← Back
BuildNYC
Two stories - detached, small or mid-size
146-04 FOCH BOULEVARD
QUEENS · BIN 4260865
💬 Discuss this project
1930Year Built
2.5Stories
A1Building Class
R3AZoning
1,711 sfGross Floor Area
1Units
Rent Stabilized0 Active ViolationsFDNY Report ↗
Two stories - detached, small or mid-size · Owner of record: Eden Group NY · 4,168 sf lot · 0.41 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof3p · 1 filing · 20 docs
Floor 223p · 1 filing · 20 docs
Floor 125p · 1 filing · 20 docs
Cellar25p · 1 filing · 20 docs
Site & exteriorInstallation of temporary construction fence12p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Myrtle Development1707/08/2026
Eden Group NY103/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
10/24/2025$1.4M—EDEN GROUP NY, LLC → Private party$789/sf building
12/12/2024$635K—Private party → EDEN GROUP NY, LLC$371/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Pirooz Engineering509/02/2025
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NCR ConstructionScaffold407/08/2026
NCR ConstructionGeneral Contractor210/04/2026
Infiniti Esc PlumbingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Pirooz Engineering7177409/02/2025
Triangle Inspection & Tes7495208/29/2025
Building Lifecycle
03/28/2026
Permit expired, never signed off — Mechanical Systems
The city's record still shows this permit as issued, with no sign-off on its filing
Q01159226-I1-GC-CX
12/03/2025
Closed: Boro commissioner notice of order to stop work immediately due to special progress agency withdrawal of application # Q01159226-I1
DOB violation · closed on the city's record
11/25/2025
§27-2107 ADM code owner failed to file a valid registration statement with the department as required by ADM code §27-2097 and is therefore subject…
HPD violation · closed
11/17/2025
Boro commissioner notice of order to stop work immediately due to special progress agency withdrawal of application # Q01159226-I1
DOB violation · closed
10/24/2025
Signed off — Alteration CO
Proposed Plumbing work in conjunction with ALTERATION CO application # Q01013763
Q01159226-S2
51 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedNCR Construction04/02/2025
DOB NOWConstruction FenceSigned-offNCR Construction04/02/2025
DOB NOWPlumbingSigned-offInfiniti Esc Plumbing03/27/2025
DOB NOWFoundationPermit IssuedNCR Construction03/06/2025
DOB NOWConstruction FenceSigned-offNCR Construction03/03/2025
1 project · most recent 09/02/2025
Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScope
09/02/2025Permit IssuedNCR ConstructionAir Conditioning Systems, Heating Systems, Ventilation Systems
1 project · most recent 09/02/2025
Gas Storm Water/Sanitary
FiledStatusContractorScope
09/02/2025Signed-offInfiniti Esc PlumbingGas, Storm, Water/Sanitary
2 projects · most recent 07/24/2025
General Wiring
FiledStatusContractorScope
07/24/2025CompleteMetropolitan Electric of NY IGeneral Wiring
02/04/2021CompleteH & A Electrical Services—
1 project · most recent 09/02/2025
Concrete Wood
FiledStatusContractorScope
09/02/2025Permit IssuedNCR ConstructionConcrete, Wood
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
10/03/2025Pass-Final CND-Occupancy InspectionPassView ↗
05/02/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
05/02/2025Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
05/02/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
05/02/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 46
DateRequirementInspectorRole
09/25/2025PreliminaryPIROOZ SOLTANIZADEHprogress
09/25/2025Mechanical SystemsPIROOZ SOLTANIZADEHspecial
09/25/2025Subsurface Investigations (Borings/Test Pits)Rajasekhar Sakhamurispecial
09/25/2025Excavations - Sheeting, Shoring, and BracingPIROOZ SOLTANIZADEHspecial
09/25/2025Concrete - Cast-In-PlacePIROOZ SOLTANIZADEHspecial
09/25/2025Heating SystemsPIROOZ SOLTANIZADEHspecial
09/25/2025Structural Stability – Alterations of existing buildingsPIROOZ SOLTANIZADEHspecial
09/25/2025FinalNAVEEN KUMARprogress
09/25/2025Footing and FoundationPIROOZ SOLTANIZADEHprogress
09/25/2025Energy Code Compliance InspectionsPIROOZ SOLTANIZADEHprogress
09/25/2025Fire-Resistant Penetrations and JointsPIROOZ SOLTANIZADEHspecial
09/25/2025Structural Wood FramePIROOZ SOLTANIZADEHprogress
09/25/2025Fire-Resistance Rated ConstructionPIROOZ SOLTANIZADEHprogress
09/25/2025Electric vehicle service equipment requirementsPIROOZ SOLTANIZADEHenergy_progress
09/25/2025Maintenance informationPIROOZ SOLTANIZADEHenergy_progress
09/25/2025Duct leakage testing, insulation and designPIROOZ SOLTANIZADEHenergy_progress
09/25/2025Insulation placement and R valuesPIROOZ SOLTANIZADEHenergy_progress
09/25/2025Fenestration and door U-factor and product ratingsPIROOZ SOLTANIZADEHenergy_progress
09/25/2025Fenestration areasPIROOZ SOLTANIZADEHenergy_progress
09/25/2025Permanent certificatePIROOZ SOLTANIZADEHenergy_progress
09/25/2025HVAC-R and service water heating equipmentPIROOZ SOLTANIZADEHenergy_progress
09/25/2025Interior lighting powerPIROOZ SOLTANIZADEHenergy_progress
09/25/2025Ventilation and air distribution systemPIROOZ SOLTANIZADEHenergy_progress
09/25/2025Fenestration air leakagePIROOZ SOLTANIZADEHenergy_progress
09/25/2025MeteringPIROOZ SOLTANIZADEHenergy_progress
Latest 25 of 46.
30 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account