT NYG INCGeneral Contractor603/21/2026
SIDERIS PLBG & HTG CORPPlumbing403/22/2026
SIGNA DEVELOPMENT CORPGeneral Contractor303/21/2026
R T ELECTRICAL CORP 004190General Contractor203/22/2026
WEN BIN CENElectrical203/21/2026
HNL CONSTRUCTION COMPANYGeneral Contractor107/08/2026
JEM FIRE PREVENTION INCFire Protection107/08/2026
MPS PLUMBING & HEATING INCFire Protection107/08/2026
JEM FIRE PREVENTIONPlumbing103/22/2026
MPS PLUMBING & HEATING INCPlumbing107/08/2026
PIPESTYLISTS, INCPlumbing107/08/2026
FOLXCO LLCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HALO ARCHITECTURE PLLC8021203/05/2024
AZA ENGINEERING LLC7235202/26/2024
JUDGE ARCHITECTURE PC748402/26/2024
ALL CITY ENGINEERING PC7115501/15/2024
REGIONAL TESTING CORP.394410/30/2023
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offHNL CONSTRUCTION COMPANY04/02/2024
DOB NOWSprinklersSigned-offMPS PLUMBING & HEATING INC03/07/2024
DOB NOWPlumbingSigned-offMPS PLUMBING & HEATING IN02/22/2024
DOB NOWGeneral ConstructionSigned-offSIGNA DEVELOPMENT CORP02/15/2024
DOB NOWSprinklersSigned-offJEM FIRE PREVENTION INC11/13/2023
DOB NOWMechanical SystemsSigned-offBUILT NYG INC11/03/2023
DOB NOWPlumbingSigned-offT & T PLUMBING INC11/03/2023
DOB NOWGeneral ConstructionSigned-offBUILT NYG INC11/02/2023
DOB NOWMechanical SystemsSigned-offFOLXCO LLC10/31/2023
BIS—ISSUEDFOLXCO LLC11/29/2022
BIS—ISSUEDFOLXCO LLC09/22/2022
BIS—ISSUEDFOLXCO LLC08/26/2022
BISPLISSUEDBEST MECHANICAL SVCS INC05/24/2022
BIS—ISSUEDFOLXCO LLC05/11/2022
BIS—ISSUEDFOLXCO LLC05/11/2022
▾Field Inspections (DOB CAP) — 13
DateTypeResultReport
05/24/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
05/21/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
05/21/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
05/03/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
03/13/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
03/13/2024Certified Sprinkler - SP - RoughingCertifiedView ↗
03/07/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/04/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
03/04/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
03/04/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/16/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/22/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/22/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 86
DateRequirementInspectorRole
03/15/2024Tenant Protection Plan ComplianceHanli Liuspecial
03/15/2024Interior lighting powerHanli Liuenergy_progress
03/15/2024Lighting controlsHanli Liuenergy_progress
03/15/2024Energy Code Compliance InspectionsHanli Liuprogress
03/15/2024FinalHanli Liuprogress
03/15/2024Fire-Resistant Penetrations and JointsHanli Liuspecial
03/02/2024Lighting controlsHanli Liuenergy_progress
03/02/2024Fire-Resistant Penetrations and JointsHanli Liuspecial
03/02/2024Tenant Protection Plan ComplianceHanli Liuspecial
03/02/2024Energy Code Compliance InspectionsHanli Liuprogress
03/02/2024FinalHanli Liuprogress
03/02/2024Interior lighting powerHanli Liuenergy_progress
02/22/2024HVAC-R and service water heating system controlsArtem Zolotarevenergy_progress
02/22/2024Maintenance informationArtem Zolotarevenergy_progress
02/22/2024HVAC-R and service water heating equipmentArtem Zolotarevenergy_progress
02/22/2024Energy Code Compliance InspectionsArtem Zolotarevprogress
02/22/2024HVAC-R and service water piping design and insulationArtem Zolotarevenergy_progress
02/17/2024Tenant Protection Plan ComplianceRachael Judgespecial
02/17/2024Fire-Resistant Penetrations and JointsRachael Judgespecial
02/17/2024Sprinkler SystemsArtem Zolotarevspecial
02/17/2024FinalArtem Zolotarevprogress
02/17/2024Fire-Resistant Penetrations and JointsRachael Judgespecial
02/17/2024Mechanical SystemsArtem Zolotarevspecial
02/17/2024Tenant Protection Plan ComplianceRachael Judgespecial
01/29/2024Tenant Protection Plan ComplianceRachael Judgespecial
Latest 25 of 86.
▾Documents — 448 on file (BIS + DOB NOW)
▸Plans & Drawings20
▸DOB NOWPlans/Sketch18
09/01/2026B00607358-P1Request digital key ↗
08/30/2026B00712345-I1Request digital key ↗
08/30/2026B00712345-P1Request digital key ↗
Showing 3 of 18 on file for this type
▸DOB NOWPlans/Sketch - Construction Fence2
09/02/2026B00430009-I1Request digital key ↗
08/15/2026B00430009-P1Request digital key ↗
▸Applications & Permits96
▸BISPLAN / WORK APPROVAL APPLICATION86
02/13/2024321827163Open ↗
02/12/2024321827163Open ↗
02/08/2024321827163Open ↗
Showing 3 of 86 on file for this type
▸BISWORK PERMIT APPLICATION10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸Zoning, Tax Lot & Property Records6
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED2
01/18/2024322116811Open ↗
Showing 1 of 2 on file for this type
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT2
01/18/2024322116811Open ↗
Showing 1 of 2 on file for this type
▸BISINITIAL & FINAL TR1 REFLECTING FULL ADDRESS IS TO REFLECT INTO THE VIRTUAL FOLDER PRIOR TO NEXT TCO RENEWAL.1
01/25/2024321827163Open ↗
▸BISZONING EXHIBIT II: CERTIFICATION1
01/18/2024322116811Open ↗
▸Seals & Professional Certifications85
▸DOB NOWSpecial Inspector Seal & Signature35
09/16/2026B00625352-P2Open ↗
09/16/2026B00625352-P2Open ↗
09/16/2026B00625352-P2Open ↗
Showing 3 of 35 on file for this type
▸DOB NOWProgress Inspector Seal & Signature25
09/16/2026B00625352-P2Open ↗
09/16/2026B00625352-P2Open ↗
09/01/2026B00945794-S2Open ↗
Showing 3 of 25 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature22
09/02/2026B00430009-P1Open ↗
09/02/2026B00430009-I1Open ↗
09/01/2026B00607358-P1Open ↗
Showing 3 of 22 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Trade Schedules & Equipment27
▸BISSCHEDULE B - PLUMBING18
05/22/2023321827163Open ↗
03/21/2023321827163Open ↗
03/20/2023321827163Open ↗
Showing 3 of 18 on file for this type
▸BISHVAC & SERVICE WATER HEATING EQUIPMENT2
03/12/2023321827163Open ↗
03/12/2023321827163Open ↗
▸BISHEATING SYSTEMS2
03/12/2023321827163Open ↗
03/12/2023321827163Open ↗
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS2
03/12/2023321827163Open ↗
03/12/2023321827163Open ↗
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
02/09/2023321827163Open ↗
▸BIS* SEWER CONNECTION: DEP SD1 & SD21
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISEQUIPMENT USE PERMITS1
03/13/2023321827163Open ↗
▸Safety & Tenant Protection4
▸BISSTREET TREE CHECKLIST2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISEXCAVATION - SHEETING, SHORING, AND BRACING2
03/12/2023321827163Open ↗
03/12/2023321827163Open ↗
▸Environmental & Asbestos4
▸DOB NOWOER: Notice to Proceed3
08/26/2026B00945794-I1Open ↗
08/13/2026B00945794-P3Open ↗
08/13/2026B00607358-I1Open ↗
▸DOB NOWOER: Notice of Satisfaction1
08/26/2026B00945794-I1Open ↗
▸Energy Compliance27
▸BISINSULATION PLACEMENT & R VALUES2
03/12/2023321827163Open ↗
03/12/2023321827163Open ↗
▸BISAIR SEALING AND INSULATION - VISUAL2
03/12/2023321827163Open ↗
03/12/2023321827163Open ↗
▸BISLIGHTING IN DWELLING UNITS2
03/12/2023321827163Open ↗
03/12/2023321827163Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS2
03/12/2023321827163Open ↗
03/12/2023321827163Open ↗
▸BISINTERIOR LIGHTING POWER2
03/12/2023321827163Open ↗
03/12/2023321827163Open ↗
▸BISELECTRIC MOTORS2
03/12/2023321827163Open ↗
03/12/2023321827163Open ↗
▸BISLIGHTING CONTROLS2
03/12/2023321827163Open ↗
03/12/2023321827163Open ↗
▸BISEXTERIOR LIGHTING POWER2
03/12/2023321827163Open ↗
03/12/2023321827163Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISFENESTRATION U-FACTOR & PRODUCT RATING2
03/12/2023321827163Open ↗
03/12/2023321827163Open ↗
▸BISFENESTRATION AREAS2
03/12/2023321827163Open ↗
03/12/2023321827163Open ↗
▸BISFENESTRATION AIR LEAKAGE2
03/12/2023321827163Open ↗
03/12/2023321827163Open ↗
▸BISELECTRICAL ENERGY CONSUMPTION1
03/13/2023321827163Open ↗
▸BISPRELIMINARY COMMISSIONING REPORT CERTIFICATION1
03/28/2023321827163Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/26/2026B00945794-S2Open ↗
▸Inspections & Test Reports33
▸BISTR3: CONCRETE DESIGN MIX TECHNICAL REPORT7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISCONCRETE - CAST-IN-PLACE2
03/12/2023321827163Open ↗
03/12/2023321827163Open ↗
▸BISWALL PANELS, CURTAIN WALLS, AND VENEERS2
03/12/2023321827163Open ↗
03/12/2023321827163Open ↗
▸BISSUBGRADE INSP / SOILS-SITE PREP2
03/12/2023321827163Open ↗
03/12/2023321827163Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)2
03/12/2023321827163Open ↗
03/12/2023321827163Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION2
03/12/2023321827163Open ↗
03/12/2023321827163Open ↗
▸BISMECHANICAL SYSTEMS2
03/12/2023321827163Open ↗
03/12/2023321827163Open ↗
▸BISFOOTING AND FOUNDATION INSPECTION2
03/12/2023321827163Open ↗
03/12/2023321827163Open ↗
▸BISMASONRY2
03/12/2023321827163Open ↗
03/12/2023321827163Open ↗
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER2
03/20/2023321827163Open ↗
Showing 1 of 2 on file for this type
▸BISTECHNICAL REPORT: SOIL INSPECTION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Approvals, Objections & Sign-offs64
▸BISSCHEDULE A - OCCUPANCY / USE46
02/12/2024321827163Open ↗
01/25/2024321827163Open ↗
12/01/2023321827163Open ↗
Showing 3 of 46 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION14
01/18/2024322116811Open ↗
01/18/2024322116811Open ↗
01/18/2024322116811Open ↗
Showing 3 of 14 on file for this type
▸BISSUPERSEDING LETTER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSUSTAINABLE ROOF ZONE FORM (SIGNOFF)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISHPD: INCLUSIONARY HOUSING LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Filing & Intake Forms32
▸BISADDITIONAL INFORMATION28
02/05/2024321827163Open ↗
02/02/2024321827163Open ↗
01/29/2024321827163Open ↗
Showing 3 of 28 on file for this type
▸BISEFILING COVER SHEET4
01/16/2024322116811Open ↗
Showing 1 of 4 on file for this type
▸Other Documents20
▸BISSHUTOFF DAMPERS2
03/12/2023321827163Open ↗
03/12/2023321827163Open ↗
▸BISPROTECTION OF EXPOSED FOUNDATION INSULATION2
03/12/2023321827163Open ↗
03/12/2023321827163Open ↗
▸BISVENTILATION AND AIR DISTRIBUTION SYSTEM2
03/12/2023321827163Open ↗
03/12/2023321827163Open ↗
▸BISPVT ON-SITE STORM WATER DISPOSAL SYSTEMS & DETENTION FACL., INSTALLATION2
03/12/2023321827163Open ↗
03/12/2023321827163Open ↗
▸BISEXTERIOR INSULATION AND FINISH SYSTEMS (EIFS)2
03/12/2023321827163Open ↗
03/12/2023321827163Open ↗
▸BISALTERNATIVE MATERIALS - OTCR BUILDINGS BULLETIN2
03/13/2023321827163Open ↗
03/12/2023321827163Open ↗
▸BISVESTIBULES2
03/13/2023321827163Open ↗
03/13/2023321827163Open ↗
▸BISMAINTENANCE INFORMATION2
03/12/2023321827163Open ↗
03/12/2023321827163Open ↗
▸BISPLOT DIAGRAM2
01/18/2024322116811Open ↗
Showing 1 of 2 on file for this type
▸BISHVAC & SERVICE WATER PIPING DESIGN AND INSULATION2
03/12/2023321827163Open ↗
03/12/2023321827163Open ↗