← Back
Two stories - detached, small or mid-size
146-05 33 AVENUE
QUEENS · Murray Hill-Broadway Flushing · BIN 4108568
💬 Discuss this project
1910Year Built
2.5Stories
A1Building Class
R2AZoning
2,079 sfGross Floor Area
1Units
0 Open Violations
Two stories - detached, small or mid-size · 4,500 sf lot · 0.46 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingCivilGeneral
Floor 220p · 3 filings · 20 docs
Floor 135p · 2 filings · 20 docs
Cellar21p · 2 filings · 20 docs
Site & exterior33p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
THC CONSTRUCTION403/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
01/31/2017$645K—— → —$310/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BRIAN ILL DEVELOPMENT LLC211/22/2025
AMERILAND BROOK LLC609/22/2025
WKS INC.110/15/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AMERILAND BROOK LLC403/21/2026
JM CONSULTANT STUDIO203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
THC CONSTRUCTION INCGeneral Contractor1407/08/2026
WATSON'S PLBG, HTG, & BDGPlumbing207/08/2026
CONTROL PLBG & HTG INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AMERILAND BROOK LLC1506509/22/2025
WKS INC.4521110/15/2019
Building Lifecycle
All (72)Filed (8)Permit Issued (11)Signed Off (4)Violation (7)Inspection (10)Objection (2)Special Inspection (30)
03/05/2026
Signed off — ALT-CO - New Building with Existing Elements to Remain
INSTALL 12' DROP CURB WITH 1'-6" SPLAYS ON BOTH SIDE.
Q00810813-S4
01/02/2026
Permit issued — Earth Work
Q00810813-I1-MS
12/22/2025
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
11/22/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
INSTALL 12' DROP CURB WITH 1'-6" SPLAYS ON BOTH SIDE.
Q00810813-P4
11/10/2025
Signed off — Alteration
FILE PL WORKTYPE IN CONJUNCTION WITH JOB#Q00810813
Q00850037-I1
10/31/2025
Inspection — Fail-Final Curb Cut Non-Directive 14
Fail
View inspection ↗
10/30/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
09/23/2025
Special inspection requirement — Structural Steel - Welding
XIAOHONG ZHAO
09/23/2025
Special inspection requirement — Mechanical Systems
XIAOHONG ZHAO
09/23/2025
Special inspection requirement — Heating Systems
XIAOHONG ZHAO
09/23/2025
Special inspection requirement — Chimneys and vents
XIAOHONG ZHAO
09/23/2025
Special inspection requirement — Masonry
XIAOHONG ZHAO
09/23/2025
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
TONY ONYEAGORO
09/23/2025
Special inspection requirement — Structural Steel - Details
XIAOHONG ZHAO
09/23/2025
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
XIAOHONG ZHAO
09/23/2025
Special inspection requirement — Subgrade Inspections
XIAOHONG ZHAO
09/23/2025
Special inspection requirement — Construction Operations Influencing Adjacent Structures
XIAOHONG ZHAO
09/23/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIAOHONG ZHAO
09/23/2025
Special inspection requirement — Concrete - Cast-In-Place
XIAOHONG ZHAO
09/23/2025
Special inspection requirement — Structural Steel - High Strength Bolting
XIAOHONG ZHAO
09/23/2025
Special inspection requirement — Final
XIAOHONG ZHAO
09/23/2025
Special inspection requirement — Energy Code Compliance Inspections
XIAOHONG ZHAO
09/23/2025
Special inspection requirement — Footing and Foundation
XIAOHONG ZHAO
09/23/2025
Special inspection requirement — Fire-Resistance Rated Construction
XIAOHONG ZHAO
09/23/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
XIAOHONG ZHAO
09/23/2025
Special inspection requirement — Insulation placement and R values
XIAOHONG ZHAO
09/23/2025
Special inspection requirement — Air barrier - visual inspection
XIAOHONG ZHAO
09/23/2025
Special inspection requirement — Air barrier — testing
XIAOHONG ZHAO
09/23/2025
Special inspection requirement — Maintenance information
XIAOHONG ZHAO
09/23/2025
Special inspection requirement — Permanent certificate
XIAOHONG ZHAO
09/23/2025
Special inspection requirement — Ventilation and air distribution system
XIAOHONG ZHAO
09/23/2025
Special inspection requirement — HVAC-R and service water heating system controls
XIAOHONG ZHAO
09/23/2025
Special inspection requirement — HVAC-R and service water heating equipment
XIAOHONG ZHAO
09/23/2025
Special inspection requirement — Electric vehicle service equipment requirements
XIAOHONG ZHAO
09/23/2025
Special inspection requirement — Interior lighting power
XIAOHONG ZHAO
09/23/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
XIAOHONG ZHAO
09/23/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
XIAOHONG ZHAO
09/22/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
INSTALL 12' DROP CURB WITH 1'-6" SPLAYS ON BOTH SIDE.
Q00810813-P3
09/17/2025
Permit issued — Curb Cut
Q00810813-S4-CC
09/16/2025
Objection resolved — Addressed
09/02/2025
Objection raised — Energy
07/23/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
INSTALL 12' DROP CURB WITH 1'-6" SPLAYS ON BOTH SIDE.
Q00810813-P2
04/17/2025
Violation issued (ECB, closed)
Construction
02/17/2025
Signed off — ALT-CO - New Building with Existing Elements to Remain
INSTALL 12' DROP CURB WITH 1'-6" SPLAYS ON BOTH SIDE.
Q00810813-S3
08/02/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
05/30/2024
Permit issued — Earth Work
Q00810813-I1-GC
05/24/2024
Permit issued — Construction Fence
Q00810813-S3-FN
04/08/2024
Permit issued — Plumbing
Q00850037-I1-PL
01/12/2024
Violation issued (ECB, closed)
Unknown
01/12/2024
Violation issued (ECB, closed)
Construction
01/12/2024
Violation issued (ECB, closed)
Construction
11/27/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
11/27/2023
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
11/27/2023
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
11/27/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/27/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
04/24/2023
Permit issued — Structural
Q00810813-I1-FO-EA
04/24/2023
Permit issued — Structural
Q00810813-I1-GC
04/24/2023
Permit issued — General Construction
Q00810813-I1-ST
04/17/2023
Permit issued — Plumbing
Q00850037-I1-PL
Latest 60 of 72 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWEarth WorkPermit IssuedTHC CONSTRUCTION INC01/02/2026
DOB NOWCurb CutSigned-offTHC CONSTRUCTION INC09/17/2025
DOB NOWEarth WorkPermit IssuedTHC CONSTRUCTION INC05/30/2024
DOB NOWConstruction FenceSigned-offTHC CONSTRUCTION INC05/24/2024
DOB NOWPlumbingSigned-offWATSON'S PLBG, HTG, & BDG04/08/2024
DOB NOWStructuralPermit IssuedTHC CONSTRUCTION INC04/24/2023
DOB NOWStructuralPermit IssuedTHC CONSTRUCTION INC04/24/2023
DOB NOWGeneral ConstructionPermit IssuedTHC CONSTRUCTION INC04/24/2023
DOB NOWPlumbingSigned-offWATSON'S PLBG, HTG, & BDG04/17/2023
DOB NOWConstruction FenceSigned-offTHC CONSTRUCTION INC04/17/2023
DOB NOWPlumbingSigned-offCONTROL PLBG & HTG INC05/20/2021
1 project · most recent 11/22/2025
Associated Ducts and Piping Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
11/22/2025Permit IssuedTHC CONSTRUCTION INCAssociated Ducts and Piping, Heating Systems
Heating
Williamson GWA-100-N-T 100,000 BTU · Boiler ×4
Ducts & Piping
Delta Breeze SLIM50 50 CFM · Exhaust Fan ×20
Air King EB30BL 130 CFM · Kitchen Exhaust ×4
1 project · most recent 05/25/2023
General Wiring
FiledStatusContractorScope
05/25/2023CompleteAL-LECTRIC ELECT'L CONTRGGeneral Wiring
1 project · most recent 11/22/2025
Concrete Masonry Wood
FiledStatusContractorScope
11/22/2025Permit IssuedTHC CONSTRUCTION INCConcrete, Masonry, Wood
1 project · most recent 11/22/2025
Fence
FiledStatusContractorScope
11/22/2025Permit IssuedTHC CONSTRUCTION INCFence
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
12/22/2025Pass-Final Curb Cut Non-Directive 14PassView ↗
10/31/2025Fail-Final Curb Cut Non-Directive 14FailView ↗
10/30/2025Pass-Final CND-Occupancy InspectionPassView ↗
08/02/2024Pass-Final CND-Occupancy InspectionPassView ↗
11/27/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
11/27/2023Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
11/27/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
11/27/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/27/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
05/23/2021Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 110
DateRequirementInspectorRole
09/23/2025HVAC-R and service water heating equipmentXIAOHONG ZHAOenergy_progress
09/23/2025Structural Steel - WeldingXIAOHONG ZHAOspecial
09/23/2025Mechanical SystemsXIAOHONG ZHAOspecial
09/23/2025Heating SystemsXIAOHONG ZHAOspecial
09/23/2025Chimneys and ventsXIAOHONG ZHAOspecial
09/23/2025MasonryXIAOHONG ZHAOspecial
09/23/2025Subsurface Investigations (Borings/Test Pits)TONY ONYEAGOROspecial
09/23/2025Structural Steel - DetailsXIAOHONG ZHAOspecial
09/23/2025Excavations - Sheeting, Shoring, and BracingXIAOHONG ZHAOspecial
09/23/2025Subgrade InspectionsXIAOHONG ZHAOspecial
09/23/2025Construction Operations Influencing Adjacent StructuresXIAOHONG ZHAOspecial
09/23/2025Fire-Resistant Penetrations and JointsXIAOHONG ZHAOspecial
09/23/2025Concrete - Cast-In-PlaceXIAOHONG ZHAOspecial
09/23/2025Structural Steel - High Strength BoltingXIAOHONG ZHAOspecial
09/23/2025FinalXIAOHONG ZHAOprogress
09/23/2025Energy Code Compliance InspectionsXIAOHONG ZHAOprogress
09/23/2025Footing and FoundationXIAOHONG ZHAOprogress
09/23/2025Fire-Resistance Rated ConstructionXIAOHONG ZHAOprogress
09/23/2025HVAC-R and service water piping design and insulationXIAOHONG ZHAOenergy_progress
09/23/2025Insulation placement and R valuesXIAOHONG ZHAOenergy_progress
09/23/2025Air barrier - visual inspectionXIAOHONG ZHAOenergy_progress
09/23/2025Air barrier — testing XIAOHONG ZHAOenergy_progress
09/23/2025Maintenance informationXIAOHONG ZHAOenergy_progress
09/23/2025Permanent certificateXIAOHONG ZHAOenergy_progress
09/23/2025Ventilation and air distribution systemXIAOHONG ZHAOenergy_progress
Latest 25 of 110.
▾Documents — 107 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch8
08/25/2026Q00850037-I1Request digital key ↗
08/18/2026Q00810813-P3Request digital key ↗
08/18/2026Q00810813-P2Request digital key ↗
Showing 3 of 8 on file for this type
▸DOB NOWPlans/Sketch - Plumbing1
08/28/2026Q00232633-I1Request digital key ↗
▸Applications & Permits6
▸BISPLAN / WORK APPROVAL APPLICATION3
11/03/2025440774137Open ↗
03/27/2023440774137Open ↗
09/20/2019421686394Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation2
09/18/2025440774137Open ↗
03/27/2023440774137Open ↗
▸BISWORK PERMIT APPLICATION1
10/23/2019421686394Open ↗
▸Zoning, Tax Lot & Property Records8
▸DOB NOWZD1: DOB Zoning Diagram4
08/13/2026Q00810813-P3Open ↗
08/13/2026Q00810813-I1Open ↗
08/13/2026Q00810813-P2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWZoning Exhibit form (1-5)3
08/13/2026Q00810813-I1Open ↗
08/13/2026Q00810813-P1Open ↗
08/13/2026Q00810813-P3Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q00810813-I1Open ↗
▸Seals & Professional Certifications36
▸DOB NOWProgress Inspector Seal & Signature13
09/27/2026Q00232633-I1Open ↗
09/27/2026Q00232633-I1Open ↗
08/29/2026Q00810813-P2Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature11
09/27/2026Q00232633-I1Open ↗
08/29/2026Q00810813-P2Open ↗
08/29/2026Q00810813-P2Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/28/2026Q00232633-I1Open ↗
08/18/2026Q00810813-P3Open ↗
08/18/2026Q00810813-P4Open ↗
Showing 3 of 9 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
03/27/2023440774137Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
03/27/2023440774137Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
09/20/2019421686394Open ↗
▸Trade Schedules & Equipment4
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)4
08/13/2026Q00810813-P3Open ↗
08/13/2026Q00810813-P2Open ↗
08/13/2026Q00810813-I1Open ↗
Showing 3 of 4 on file for this type
▸Safety & Tenant Protection4
▸BISSTREET TREE CHECKLIST1
03/27/2023440774137Open ↗
▸BISTenant Protection Plan and Notes1
09/20/2019421686394Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026Q00810813-I1Open ↗
▸DOB NOWTenant Protection Plan1
08/28/2026Q00232633-I1Open ↗
▸Environmental & Asbestos2
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
09/20/2019421686394Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/28/2026Q00232633-I1Open ↗
▸Energy Compliance3
▸BISAS-BUILT ENERGY ANALYSIS1
01/05/2021421686394Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
01/05/2021421686394Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
09/20/2019421686394Open ↗
▸Inspections & Test Reports10
▸DOB NOWSOIL REPORT4
08/13/2026Q00810813-I1Open ↗
08/13/2026Q00810813-P1Open ↗
08/13/2026Q00810813-P2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWGeotechnical Report (BC 1803.6)4
08/13/2026Q00810813-P3Open ↗
08/13/2026Q00810813-P1Open ↗
08/13/2026Q00810813-I1Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY1
01/05/2021421686394Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026Q00810813-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
01/05/2021421686394Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
01/05/2021421686394Open ↗
09/20/2019421686394Open ↗
▸Filing & Intake Forms4
▸BISEFILING JOB APPLICATION COVER SHEET1
03/27/2023440774137Open ↗
▸BISADDITIONAL INFORMATION1
12/08/2025440774137Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
03/27/2023440774137Open ↗
▸BISEFILING COVER SHEET1
09/20/2019421686394Open ↗
▸Other Documents18
▸BISBPP - SUPPORTING DOCUMENTATION4
12/08/2025440774137Open ↗
12/08/2025440774137Open ↗
12/08/2025440774137Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSite Survey: Initial4
08/13/2026Q00810813-P3Open ↗
08/13/2026Q00810813-P2Open ↗
08/13/2026Q00810813-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone4
08/13/2026Q00810813-P2Open ↗
08/13/2026Q00810813-I1Open ↗
08/13/2026Q00810813-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProperty Ownership Certification4
08/18/2026Q00810813-I1Open ↗
08/18/2026Q00810813-P1Open ↗
08/18/2026Q00810813-P3Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q00810813-I1Open ↗
▸DOB NOWFinal Survey1
08/18/2026Q00810813-I1Open ↗