← Back
Two family converted from one family
146-01 BOOTH MEMORIAL AVE
QUEENS · Queensboro Hill · BIN 4116763
💬 Discuss this project
1930Year Built
2.5Stories
B3Building Class
R3XZoning
1,511 sfGross Floor Area
2Units
0 Open Violations
Two family converted from one family · 4,600 sf lot · 0.33 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Floor 216p · 2 filings · 20 docs
Floor 116p · 2 filings · 20 docs
Cellar18p · 2 filings · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
01/14/2022$1.4M—Private party → Private party$960/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
AMERILAND BROOK LLC706/08/2023
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SPLEN CONSTRUCTION INCGeneral Contractor603/21/2026
WATSON'S PLBG, HTG, & BDGPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AMERILAND BROOK LLC1506706/08/2023
Building Lifecycle
All (71)Filed (7)Permit Issued (3)Signed Off (3)Violation (2)Inspection (10)Objection (16)Special Inspection (30)
03/05/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
02/20/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
05/10/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/12/2023
Signed off — Alteration CO
CONVERSION FROM ONE TO TWO FAMILY ATACHED RESIDENCE. INTERIOR RENOVATION INVOLVED IN PLUMBING & GENERAL CONSTRUCTION AS PER PLAN FILED HEREWITH. OBTAIN NEW C OF O.
Q00688302-I1
06/12/2023
Special inspection requirement — HVAC-R and service water heating system controls
XIAOHONG ZHAO
06/12/2023
Special inspection requirement — Metering
XIAOHONG ZHAO
06/12/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
XIAOHONG ZHAO
06/12/2023
Special inspection requirement — Interior lighting power
XIAOHONG ZHAO
06/12/2023
Special inspection requirement — Fire-Resistance Rated Construction
XIAOHONG ZHAO
06/12/2023
Special inspection requirement — HVAC-R and service water heating equipment
XIAOHONG ZHAO
06/12/2023
Special inspection requirement — Maintenance information
XIAOHONG ZHAO
06/12/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIAOHONG ZHAO
06/12/2023
Special inspection requirement — Energy Code Compliance Inspections
XIAOHONG ZHAO
06/08/2023
Filed — Alteration CO
CONVERSION FROM ONE TO TWO FAMILY ATACHED RESIDENCE. INTERIOR RENOVATION INVOLVED IN PLUMBING & GENERAL CONSTRUCTION AS PER PLAN FILED HEREWITH. OBTAIN NEW C OF O.
Q00688302-P3
06/08/2023
Special inspection requirement — Maintenance information
XIAOHONG ZHAO
06/08/2023
Special inspection requirement — HVAC-R and service water heating system controls
XIAOHONG ZHAO
06/08/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
XIAOHONG ZHAO
06/08/2023
Special inspection requirement — Metering
XIAOHONG ZHAO
06/08/2023
Special inspection requirement — Interior lighting power
XIAOHONG ZHAO
06/08/2023
Special inspection requirement — Fire-Resistance Rated Construction
XIAOHONG ZHAO
06/08/2023
Special inspection requirement — Energy Code Compliance Inspections
XIAOHONG ZHAO
06/08/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIAOHONG ZHAO
06/08/2023
Special inspection requirement — HVAC-R and service water heating equipment
XIAOHONG ZHAO
06/07/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
05/25/2023
Signed off — Alteration CO
CONVERSION FROM ONE TO TWO FAMILY ATACHED RESIDENCE. INTERIOR RENOVATION INVOLVED IN PLUMBING & GENERAL CONSTRUCTION AS PER PLAN FILED HEREWITH. OBTAIN NEW C OF O.
Q00688302-S1
03/30/2023
Signed off — Alteration
FILE PL WORKTYPE IN CONJUNCTION WITH JOB#Q00688302
Q00711741-I1
02/14/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/10/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/02/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
XIAOHONG ZHAO
02/02/2023
Special inspection requirement — HVAC-R and service water heating equipment
XIAOHONG ZHAO
02/02/2023
Special inspection requirement — HVAC-R and service water heating system controls
XIAOHONG ZHAO
02/02/2023
Special inspection requirement — Energy Code Compliance Inspections
XIAOHONG ZHAO
02/02/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIAOHONG ZHAO
02/02/2023
Special inspection requirement — Maintenance information
XIAOHONG ZHAO
02/01/2023
Filed — Alteration
FILE PL WORKTYPE IN CONJUNCTION WITH JOB#Q00688302
Q00711741-P1
02/01/2023
Special inspection requirement — HVAC-R and service water heating equipment
XIAOHONG ZHAO
02/01/2023
Special inspection requirement — Energy Code Compliance Inspections
XIAOHONG ZHAO
02/01/2023
Special inspection requirement — HVAC-R and service water heating system controls
XIAOHONG ZHAO
02/01/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
XIAOHONG ZHAO
02/01/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIAOHONG ZHAO
02/01/2023
Special inspection requirement — Maintenance information
XIAOHONG ZHAO
10/12/2022
Filed — Alteration CO
CONVERSION FROM ONE TO TWO FAMILY ATACHED RESIDENCE. INTERIOR RENOVATION INVOLVED IN PLUMBING & GENERAL CONSTRUCTION AS PER PLAN FILED HEREWITH. OBTAIN NEW C OF O.
Q00688302-P2
10/12/2022
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
09/29/2022
Objection resolved — Addressed
09/29/2022
Objection resolved — Addressed
09/29/2022
Objection resolved — Addressed
09/29/2022
Objection resolved — Addressed
09/26/2022
Objection raised — Other
09/26/2022
Objection raised — Other
09/26/2022
Objection raised — Other
09/26/2022
Objection raised — Other
09/19/2022
Filed — Alteration CO
CONVERSION FROM ONE TO TWO FAMILY ATACHED RESIDENCE. INTERIOR RENOVATION INVOLVED IN PLUMBING & GENERAL CONSTRUCTION AS PER PLAN FILED HEREWITH. OBTAIN NEW C OF O.
Q00688302-P1
07/28/2022
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
07/28/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/28/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
07/15/2022
Permit issued — General Construction
Q00688302-I1-GC
07/15/2022
Permit issued — Mechanical Systems
Q00688302-S1-MS
07/15/2022
Permit issued — Plumbing
Q00711741-I1-PL
04/04/2022
Filed — Alteration CO
CONVERSION FROM ONE TO TWO FAMILY ATACHED RESIDENCE. INTERIOR RENOVATION INVOLVED IN PLUMBING & GENERAL CONSTRUCTION AS PER PLAN FILED HEREWITH. OBTAIN NEW C OF O.
Q00688302-S1
04/04/2022
Filed — Alteration
FILE PL WORKTYPE IN CONJUNCTION WITH JOB#Q00688302
Q00711741-I1
Latest 60 of 71 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedSPLEN CONSTRUCTION INC07/15/2022
DOB NOWMechanical SystemsSigned-offSPLEN CONSTRUCTION INC07/15/2022
DOB NOWPlumbingSigned-offWATSON'S PLBG, HTG, & BDG07/15/2022
BISPLISSUEDMAINLAND PLG07/27/1998
BIS—ISSUEDWINDSTAR CONSTRUCTION CORP07/10/1998
1 project · most recent 06/08/2023
Associated Ducts and Piping Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
06/08/2023Signed-offSPLEN CONSTRUCTION INCAssociated Ducts and Piping, Heating Systems
Heating
Williamson GWA-105 105,000 BTU · Boiler ×2
Ducts & Piping
Delta Breeze SLIM50 50 CFM · Exhaust Fan ×6
Air King EB30BL 7 CFM · Kitchen Exhaust ×2
1 project · most recent 07/22/2022
General Wiring
FiledStatusContractorScope
07/22/2022CompleteR & T ELECTRICAL CORPGeneral Wiring
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
03/05/2025Pass-Final CND-Occupancy InspectionPassView ↗
02/20/2025Pass-Final CND-Occupancy InspectionPassView ↗
05/10/2024Pass-Final CND-Occupancy InspectionPassView ↗
06/07/2023Pass-Final CND-Occupancy InspectionPassView ↗
02/14/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/10/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/12/2022Pass-Final CND-Occupancy InspectionPassView ↗
07/28/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
07/28/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/28/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 63
DateRequirementInspectorRole
06/12/2023Fire-Resistant Penetrations and JointsXIAOHONG ZHAOspecial
06/12/2023Interior lighting powerXIAOHONG ZHAOenergy_progress
06/12/2023HVAC-R and service water piping design and insulationXIAOHONG ZHAOenergy_progress
06/12/2023HVAC-R and service water heating system controlsXIAOHONG ZHAOenergy_progress
06/12/2023HVAC-R and service water heating equipmentXIAOHONG ZHAOenergy_progress
06/12/2023Maintenance informationXIAOHONG ZHAOenergy_progress
06/12/2023MeteringXIAOHONG ZHAOenergy_progress
06/12/2023Fire-Resistance Rated ConstructionXIAOHONG ZHAOprogress
06/12/2023Energy Code Compliance InspectionsXIAOHONG ZHAOprogress
06/08/2023HVAC-R and service water heating system controlsXIAOHONG ZHAOenergy_progress
06/08/2023Fire-Resistance Rated ConstructionXIAOHONG ZHAOprogress
06/08/2023HVAC-R and service water heating equipmentXIAOHONG ZHAOenergy_progress
06/08/2023Interior lighting powerXIAOHONG ZHAOenergy_progress
06/08/2023MeteringXIAOHONG ZHAOenergy_progress
06/08/2023HVAC-R and service water piping design and insulationXIAOHONG ZHAOenergy_progress
06/08/2023Maintenance informationXIAOHONG ZHAOenergy_progress
06/08/2023Fire-Resistant Penetrations and JointsXIAOHONG ZHAOspecial
06/08/2023Energy Code Compliance InspectionsXIAOHONG ZHAOprogress
02/02/2023Maintenance informationXIAOHONG ZHAOenergy_progress
02/02/2023HVAC-R and service water heating equipmentXIAOHONG ZHAOenergy_progress
02/02/2023HVAC-R and service water piping design and insulationXIAOHONG ZHAOenergy_progress
02/02/2023HVAC-R and service water heating system controlsXIAOHONG ZHAOenergy_progress
02/02/2023Energy Code Compliance InspectionsXIAOHONG ZHAOprogress
02/02/2023Fire-Resistant Penetrations and JointsXIAOHONG ZHAOspecial
02/01/2023Fire-Resistant Penetrations and JointsXIAOHONG ZHAOspecial
Latest 25 of 63.
▾Documents — 47 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/25/2026Q00688302-P2Request digital key ↗
08/25/2026Q00688302-I1Request digital key ↗
08/25/2026Q00688302-S1Request digital key ↗
Showing 3 of 7 on file for this type
▸Zoning, Tax Lot & Property Records1
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q00688302-I1Open ↗
▸Seals & Professional Certifications28
▸DOB NOWProgress Inspector Seal & Signature14
09/02/2026Q00688302-P3Open ↗
09/02/2026Q00688302-P3Open ↗
09/01/2026Q00711741-P1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/25/2026Q00711741-I1Open ↗
08/25/2026Q00711741-P1Open ↗
08/13/2026Q00688302-S1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/02/2026Q00688302-P3Open ↗
09/01/2026Q00711741-P1Open ↗
08/29/2026Q00688302-P1Open ↗
Showing 3 of 7 on file for this type
▸Safety & Tenant Protection4
▸DOB NOWStreet Tree Checklist4
08/13/2026Q00688302-P3Open ↗
08/13/2026Q00688302-P2Open ↗
08/13/2026Q00688302-P1Open ↗
Showing 3 of 4 on file for this type
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis2
08/13/2026Q00711741-I1Open ↗
08/13/2026Q00688302-I1Open ↗
▸Other Documents5
▸DOB NOWProperty Ownership Certification4
08/13/2026Q00688302-P2Open ↗
08/13/2026Q00688302-P3Open ↗
08/13/2026Q00688302-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWFinal Survey1
08/13/2026Q00688302-I1Open ↗