ECB01/25/2021I OBSERVED IN THE BUILDING NEWLY-INSTALLED TANKLESS HOT WATER BOILER, AND NEW GAS VALVE FOR COOKTOP WITH NEW FLEXIBLE CONNECTOR. ALL THE GAS WORK AND INSTALLATION WAS 100% COMPLETED AND DONE WITHOUT A PERMIT.,Nothing owed — awaiting certificate of correction
ECB01/25/2021I OBSERVED IN THE BUILDING GAS METER LOCATED IN THE LIVING ROOM WHICH IS PROHIBITED AREA. AND ALSO SEVERAL FUTURE CONNECTIONS ON THE HOUSE PIPE. ONE LOCATED AT THE GAS METER AND ONE ON THE GAS PIPING FOR TANKLENothing owed — awaiting certificate of correction