← Back
Two stories - detached, small or mid-size
146-04 FOCH BOULEVARD
QUEENS · Baisley Park · BIN 4260865
💬 Discuss this project
1930Year Built
2.5Stories
A1Building Class
R3AZoning
1,711 sfGross Floor Area
1Units
Rent Stabilized0 Open ViolationsFDNY Report ↗
Two stories - detached, small or mid-size · Owner of record: EDEN GROUP NY, LLC · 4,168 sf lot · 0.41 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingGeneral
Floor 233p · 1 filing · 20 docs
Floor 135p · 1 filing · 20 docs
Cellar35p · 1 filing · 20 docs
Site & exterior12p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
MYRTLE DEVELOPMENT1707/08/2026
EDEN GROUP NY LLC103/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
10/24/2025$1.4M—EDEN GROUP NY, LLC → Private party$789/sf building
12/12/2024$635K—Private party → EDEN GROUP NY, LLC$371/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PIROOZ ENGINEERING, P.C.509/02/2025
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NCR CONSTRUCTION INCGeneral Contractor507/08/2026
INFINITI ESC PLUMBING CORPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PIROOZ ENGINEERING P.C7177409/02/2025
TRIANGLE INSPECTION & TES7495208/29/2025
Building Lifecycle
All (52)Filed (5)Permit Issued (4)Signed Off (2)Violation (2)Inspection (9)Special Inspection (30)
11/25/2025
Violation issued (HPD, closed)
I
11/17/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/24/2025
Signed off — Alteration CO
Proposed Plumbing work in conjunction with ALTERATION CO application # Q01013763
Q01159226-S2
10/03/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
09/25/2025
Special inspection requirement — Air barrier - visual inspection
PIROOZ SOLTANIZADEH
09/25/2025
Special inspection requirement — Fenestration areas
PIROOZ SOLTANIZADEH
09/25/2025
Special inspection requirement — Permanent certificate
PIROOZ SOLTANIZADEH
09/25/2025
Special inspection requirement — HVAC-R and service water heating equipment
PIROOZ SOLTANIZADEH
09/25/2025
Special inspection requirement — Interior lighting power
PIROOZ SOLTANIZADEH
09/25/2025
Special inspection requirement — Ventilation and air distribution system
PIROOZ SOLTANIZADEH
09/25/2025
Special inspection requirement — Fenestration air leakage
PIROOZ SOLTANIZADEH
09/25/2025
Special inspection requirement — Metering
PIROOZ SOLTANIZADEH
09/25/2025
Special inspection requirement — HVAC-R and service water heating system controls
PIROOZ SOLTANIZADEH
09/25/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
PIROOZ SOLTANIZADEH
09/25/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
PIROOZ SOLTANIZADEH
09/25/2025
Special inspection requirement — Mechanical Systems
PIROOZ SOLTANIZADEH
09/25/2025
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Rajasekhar Sakhamuri
09/25/2025
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
PIROOZ SOLTANIZADEH
09/25/2025
Special inspection requirement — Concrete - Cast-In-Place
PIROOZ SOLTANIZADEH
09/25/2025
Special inspection requirement — Heating Systems
PIROOZ SOLTANIZADEH
09/25/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
PIROOZ SOLTANIZADEH
09/25/2025
Special inspection requirement — Final
NAVEEN KUMAR
09/25/2025
Special inspection requirement — Footing and Foundation
PIROOZ SOLTANIZADEH
09/25/2025
Special inspection requirement — Energy Code Compliance Inspections
PIROOZ SOLTANIZADEH
09/25/2025
Special inspection requirement — Preliminary
PIROOZ SOLTANIZADEH
09/25/2025
Special inspection requirement — Structural Wood Frame
PIROOZ SOLTANIZADEH
09/25/2025
Special inspection requirement — Fire-Resistance Rated Construction
PIROOZ SOLTANIZADEH
09/25/2025
Special inspection requirement — Electric vehicle service equipment requirements
PIROOZ SOLTANIZADEH
09/25/2025
Special inspection requirement — Maintenance information
PIROOZ SOLTANIZADEH
09/25/2025
Special inspection requirement — Duct leakage testing, insulation and design
PIROOZ SOLTANIZADEH
09/25/2025
Special inspection requirement — Insulation placement and R values
PIROOZ SOLTANIZADEH
09/25/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
PIROOZ SOLTANIZADEH
09/02/2025
Filed — Alteration CO
Proposed Plumbing work in conjunction with ALTERATION CO application # Q01013763
Q01159226-P1
08/29/2025
Filed — Alteration CO
Proposed Plumbing work in conjunction with ALTERATION CO application # Q01013763
Q01159226-P2
08/26/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
PIROOZ SOLTANIZADEH
08/26/2025
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
Rajasekhar Sakhamuri
06/25/2025
Signed off — Alteration
Installation of temporary construction fence
Q01157289-I1
05/02/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
05/02/2025
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
05/02/2025
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
05/02/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/02/2025
Permit issued — Construction Fence
Q01157289-I1-FN
03/27/2025
Permit issued — Plumbing
Q01159226-S2-PL
03/06/2025
Permit issued — General Construction
Q01159226-I1-GC-CX
03/03/2025
Permit issued — Construction Fence
Q01157289-I1-FN
12/29/2024
Filed — Alteration CO
Proposed Plumbing work in conjunction with ALTERATION CO application # Q01013763
Q01159226-S2
12/29/2024
Filed — Alteration CO
Proposed Plumbing work in conjunction with ALTERATION CO application # Q01013763
Q01159226-I1
12/19/2024
Filed — Alteration
Installation of temporary construction fence
Q01157289-I1
11/01/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/25/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/25/2023
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
07/12/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FenceSigned-offNCR CONSTRUCTION INC04/02/2025
DOB NOWPlumbingSigned-offINFINITI ESC PLUMBING COR03/27/2025
DOB NOWGeneral ConstructionPermit IssuedNCR CONSTRUCTION INC03/06/2025
DOB NOWConstruction FenceSigned-offNCR CONSTRUCTION INC03/03/2025
1 project · most recent 09/02/2025
Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
09/02/2025Permit IssuedNCR CONSTRUCTION INCAir Conditioning Systems, Heating Systems, Ventilation Systems
Cooling
Tuttokool AAC5048E1000A 48 BTU · Condensing Unit ×4
Heating
Tuttokool AGF96M120D5B 120,000 BTU · Furnace ×4
Ventilation
Panasonic FV-05VQ5 50 CFM · Exhaust Fan ×10
FV-15VQ5 150 CFM · Exhaust Fan ×4
1 project · most recent 09/02/2025
Gas Storm Water/Sanitary
FiledStatusContractorScope
09/02/2025Signed-offINFINITI ESC PLUMBING CORGas, Storm, Water/Sanitary
2 projects · most recent 07/24/2025
General Wiring
FiledStatusContractorScope
07/24/2025CompleteMETROPOLITAN ELEC OF NY IGeneral Wiring
02/04/2021CompleteH & A ELEC'L SERVICES INC1 meters
1 project · most recent 09/02/2025
Concrete Wood
FiledStatusContractorScope
09/02/2025Signed-offINFINITI ESC PLUMBING CORConcrete, Wood
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
10/03/2025Pass-Final CND-Occupancy InspectionPassView ↗
05/02/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
05/02/2025Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
05/02/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
05/02/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/01/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/25/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/25/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
07/12/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 37
DateRequirementInspectorRole
09/25/2025Air barrier - visual inspectionPIROOZ SOLTANIZADEHenergy_progress
09/25/2025Fenestration areasPIROOZ SOLTANIZADEHenergy_progress
09/25/2025Permanent certificatePIROOZ SOLTANIZADEHenergy_progress
09/25/2025HVAC-R and service water heating equipmentPIROOZ SOLTANIZADEHenergy_progress
09/25/2025Interior lighting powerPIROOZ SOLTANIZADEHenergy_progress
09/25/2025Ventilation and air distribution systemPIROOZ SOLTANIZADEHenergy_progress
09/25/2025Fenestration air leakagePIROOZ SOLTANIZADEHenergy_progress
09/25/2025MeteringPIROOZ SOLTANIZADEHenergy_progress
09/25/2025HVAC-R and service water heating system controlsPIROOZ SOLTANIZADEHenergy_progress
09/25/2025HVAC-R and service water piping design and insulationPIROOZ SOLTANIZADEHenergy_progress
09/25/2025Fire-Resistant Penetrations and JointsPIROOZ SOLTANIZADEHspecial
09/25/2025Mechanical SystemsPIROOZ SOLTANIZADEHspecial
09/25/2025Subsurface Investigations (Borings/Test Pits)Rajasekhar Sakhamurispecial
09/25/2025Excavations - Sheeting, Shoring, and BracingPIROOZ SOLTANIZADEHspecial
09/25/2025Concrete - Cast-In-PlacePIROOZ SOLTANIZADEHspecial
09/25/2025Heating SystemsPIROOZ SOLTANIZADEHspecial
09/25/2025Structural Stability – Alterations of existing buildingsPIROOZ SOLTANIZADEHspecial
09/25/2025FinalNAVEEN KUMARprogress
09/25/2025Footing and FoundationPIROOZ SOLTANIZADEHprogress
09/25/2025Energy Code Compliance InspectionsPIROOZ SOLTANIZADEHprogress
09/25/2025PreliminaryPIROOZ SOLTANIZADEHprogress
09/25/2025Structural Wood FramePIROOZ SOLTANIZADEHprogress
09/25/2025Fire-Resistance Rated ConstructionPIROOZ SOLTANIZADEHprogress
09/25/2025Electric vehicle service equipment requirementsPIROOZ SOLTANIZADEHenergy_progress
09/25/2025Maintenance informationPIROOZ SOLTANIZADEHenergy_progress
Latest 25 of 37.
▾Documents — 26 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/21/2026Q01157289-I1Request digital key ↗
▸Zoning, Tax Lot & Property Records2
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026Q01159226-P1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q01159226-P1Open ↗
▸Seals & Professional Certifications12
▸DOB NOWProgress Inspector Seal & Signature5
09/01/2026Q01159226-I1Open ↗
09/01/2026Q01159226-I1Open ↗
09/01/2026Q01159226-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/01/2026Q01159226-I1Open ↗
09/01/2026Q01159226-I1Open ↗
08/25/2026Q01159226-P2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/21/2026Q01157289-I1Open ↗
08/13/2026Q01159226-P1Open ↗
08/13/2026Q01159226-P2Open ↗
▸Safety & Tenant Protection1
▸DOB NOWStreet Tree Checklist1
08/13/2026Q01159226-P1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/13/2026Q01159226-P2Open ↗
08/13/2026Q01159226-P1Open ↗
▸Inspections & Test Reports2
▸DOB NOWTR4: Test Report and Plot Diagram1
08/13/2026Q01159226-I1Open ↗
▸DOB NOWSoil Report1
08/13/2026Q01159226-P1Open ↗
▸Other Documents6
▸DOB NOWPlot Diagram1
08/13/2026Q01159226-P1Open ↗
▸DOB NOWProperty Ownership Certification1
08/13/2026Q01159226-P1Open ↗
▸DOB NOWSite Survey: Initial1
08/13/2026Q01159226-P1Open ↗
▸DOB NOWFinal Survey1
08/13/2026Q01159226-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026Q01159226-P1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q01159226-I1Open ↗